Glossary of Technical Terms Used in Functional Testing: Baseline - Technical

Baseline - Technical

Baseline - A Foundation for Technical Success

In the world of technical development, a baseline is more than just a starting point - it's a crucial foundation for ensuring project success. It represents a snapshot of the project's state at a specific point in time, serving as a reference point for future development and decision-making.

The baseline encompasses a comprehensive collection of documents and configurations, each playing a vital role in defining and managing the project's progress. Let's delve into the key components:

1. User Requirements Document (URD): This document captures the user's needs and expectations for the project. It acts as the primary guide, outlining the functionality, performance, and usability requirements from the user's perspective.

2. System Requirements Document (SRD): This document translates the user requirements into technical specifications, defining the system's functionalities, interfaces, and constraints. It provides a detailed blueprint for the development team.

3. Concept Definition Document (CDD): This document lays out the overall concept and high-level design of the system, including its architecture, key components, and major features. It serves as a preliminary roadmap for the project's direction.

4. System Specifications: This document outlines the technical details of the system, including hardware and software requirements, communication protocols, and data structures. It provides a technical framework for the development team.

5. "Design-to" Specifications: These documents define the design parameters and standards that the development team must adhere to during the design phase. They ensure consistency and alignment with the overall project objectives.

6. "Build-to" Documents: These documents specify the exact components, materials, and procedures required for building the system. They act as a detailed construction manual for the development team.

7. "As Built," "As Tested," "As Accepted," and "As Operated" Configurations: These configurations capture the actual state of the system at different stages of its lifecycle. "As built" reflects the final built system, "As tested" reflects the system after testing, "As accepted" reflects the system after acceptance by the stakeholders, and "As operated" reflects the system in its operational environment.

Benefits of Establishing a Baseline:

  • Clearly defined project scope: The baseline provides a definitive understanding of the project's objectives, functionalities, and limitations.
  • Improved communication: It facilitates clear communication between different stakeholders by providing a common reference point for understanding the project.
  • Enhanced control and management: The baseline enables effective tracking and monitoring of project progress against established requirements.
  • Reduced risk of deviations: By establishing a baseline, changes and deviations from the initial plan can be easily identified and addressed.
  • Improved decision-making: The baseline provides a solid foundation for making informed decisions regarding project scope, resources, and timelines.

In conclusion, the baseline serves as a crucial cornerstone for any technical development project. It provides a comprehensive framework for defining, managing, and controlling the project's scope, ensuring that the final product meets the desired requirements and objectives. By establishing a robust baseline, organizations can streamline their development processes, mitigate risks, and achieve greater project success.


Test Your Knowledge


Books


Articles


Online Resources


Search Tips

Similar Terms
Oil & Gas Processing
Pipeline Construction
Communication & Reporting
Handover to Operations
Project Planning & Scheduling
Oil & Gas Specific Terms
General Technical Terms
Drilling & Well Completion
Safety Training & Awareness
Lifting & Rigging
Most Viewed

Comments


No Comments
POST COMMENT
captcha
Back