Cost Estimation & Control

ROM

ROM: A Rough Guide to Oil & Gas Estimates

In the dynamic world of oil and gas exploration and production, accurate cost estimation is crucial. A Rough Order of Magnitude (ROM) estimate, often simply referred to as ROM, plays a vital role in the early stages of project development.

What is a ROM?

A ROM estimate is a preliminary cost evaluation that provides a broad overview of a project's potential expenses. It's typically the first step in cost assessment, performed during the initial feasibility study or conceptual design phase.

Key characteristics of a ROM:

  • Early stage: Performed before detailed engineering or design.
  • High level of uncertainty: Based on limited data and assumptions.
  • Accuracy range: +/- 30% to 50% of actual cost.
  • Purpose: To provide a quick and preliminary cost assessment for:
    • Initial project screening and evaluation
    • Identifying potential risks and challenges
    • Supporting early-stage decision-making
    • Guiding subsequent detailed cost estimates

How is a ROM developed?

ROM estimates rely heavily on historical data, analogies, and expert judgment. The process involves:

  1. Defining the project scope: Identifying the key components, activities, and deliverables.
  2. Gathering data: Collecting information on similar projects, market prices, and industry trends.
  3. Applying cost estimation methods: Using techniques like parametric costing, cost per unit, or historical data analysis.
  4. Considering uncertainties: Identifying potential risks and contingencies that could impact costs.
  5. Developing a preliminary cost estimate: Presenting the estimated total cost, broken down by major cost categories.

Importance of ROM in Oil & Gas:

  • Decision-making: ROMs help to quickly assess project viability and allocate resources efficiently.
  • Investment justification: Provides a basis for attracting investors and securing funding.
  • Risk management: Identifies potential cost overruns and allows for early mitigation strategies.
  • Project planning: Sets the stage for more detailed cost estimates and project scheduling.

ROM vs. Other Cost Estimates:

  • Detailed estimate: More accurate and comprehensive, but requires detailed engineering and design (typically +/- 10% to 15% accuracy).
  • Preliminary estimate: Slightly more accurate than a ROM but still relies on limited information (typically +/- 20% to 30% accuracy).

In conclusion, the ROM is a fundamental tool in the oil and gas industry, providing a crucial starting point for cost evaluation and project planning. While not as precise as later cost estimates, its ability to quickly assess project viability and manage risk makes it an indispensable part of the development process.


Test Your Knowledge

ROM Quiz:

Instructions: Choose the best answer for each question.

1. What is the primary purpose of a ROM estimate? a) To determine the exact cost of a project. b) To provide a detailed breakdown of all project expenses. c) To give a preliminary overview of potential project costs. d) To ensure project profitability.

Answer

c) To give a preliminary overview of potential project costs.

2. At what stage of project development is a ROM estimate typically conducted? a) After detailed engineering and design. b) During the initial feasibility study or conceptual design phase. c) Before securing funding. d) During project implementation.

Answer

b) During the initial feasibility study or conceptual design phase.

3. What is the typical accuracy range of a ROM estimate? a) +/- 5% to 10% b) +/- 10% to 15% c) +/- 20% to 30% d) +/- 30% to 50%

Answer

d) +/- 30% to 50%

4. Which of the following is NOT a key benefit of using ROM estimates in the oil & gas industry? a) Facilitating efficient resource allocation. b) Identifying potential cost overruns. c) Providing a definitive cost budget for the project. d) Supporting early-stage decision-making.

Answer

c) Providing a definitive cost budget for the project.

5. What is the main difference between a ROM estimate and a detailed estimate? a) A detailed estimate includes more uncertainties. b) A ROM estimate is more accurate than a detailed estimate. c) A detailed estimate requires more data and analysis. d) A ROM estimate is used for project feasibility studies, while a detailed estimate is used for project planning.

Answer

c) A detailed estimate requires more data and analysis.

ROM Exercise:

Scenario: You are a junior engineer tasked with developing a ROM estimate for a new offshore drilling platform project. The platform is expected to be capable of drilling to depths of 10,000 feet and will be located in a challenging environment with strong currents.

Task: Using the information provided, outline the key steps you would take to develop a ROM estimate for this project. Include a brief description of the data you would need to gather and the cost estimation methods you would consider using.

Exercice Correction

Here's a possible approach to developing a ROM estimate for the offshore drilling platform:

1. Define Project Scope: * Identify the key components of the platform: drilling rig, platform structure, living quarters, support vessels, etc. * Define the activities involved: design, fabrication, installation, commissioning, etc. * Define the deliverables: a fully operational drilling platform ready for production.

2. Gather Data: * Historical data: Research similar offshore drilling projects (size, depth, location) and gather information on their costs. * Market prices: Obtain estimates for materials, equipment, labor, and other relevant costs in the current market. * Industry trends: Analyze recent trends in offshore drilling costs, technological advancements, and environmental regulations. * Environmental factors: Consider the impact of strong currents on construction and installation costs, and potential environmental mitigation measures.

3. Cost Estimation Methods: * Parametric costing: Use historical data and cost per unit (e.g., cost per square foot of platform structure, cost per ton of steel) to estimate costs. * Cost per unit: Apply cost per unit (e.g., cost per day of drilling rig operation) to estimate costs based on project duration. * Historical data analysis: Analyze costs from similar projects adjusted for inflation, complexity, and environmental factors.

