Glossary of Technical Terms Used in Lifting & Rigging: Resubmitted Lot

Resubmitted Lot

Resubmitted Lot: A Second Chance in Oil & Gas

In the demanding world of oil and gas, quality control is paramount. The slightest deviation from specifications can lead to costly delays, safety hazards, and environmental concerns. To ensure adherence to strict quality standards, the concept of a "resubmitted lot" arises.

What is a Resubmitted Lot?

A resubmitted lot refers to a batch of materials, components, or equipment that has initially failed to meet acceptance criteria. This could be due to defects detected during initial inspection, testing, or both. The rejected lot is then subjected to a thorough examination, which may involve:

  • Identifying the root cause of the defect: This could be a manufacturing error, material inconsistency, or design flaw.
  • Implementing corrective actions: The defective units might be reworked, repaired, or replaced entirely depending on the severity of the issue.
  • Retesting: The corrected lot undergoes a fresh round of testing to ensure it now meets the required standards.

Why Resubmit?

Resubmitting a lot may seem like a tedious process, but it serves several critical purposes:

  • Guaranteeing Quality: By addressing the root cause of the defect and retesting, resubmission ensures that the final product meets the required quality standards. This is vital for the safety and reliability of oil and gas operations.
  • Cost-Effective Solution: While rejecting an entire lot might seem like the only option, resubmission often proves more cost-effective. By reworking or replacing only the defective units, the overall cost of the project can be significantly reduced.
  • Improving Manufacturing Processes: Each resubmission provides valuable feedback for manufacturers. By analyzing the causes of defects, manufacturers can identify areas for improvement in their production processes, ultimately leading to higher quality and fewer rejected lots in the future.

The Process of Resubmission

The resubmission process typically involves the following steps:

  1. Rejection: The initial lot is rejected due to failure to meet specifications.
  2. Investigation: The root cause of the defect is determined through detailed inspection and testing.
  3. Corrective Action: The defective units are reworked, repaired, or replaced.
  4. Retesting: The corrected lot is retested to ensure compliance with the original standards.
  5. Acceptance/Rejection: Based on the retesting results, the lot is either accepted and released for use or rejected again.

In Conclusion

The resubmitted lot concept plays a crucial role in maintaining high quality standards within the oil and gas industry. It ensures that only compliant materials and equipment are used in projects, minimizing risks and promoting safe and reliable operations. Through this process, both manufacturers and end-users benefit from improved quality, cost-effectiveness, and continuous process improvement.


Test Your Knowledge

Quiz: Resubmitted Lot in Oil & Gas

Instructions: Choose the best answer for each question.

1. What is a resubmitted lot in the context of oil and gas?

a) A batch of materials that has been upgraded to meet new specifications. b) A batch of materials that has been rejected for failing to meet quality standards, but has been corrected and re-tested. c) A batch of materials that has been ordered by a different customer after the initial order was completed. d) A batch of materials that has been stored for a long period and needs to be re-inspected before use.

Answer

b) A batch of materials that has been rejected for failing to meet quality standards, but has been corrected and re-tested.

2. Which of the following is NOT a reason for resubmitting a lot?

a) To ensure the safety and reliability of oil and gas operations. b) To meet regulatory requirements for quality control. c) To minimize the overall cost of the project. d) To increase the production rate of a specific component.

Answer

d) To increase the production rate of a specific component.

3. What is the primary goal of investigating a rejected lot?

a) To identify the cause of the defect and implement corrective actions. b) To determine if the defect was caused by the supplier or the manufacturer. c) To find a new supplier for the materials. d) To assess the financial impact of the rejection.

Answer

a) To identify the cause of the defect and implement corrective actions.

4. Which of the following is a possible corrective action for a resubmitted lot?

a) Accepting the lot as is, despite the defects. b) Using the defective materials in a less critical part of the project. c) Reworking or repairing the defective units. d) Discarding the entire lot and ordering new materials.

Answer

c) Reworking or repairing the defective units.

5. What is the significance of retesting a resubmitted lot?

a) To ensure the corrected lot meets the original quality standards. b) To determine if the corrective actions were effective. c) To provide data for future quality control initiatives. d) All of the above.

Answer

d) All of the above.

