What is Junk used in Drilling & Well Completion?
Asked 3 months ago | Viewed 61times
0

How does the definition of "junk" in drilling and well completion differ from its common usage, and what are the specific challenges posed by "junk" in each stage of the well lifecycle, considering its impact on operational efficiency, cost, and safety?

comment question
1 Answer(s)
0

"Junk" in drilling and well completion refers to any unwanted material found in the wellbore, which can be a significant problem during operations. This material can include:

1. Equipment Failure:

  • Broken tools: Drill bits, drill collars, casing, tubing, packers, or other equipment may break during operations.
  • Tool remnants: Pieces of tools, such as drill collars or casing, may be left behind during operations.
  • Wireline equipment: Wireline tools, such as logging tools, may break and become stuck in the wellbore.

2. Formation Materials:

  • Rock fragments: Pieces of rock from the formation can be brought up from the wellbore and become trapped.
  • Sand: Sand from the formation can be washed into the wellbore.
  • Gravel: Gravel from the formation can be washed into the wellbore.

3. Other Materials:

  • Cement: Cement can become trapped in the wellbore.
  • Scale: Mineral deposits can form on the tubing and casing, restricting flow.
  • Corrosion products: Corrosion can form on the tubing and casing, leading to debris.

Problems Caused by Junk:

  • Stuck pipe: Junk can cause the drill string to become stuck in the wellbore.
  • Wellbore obstruction: Junk can restrict the flow of fluids, gas, and oil.
  • Equipment damage: Junk can damage equipment, such as pumps and valves.
  • Wellbore instability: Junk can contribute to wellbore instability, causing wellbore collapse.

Junk Removal Methods:

  • Fishing: This involves using specialized tools to retrieve the junk from the wellbore.
  • Milling: This involves using a milling tool to cut the junk into smaller pieces, which can then be removed from the wellbore.
  • Washing: This involves using a high-pressure water jet to remove the junk from the wellbore.
  • Drilling: This involves drilling through the junk, which can be used to remove large pieces of junk.

Preventing Junk:

  • Proper equipment maintenance: Keeping equipment in good working order helps prevent failures.
  • Careful drilling practices: Using appropriate drilling techniques and procedures helps prevent junk from being created.
  • Regular wellbore inspections: This allows for the early detection and removal of junk.

Overall, junk in drilling and well completion is a serious problem that can lead to significant costs and delays. Understanding the causes, problems, and methods for dealing with junk is essential for safe and efficient well operations.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
How to use Monte Carlo similation using python to similate Project Risks?
What is the scientific classification of an atom?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back