Distributed Control Systems (DCS)

Resourcing Plan

Resourcing Plan: A Crucial Blueprint for Oil & Gas Success

In the dynamic and demanding world of oil and gas, a well-defined Resourcing Plan serves as the bedrock for efficient project execution. It outlines the strategic allocation of human, financial, and physical resources, ensuring timely completion and maximizing return on investment.

What is a Resourcing Plan?

A Resourcing Plan is a comprehensive document that details the following:

  • Resource Identification: Identifying all personnel, equipment, materials, and services required for the project, including specific skillsets, qualifications, and certifications.
  • Resource Allocation: Assigning these resources to specific tasks, activities, and phases of the project, ensuring optimal utilization and preventing bottlenecks.
  • Resource Loading: This is a critical element, determining how the program will be resource loaded, i.e., how much workload each resource will handle at any given time. It involves analyzing resource availability, capacity, and potential constraints, ensuring realistic workloads and avoiding over-allocation.
  • Resource Management: Establishing clear procedures for managing resources, including recruitment, training, performance monitoring, and conflict resolution.
  • Cost Estimation: Calculating the financial requirements for each resource, including labor costs, equipment rentals, material procurement, and third-party services.
  • Timeline: Defining the duration of each activity and phase, ensuring timely completion of the project within budget and safety parameters.

Supporting Services, Infrastructure, and Third-Party Services

Beyond the core resource allocation, a comprehensive Resourcing Plan considers supporting services, infrastructure, and third-party services that are essential for project success. These may include:

  • Logistics: Securing transportation, warehousing, and distribution of materials and equipment to remote locations.
  • Infrastructure: Developing and maintaining access roads, communication systems, power sources, and other vital infrastructure elements.
  • Third-Party Services: Engaging specialized contractors and vendors for activities such as drilling, well completion, construction, environmental monitoring, and regulatory compliance.
  • Safety and Environmental Management: Implementing stringent safety protocols, environmental impact assessments, and emergency response plans to mitigate risks and protect the environment.

Benefits of a Strong Resourcing Plan

  • Improved Project Efficiency: By accurately allocating resources, avoiding overloads, and minimizing downtime, a robust Resourcing Plan facilitates smooth project execution and reduces delays.
  • Cost Optimization: Careful resource planning minimizes unnecessary expenses, avoids redundancies, and optimizes financial utilization.
  • Enhanced Communication: A well-documented plan ensures clear communication among project stakeholders, promoting collaboration and reducing confusion.
  • Risk Mitigation: By identifying potential bottlenecks and resource constraints, the plan enables proactive risk management and mitigation strategies.
  • Increased Accountability: A defined framework for resource utilization promotes transparency and accountability, fostering responsible project management.

In Conclusion

A Resourcing Plan is an indispensable tool for oil and gas companies, serving as a blueprint for efficient resource allocation and project success. By accurately assessing resource needs, optimizing resource loading, and integrating supporting services, companies can navigate the complexities of oil and gas projects with greater control, cost-effectiveness, and safety.


Test Your Knowledge

Quiz: Resourcing Plan in Oil & Gas

Instructions: Choose the best answer for each question.

1. What is the primary purpose of a Resourcing Plan in the oil and gas industry?

a) To secure funding for projects. b) To monitor environmental impact. c) To ensure efficient allocation of resources for project success. d) To manage regulatory compliance.

Answer

c) To ensure efficient allocation of resources for project success.

2. Which of the following is NOT a key component of a comprehensive Resourcing Plan?

a) Resource identification b) Resource allocation c) Resource loading d) Project marketing strategy

Answer

d) Project marketing strategy

3. What does "resource loading" refer to in the context of a Resourcing Plan?

a) Identifying the types of resources needed for the project. b) Determining the workload each resource will handle at any given time. c) Estimating the cost of each resource. d) Recruiting and training personnel.

Answer

b) Determining the workload each resource will handle at any given time.

4. Which of the following is NOT a benefit of a strong Resourcing Plan?

a) Improved project efficiency b) Increased risk of delays c) Cost optimization d) Enhanced communication among stakeholders

Answer

b) Increased risk of delays

5. Besides core resource allocation, a comprehensive Resourcing Plan also considers:

a) Marketing and advertising strategies. b) Supporting services, infrastructure, and third-party services. c) Employee benefits packages. d) Public relations campaigns.