Exercise: Resubmitted Lot Scenario

Scenario: A batch of steel pipes for an oil pipeline project has been rejected because the wall thickness is inconsistent, leading to potential weakness and safety concerns.

Task:

  1. Identify the root cause: List at least three potential reasons for the inconsistent wall thickness.
  2. Propose corrective actions: For each potential root cause you identified, suggest a specific action that can be taken to address the issue.
  3. Describe the retesting process: What tests would need to be conducted on the resubmitted batch to ensure the pipes meet the necessary quality standards?

Exercice Correction

Here's a possible solution to the exercise:

1. Potential Root Causes:

  • Manufacturing error: The manufacturing process could have a flaw, such as inconsistent pressure or temperature settings, leading to variations in wall thickness.
  • Material inconsistency: The steel used for the pipes could have variations in its properties, leading to uneven wall thickness. This could be due to inconsistent material batches or defects in the material itself.
  • Design flaw: The design specifications for the pipe wall thickness might be unclear or inadequate, leading to inconsistencies during manufacturing.

2. Corrective Actions:

  • Manufacturing error: Adjust the manufacturing process parameters (pressure, temperature, etc.) based on detailed analysis and testing to ensure consistency.
  • Material inconsistency: Implement stricter quality control measures for incoming steel materials, including detailed inspection and testing to ensure consistent quality.
  • Design flaw: Review and revise the design specifications for the pipe wall thickness, ensuring clear and detailed instructions for the manufacturers.

3. Retesting Process:

  • Wall thickness measurement: Measure the wall thickness at multiple points along the length of each pipe, comparing the results to the specified tolerances.
  • Tensile strength test: Test the tensile strength of the pipe material to ensure it meets the required strength standards.
  • Hydrostatic pressure test: Subject the pipes to a specific pressure to verify their ability to withstand the intended operating pressures within the pipeline.


Books

  • Quality Management in the Oil and Gas Industry: Search for books on this topic, focusing on sections about quality control, inspection, and non-conforming materials.
  • Petroleum Engineering Handbooks: Handbooks like the "Petroleum Engineering Handbook" by Tarek Ahmed will contain information on materials, equipment, and quality standards used in the oil and gas sector.

Articles

  • Journal articles on quality assurance in the oil and gas industry: Search for articles in journals like "Journal of Petroleum Technology", "SPE Production & Operations", "Journal of Natural Gas Science and Engineering", or "Energy & Fuels" using keywords like "quality control", "non-conforming materials", "rework", "rejection", and "inspection".
  • Industry reports and white papers: Look for reports and papers from organizations like API (American Petroleum Institute), SPE (Society of Petroleum Engineers), or industry consultants focusing on quality management and standards in the oil and gas industry.

Online Resources

  • API Standards: API publishes numerous standards related to materials, equipment, and procedures used in the oil and gas industry. Check their website for relevant standards related to quality control and non-conforming materials.
  • ISO Standards: International Organization for Standardization (ISO) also has standards related to quality management that can be applicable to the oil and gas industry.
  • Industry Websites: Check websites of major oil and gas companies and equipment manufacturers for information on their quality management systems and policies.

Search Tips

  • Use specific keywords: Use keywords like "oil and gas", "quality control", "non-conforming materials", "rework", "rejection", "inspection", and "material acceptance".
  • Combine keywords: Try using combinations of keywords to narrow down your search, such as "quality control oil and gas non-conforming materials", or "rejection procedures oil and gas equipment".
  • Use quotes: Enclosing keywords in quotation marks (" ") will find exact phrases and refine your search results.
  • Filter by date and source: Filter your search results to focus on recent articles or publications from reputable sources.
Similar Terms
Oil & Gas Processing
Reservoir Engineering
  • Hall Plot Hall Plot: A Powerful Tool fo…
  • Pilot Piloting a Path to Success: U…
  • Pilot Hole The Pilot Hole: A Crucial Ste…
  • P/Z Plot Understanding Compartmentaliz…
Drilling & Well Completion
Quality Assurance & Quality Control (QA/QC)
  • Lot Understanding "Lot" in Oil &a…
Spare Parts Management
General Technical Terms
  • Lot Size Lot Size: A Key Term in Oil &…
IT Infrastructure
Pipeline Construction
Project Planning & Scheduling
Most Viewed

Comments


No Comments
POST COMMENT
captcha
Back