Glossary of Technical Terms Used in Project Planning & Scheduling: Work Measurement

Work Measurement

Work Measurement: The Foundation of Accurate Cost Estimation and Control

In the realm of cost estimation and control, understanding the time required to complete specific tasks is crucial. Work measurement, a systematic approach to analyzing and quantifying labor requirements, serves as a vital tool in this process. It involves developing labor-time standards, which are benchmarks representing the time needed by a skilled worker to perform a particular task or group of tasks under defined conditions.

The Essence of Work Measurement

Work measurement delves into the intricacies of work processes, identifying the most efficient methods and establishing precise time allocations for each step. This process offers numerous benefits:

  • Accurate Cost Estimation: By accurately predicting labor hours, businesses can generate realistic cost estimates for projects, bids, and production runs, promoting profitability.
  • Effective Labor Control: Work standards act as a control mechanism, allowing for monitoring and improvement of worker productivity and efficiency.
  • Fairer Incentive Schemes: Labor-time standards form the basis for performance-based compensation schemes, ensuring that employees are fairly rewarded for their effort and output.
  • Enhanced Planning and Scheduling: Reliable work time estimates enable better project planning, resource allocation, and scheduling, leading to smoother operations.
  • Improved Productivity: By identifying bottlenecks and inefficiencies, work measurement helps to streamline processes and increase overall productivity.

Methods of Work Measurement

Several established techniques are commonly employed for work measurement:

  • Time Study: This traditional method involves observing a skilled worker performing a task multiple times, recording the time taken for each element, and analyzing the data to establish a standard time.
  • Work Sampling: This method involves observing a worker at random intervals throughout the day to capture a representative sample of their activities. This data is then used to calculate the percentage of time spent on different tasks and establish time standards.
  • Predetermined Time Systems (PTS): These systems utilize pre-established time values for basic work elements, such as reaching, grasping, and moving objects. These pre-determined values are then combined to estimate the time required for specific tasks.
  • Historical Data Analysis: Leveraging past records of completed work can provide valuable insights into time required for similar tasks. This method is most effective when past data is reliable and representative of current conditions.

Challenges and Considerations

While work measurement offers significant advantages, it's essential to address potential challenges:

  • Subjectivity: Time study and work sampling can be influenced by the observer's judgment and the worker's performance during the observation period.
  • Complexity: Establishing accurate time standards for complex tasks, involving multiple steps and variables, can be challenging.
  • Resistance to Change: Workers may resist changes in work methods introduced by work measurement, potentially affecting its effectiveness.

Conclusion

Work measurement is a critical component of effective cost estimation and control. By accurately quantifying labor requirements, it empowers businesses to make informed decisions, manage costs effectively, and ensure fair compensation for their employees. By choosing the appropriate work measurement techniques and addressing potential challenges, organizations can leverage this powerful tool to enhance efficiency, productivity, and profitability.


Test Your Knowledge


Books


Articles


Online Resources


Search Tips

Similar Terms
Cost Estimation & Control
Project Planning & Scheduling
Oil & Gas Processing
Pipeline Construction
Regulatory Compliance
Oil & Gas Specific Terms
Risk Management
Most Viewed

Comments


No Comments
POST COMMENT
captcha
Back