What is Pre-Tender Estimate used in Cost Estimation & Control?
Asked 3 months, 3 weeks ago | Viewed 86times
1

How does a Pre-Tender Estimate differ in its scope, methodology, and level of detail compared to a Detailed Estimate, and how does this difference influence its role in the overall cost estimation and control process for a project, particularly in relation to winning bids and managing project risk?

comment question
1 Answer(s)
1

Pre-Tender Estimate in Cost Estimation & Control

A Pre-Tender Estimate is a preliminary cost assessment used during the early stages of a project, specifically before submitting a tender bid. It's a crucial tool for evaluating the feasibility and profitability of a project before committing resources and time.

Here's a breakdown of its role in cost estimation and control:

Purpose:

  • Project Feasibility: Determine if the project is financially viable.
  • Pricing Strategy: Inform the bid price, ensuring competitiveness and profitability.
  • Risk Assessment: Identify potential cost overruns and develop mitigation strategies.
  • Resource Allocation: Estimate the required resources (labor, materials, equipment) for project planning.

Characteristics:

  • Preliminary: Based on limited information and assumptions.
  • Rough: Accuracy level is lower compared to detailed estimates.
  • Based on Historical Data: Draws on past projects and market prices.
  • Iterative: Can be refined as more information becomes available.

How It's Used:

  1. Gather Information: Collect preliminary data on project scope, materials, labor, and market conditions.
  2. Estimate Costs: Use cost databases, historical data, and industry benchmarks to calculate estimated costs.
  3. Analyze Risks: Identify potential cost fluctuations and quantify their impact.
  4. Determine Profitability: Calculate a potential profit margin based on the estimated costs and desired return on investment.
  5. Refine the Estimate: As more information becomes available, the estimate can be adjusted and refined.

Advantages:

  • Early Stage Decision-Making: Allows for early evaluation of project feasibility.
  • Competitive Bidding: Provides a basis for formulating a competitive bid.
  • Resource Planning: Provides a foundation for resource allocation and project planning.

Disadvantages:

  • Limited Accuracy: Due to limited information, the estimate can be inaccurate.
  • Assumptions: Relies on assumptions that may not hold true in the future.
  • Risk of Oversimplification: May not capture all potential costs or risks.

In Conclusion:

A Pre-Tender Estimate is a critical component of cost estimation and control. It allows for informed decision-making in the early stages of a project, ensuring feasibility, competitiveness, and effective resource allocation. While it provides a rough estimate, it lays the groundwork for more detailed cost analysis and effective project management.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
What is the scientific classification of an atom?
How to use Monte Carlo similation using python to similate Project Risks?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back