4. Identify Uncertainties: * Market fluctuations: Potential changes in material prices, labor costs, and exchange rates. * Environmental challenges: Unexpected delays or cost overruns due to weather conditions or environmental regulations. * Technological advancements: The need for unexpected modifications or updates to the design or equipment.

5. Develop Preliminary Cost Estimate: * Combine the cost estimates from different methods, considering uncertainties and potential risks. * Present a total estimated cost for the project, broken down by major cost categories (engineering, fabrication, installation, etc.).

Note: The ROM estimate should be presented with a clear disclaimer indicating its accuracy range (e.g., +/- 30% to 50%) and the need for further detailed cost estimates.


Books

  • Cost Engineering by Dr. C.F. Hauer & Dr. Richard A. Moreland: A comprehensive resource on cost engineering principles, including detailed sections on ROM and other cost estimation techniques.
  • Project Management for the Oil & Gas Industry by John A. Page: Covers the full project lifecycle in the oil & gas industry, emphasizing the importance of cost estimation and ROM in early phases.
  • Cost Estimating for Oil & Gas Projects by Edward G. Tietze: Specifically addresses cost estimation in the oil & gas industry, providing detailed methodologies and examples.

Articles

  • "Rough Order of Magnitude Cost Estimation for Oil and Gas Projects" by the Society of Petroleum Engineers (SPE): A technical paper discussing ROM techniques specifically tailored to oil & gas projects.
  • "ROM Estimates: A Crucial Tool for Oil and Gas Project Planning" by World Oil Magazine: An overview of ROM and its significance in oil & gas project development.
  • "Cost Estimating in Oil & Gas: A Guide to Best Practices" by Oil & Gas Journal: A comprehensive article covering different cost estimation methods, including ROM, and their applications in the industry.

Online Resources

  • The Society of Petroleum Engineers (SPE): Website with articles, publications, and resources on various aspects of oil & gas exploration and production, including cost estimation.
  • The American Association of Cost Engineers (AACE): Offers resources and certifications related to cost engineering, including information on ROM and other cost estimation techniques.
  • Oil & Gas Journal: A reputable industry publication with articles and resources covering a wide range of topics, including cost estimation and project management.

Search Tips

  • "ROM cost estimation oil and gas": This will narrow down your search results to relevant content.
  • "Rough order of magnitude estimate examples oil and gas": You can find articles, blog posts, and case studies showcasing real-world examples of ROM in the oil & gas industry.
  • "Cost estimation methods oil and gas": This search will provide information on different methods used for cost estimation, including ROM.

Techniques

Chapter 1: Techniques for ROM Estimation

This chapter explores the various techniques commonly employed in developing ROM estimates within the oil and gas industry.

1.1 Parametric Costing: - This technique uses historical data and statistical analysis to create relationships between project characteristics (e.g., size, capacity, location) and project costs. - For example, a ROM estimate for a new oil well could be derived by comparing its anticipated production capacity to the cost of previously drilled wells with similar characteristics. - Advantages: Quick and easy, especially when historical data is available. - Disadvantages: Can be inaccurate if the project differs significantly from past projects, and requires reliable historical data.

1.2 Cost per Unit: - This approach estimates the cost of a project by multiplying the quantity of units required by the cost per unit. - For instance, the cost of a pipeline could be estimated by multiplying the pipeline's length by the cost per unit length (e.g., cost per kilometer). - Advantages: Relatively straightforward, useful for projects with easily quantifiable units. - Disadvantages: Can be inaccurate if the cost per unit varies significantly across the project, and requires careful unit selection.

1.3 Historical Data Analysis: - This technique involves using past project data to estimate the cost of a similar new project. - For example, the cost of a new offshore platform could be estimated by analyzing the cost of similar platforms built in the past, adjusting for inflation and changes in market conditions. - Advantages: Can be accurate if the project is similar to past projects, leverages real-world experience. - Disadvantages: Limited by the availability and relevance of historical data, assumes past trends will hold.

1.4 Expert Judgment: - This technique relies on the experience and expertise of professionals within the industry to provide cost estimates. - It often involves collecting input from multiple experts and then combining their judgments to reach a consensus estimate. - Advantages: Useful when historical data is limited or unavailable, leverages industry expertise. - Disadvantages: Subjective, susceptible to bias and individual experience limitations.

1.5 Combined Approaches: - It is often beneficial to combine multiple techniques for a more robust ROM estimate. - This allows for cross-checking and validation of the results, providing a more reliable starting point for subsequent cost evaluations.

1.6 Conclusion:

Selecting the most appropriate ROM estimation technique depends on the specific project, data availability, and desired accuracy. Each technique has its strengths and weaknesses, and a combination of approaches is often employed for a more accurate and comprehensive ROM estimate.

Similar Terms
Drilling & Well CompletionOil & Gas ProcessingAsset Integrity ManagementStakeholder ManagementInstrumentation & Control EngineeringCost Estimation & Control
Most Viewed
Categories

Comments


No Comments
POST COMMENT
captcha
Back