Drilling & Well Completion

tally

Tallying Up: A Crucial Step in Drilling & Well Completion

In the world of oil and gas exploration, accuracy is paramount. This is especially true when it comes to drilling and well completion, where every inch of pipe, casing, or tubing needs to be precisely accounted for. This is where the concept of "tally" comes into play.

Tally: More than just a number

In the context of drilling and well completion, tally refers to the systematic measurement and recording of the total length of pipe, casing, or tubing that is to be run in a well. This seemingly simple process is crucial for ensuring the integrity of the well and optimizing its performance.

Why is tallying so important?

  • Precise Well Design: Tallying provides a detailed record of the exact length of each pipe segment used in the well. This data is critical for accurate well design, ensuring that the wellbore is constructed according to specifications and that the correct amount of materials are used.
  • Safety and Efficiency: Accurate tallying helps prevent costly mistakes and safety hazards. For instance, if the tally is incorrect, it could lead to insufficient pipe length, resulting in a compromised well or even a potential blowout.
  • Production Optimization: By precisely measuring the length of casing and tubing, tallying allows for efficient production planning and optimization. It helps determine the appropriate lengths for different stages of well completion, ensuring optimal flow and reservoir access.
  • Cost Management: Tallying plays a significant role in managing costs associated with drilling and well completion. Accurate accounting of pipe lengths ensures that only the necessary materials are purchased and used, minimizing waste and unnecessary expenses.

How is tallying done?

Tallying is typically performed using a tally book or a digital tally system. These tools provide a structured method for recording the length of each pipe segment as it is run into the well.

Key elements of a tally book or system:

  • Pipe Type: Identifying the type of pipe being used (e.g., casing, tubing, drill pipe).
  • Pipe Size: Recording the diameter and wall thickness of the pipe.
  • Pipe Length: Measuring the exact length of each pipe segment, including any coupling connections.
  • Joint Number: Tracking the unique identifier for each pipe segment.
  • Run Information: Documenting the depth at which each pipe segment is run and any other relevant information.

Modernizing the Tally Process

While traditional tally books remain widely used, the industry is embracing digital tally systems for their efficiency and accuracy. These systems often use barcodes or RFID tags to automatically record pipe information, eliminating human error and streamlining the process.

Tally: A crucial pillar of well construction

Tallying is an often-overlooked but essential aspect of drilling and well completion. By meticulously measuring and recording the length of pipes used, tallying ensures well integrity, safety, and optimal production. This meticulous attention to detail is a testament to the high standards and accuracy required in the oil and gas industry.


Test Your Knowledge

Tallying Up Quiz:

Instructions: Choose the best answer for each question.

1. What does "tally" refer to in the context of drilling and well completion?

a) The number of people working on a drilling rig. b) The total length of pipe, casing, or tubing run in a well. c) The type of drilling fluid used in a well. d) The depth at which a well is drilled.

Answer

The correct answer is **b) The total length of pipe, casing, or tubing run in a well.**

2. Which of the following is NOT a benefit of accurate tallying?

a) Precise well design. b) Improved safety and efficiency. c) Reduced production costs. d) Determining the type of drilling fluid used.

Answer

The correct answer is **d) Determining the type of drilling fluid used.** Tallying focuses on pipe measurements, not drilling fluid types.

3. What is a common tool used for tallying?

a) A geological map. b) A drilling rig. c) A tally book or digital tally system. d) A pressure gauge.

Answer

The correct answer is **c) A tally book or digital tally system.**

4. What information is typically NOT recorded in a tally book or system?

a) Pipe type. b) Pipe size. c) Pipe length. d) The names of the workers on the rig.

Answer

The correct answer is **d) The names of the workers on the rig.** Tallying focuses on pipe specifications and measurements.

5. Why are digital tally systems becoming more popular in the oil and gas industry?

a) They are less expensive than traditional tally books. b) They require less training to use. c) They offer greater accuracy and efficiency. d) They are only used in offshore drilling operations.

Answer

The correct answer is **c) They offer greater accuracy and efficiency.** Digital systems reduce human error and streamline the process.

Tallying Up Exercise:

Scenario: You are a drilling engineer responsible for tallying pipe for a new well. You are using a traditional tally book. The following pipe segments are being run:

  • Pipe Type: Casing
  • Pipe Size: 10-inch diameter, 30-pound weight
  • Pipe Lengths: 40 feet, 38 feet, 42 feet, 40 feet, 39 feet

Task:

  1. Complete the following tally book entry for the first pipe segment:

| Pipe Type | Pipe Size | Pipe Length | Joint Number | Run Depth | |---|---|---|---|---| | Casing | 10-inch, 30-pound | | | |

  1. Calculate the total length of casing run so far.

Exercice Correction

1. **Completed Tally Book Entry:** | **Pipe Type** | **Pipe Size** | **Pipe Length** | **Joint Number** | **Run Depth** | |---|---|---|---|---| | Casing | 10-inch, 30-pound | **40 feet** | 1 | |

2. **Total Casing Length:** 40 feet (first pipe segment)


Books

  • "Drilling Engineering" by Robert E. Woods - A comprehensive textbook on drilling engineering, including chapters on well planning and completion. The book likely covers tallying in detail.
  • "Well Completion Engineering" by J.M. Watkins and W.L. Dodson - This book specifically focuses on well completion and would likely contain information on tallying procedures.
  • "Oil Well Drilling Engineering" by William C. Lyons - Another comprehensive textbook that covers drilling and well completion.

