What is PDM Finish to Start Relationship used in Oil & Gas Processing?
Asked 2 months, 3 weeks ago | Viewed 126times
0

How does the PDM Finish-to-Start relationship, specifically in the context of Oil & Gas Processing, affect the overall project timeline and resource allocation, considering the inherent dependencies and potential delays associated with upstream and downstream activities, and what strategies can be employed to mitigate these risks?

comment question
1 Answer(s)
0

PDM Finish to Start Relationship in Oil & Gas Processing

PDM (Project Data Management) is a crucial aspect of managing complex projects like those in the oil and gas industry. It helps streamline workflows, track progress, and ensure efficient resource allocation.

Finish-to-Start (FS) is a dependency relationship type within PDM. It signifies that a successor activity can only start after a predecessor activity is completely finished.

Here's how it's used in Oil & Gas processing:

  • Drilling Operations:

    • Predecessor: Drilling a well.
    • Successor: Installing casing and cementing the well.
    • FS Relationship: The casing and cementing cannot begin until the well is drilled to the specified depth and the necessary geological data is collected.
  • Pipeline Construction:

    • Predecessor: Laying the pipeline.
    • Successor: Pressure testing and commissioning of the pipeline.
    • FS Relationship: The pressure testing and commissioning can only commence after the pipeline is laid and inspected for defects.
  • Plant Construction:

    • Predecessor: Erecting the main process units.
    • Successor: Installing the piping and instrumentation.
    • FS Relationship: The installation of piping and instrumentation requires the process units to be fully erected and secured.
  • Process Control Systems:

    • Predecessor: Installing the hardware and software for the control system.
    • Successor: Testing and commissioning the control system.
    • FS Relationship: The testing and commissioning process can only start after the control system is fully installed and configured.

Advantages of using the Finish-to-Start relationship:

  • Ensures a logical sequence: It prevents activities from starting before their dependencies are met, avoiding delays and resource conflicts.
  • Optimizes resource allocation: It allows for efficient scheduling and allocation of resources, as activities are planned based on their logical dependencies.
  • Reduces risk: By ensuring that activities are completed in the correct order, it minimizes the risk of errors and rework.
  • Improves communication and coordination: The clear dependency relationships improve communication and coordination between teams and stakeholders.

Overall, the Finish-to-Start relationship in PDM plays a vital role in managing the complex and time-sensitive projects in the oil and gas industry. It ensures that activities are completed in the correct sequence, optimizes resource allocation, and minimizes risks, ultimately contributing to project success.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
How to use Monte Carlo similation using python to similate Project Risks?
What is the scientific classification of an atom?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back