Articles

  • "Tallying: A Crucial Step in Well Completion" by [Your Name] - You can write this article based on the content you provided, highlighting the importance of tallying.
  • "Digital Tally Systems: Revolutionizing Well Completion" by [Industry Journal] - Look for articles in industry publications that discuss the benefits of using digital tally systems.
  • "The Importance of Accurate Tallying in Well Construction" by [Industry Professional] - Search for articles or blog posts by professionals in the field who discuss the importance of tallying.

Online Resources

  • Society of Petroleum Engineers (SPE) website: The SPE website hosts a vast library of technical papers and resources related to oil and gas engineering. Search for terms like "tally," "well completion," "pipe measurement," and "well design."
  • Oil & Gas Journal website: This journal publishes articles and news related to the oil and gas industry. You can find articles discussing tallying and its importance.
  • Industry Websites: Check websites of companies that provide drilling and well completion services or equipment. They often have resources and information on best practices, including tallying.

Search Tips

  • Use specific keywords: Use keywords like "tally," "well completion," "drilling," "pipe measurement," "casing," "tubing," and "well design."
  • Combine keywords: Try combinations of keywords to narrow down your search, for example, "tallying in well completion" or "digital tally systems."
  • Use quotation marks: Use quotation marks around specific phrases to find exact matches, e.g., "tally book."
  • Specify website types: Use "filetype:pdf" to find PDF documents, "filetype:ppt" for PowerPoint presentations, etc.
  • Use advanced operators: Use operators like "AND," "OR," and "NOT" to refine your search.

Techniques

Chapter 1: Techniques

Tallying Techniques: A Guide to Accurate Measurement and Recording

Tallying, as discussed in the introduction, is the meticulous process of measuring and recording the length of pipes used in drilling and well completion. This chapter delves into the diverse techniques used to ensure accurate tallying, highlighting their strengths and limitations.

1.1 Manual Tallying:

This traditional method relies on a tally book, a physical document where data is manually recorded. It involves:

  • Visual Inspection: The length of each pipe segment is physically measured using a tape measure or ruler.
  • Manual Entry: The measured length is then recorded in the tally book, alongside other crucial information like pipe type, size, and joint number.

Pros:

  • Simplicity and Cost-effectiveness: Requires minimal equipment and can be performed by skilled personnel.
  • Flexibility: Suitable for various scenarios, including remote locations with limited access to technology.

Cons:

  • Human Error: Manual recording is prone to errors, potentially leading to inaccuracies.
  • Time Consuming: The process is labor-intensive and can slow down operations.
  • Difficult to Track: Tracking and analyzing data from tally books can be cumbersome.

1.2 Digital Tally Systems:

Modern tally systems utilize digital tools for automatic data recording. These systems leverage:

  • Barcode Readers: Barcodes are attached to each pipe segment, allowing for quick and accurate identification and measurement.
  • RFID Tags: Radio Frequency Identification tags provide a wireless method for identifying and recording pipe information.
  • Software Applications: Digital data is captured and stored in specialized software for analysis and reporting.

Pros:

  • Accuracy and Efficiency: Automated systems significantly reduce the risk of human error and streamline the process.
  • Data Management: Digital records are easily accessible, searchable, and can be used for comprehensive analysis.
  • Integration: Digital systems can seamlessly integrate with other drilling and well completion software for improved workflow.

Cons:

  • Initial Investment: Implementing digital systems requires a significant upfront investment in hardware and software.
  • Technical Expertise: Operators need to be trained to use and maintain the digital system.
  • Connectivity Requirements: Digital systems require reliable internet connectivity for data transmission.

1.3 Hybrid Approach:

Combining manual and digital techniques can provide a balanced approach for tallying. For instance, a tally book can be used to record initial information while a digital system can be used for final verification and data storage.

1.4 Conclusion:

The choice of tallying technique depends on factors like budget, available resources, project requirements, and desired level of accuracy. Regardless of the method used, thorough training and adherence to best practices are crucial for ensuring precise and reliable tallying.

Similar Terms
Stakeholder ManagementPipeline Construction
  • Tally Tallying Up: The Essential Ro…
Most Viewed
Categories

Comments


No Comments
POST COMMENT
captcha
Back