Answer

b) Supporting services, infrastructure, and third-party services.

Exercise: Resource Allocation Scenario

Scenario: You are a project manager for an oil and gas exploration project in a remote location. Your team needs the following resources:

  • Personnel: Geologist, Drilling Engineer, Safety Officer, 10 Drilling Crew members
  • Equipment: Drilling Rig, Seismic Equipment, Support Vehicles, Safety Equipment
  • Materials: Drilling Mud, Cement, Pipes, Fuel
  • Third-party services: Logistics company for transportation, Environmental consultant for monitoring, Security firm for site protection

Task:

  1. Identify potential resource constraints: Consider factors like availability, transportation logistics, and local regulations.
  2. Develop a preliminary resource allocation plan: Assign resources to specific tasks and phases of the project (e.g., site preparation, drilling, well completion).
  3. Highlight any potential bottlenecks or challenges: Explain how you would address them.

Exercice Correction

**Potential Resource Constraints:** * **Personnel:** Skilled labor shortage in the remote location, difficulty attracting qualified personnel. * **Equipment:** Limited availability of specialized drilling rigs in the region, transportation logistics to the remote site. * **Materials:** Procurement challenges for specialized materials due to the remote location, potential for supply chain disruptions. * **Third-party services:** Finding reliable and experienced logistics, environmental, and security firms in the region. **Preliminary Resource Allocation Plan:** * **Site Preparation Phase:** * **Personnel:** Geologist, Safety Officer, 2 Drilling Crew members. * **Equipment:** Support Vehicles, Safety Equipment. * **Materials:** Fuel. * **Third-Party Services:** Logistics company, Environmental consultant. * **Drilling Phase:** * **Personnel:** Drilling Engineer, Geologist, 8 Drilling Crew members, Safety Officer. * **Equipment:** Drilling Rig, Seismic Equipment, Support Vehicles, Safety Equipment. * **Materials:** Drilling Mud, Cement, Pipes, Fuel. * **Third-Party Services:** Logistics company, Environmental consultant, Security firm. * **Well Completion Phase:** * **Personnel:** Drilling Engineer, Geologist, 2 Drilling Crew members, Safety Officer. * **Equipment:** Support Vehicles, Safety Equipment. * **Materials:** Cement, Pipes, Fuel. * **Third-Party Services:** Logistics company, Environmental consultant. **Potential Bottlenecks & Challenges:** * **Transportation:** Limited access to the remote location, potential for delays and high transportation costs. * **Skilled labor:** Attracting and retaining qualified personnel in the remote location is challenging. * **Material procurement:** Sourcing specialized materials in a remote location can be difficult and expensive. * **Regulatory compliance:** Ensuring compliance with local environmental and safety regulations. **Addressing Challenges:** * **Transportation:** Secure early access to the site, explore alternative transportation methods, consider pre-positioning materials. * **Skilled labor:** Offer competitive salaries and benefits packages, provide training and development opportunities, leverage local resources. * **Material procurement:** Secure long-term contracts with suppliers, develop contingency plans for supply chain disruptions, consider pre-ordering essential materials. * **Regulatory compliance:** Engage with local authorities early on, ensure compliance with environmental impact assessments, and develop comprehensive safety protocols.


Books

  • Project Management: A Systems Approach to Planning, Scheduling, and Controlling by Harold Kerzner: A comprehensive guide to project management, including detailed chapters on resource planning and management.
  • The PMBOK Guide (Project Management Body of Knowledge) by Project Management Institute: A widely recognized standard for project management practices, with a dedicated section on resource management.
  • Resource Management for Project Managers by Judith N. Myerson: A focused guide specifically on resource management, covering various aspects like planning, allocation, and control.
  • Oil and Gas Project Management: A Practical Guide by David R. Smith: Covers the unique challenges of project management in the oil and gas industry, including resource allocation specific to this sector.

Articles

  • "Resource Management in Project Management: A Comprehensive Guide" by Project Management Institute: An in-depth article explaining the importance of resource management and its various stages.
  • "The Critical Role of Resource Planning in Oil and Gas Projects" by Energy Industry Review: Focuses on the specific challenges of resource planning in oil and gas projects, highlighting the importance of skilled personnel and equipment availability.
  • "Best Practices for Resource Loading in Project Management" by Project Management Hub: Provides practical tips on optimizing resource loading for improved project efficiency and cost effectiveness.
  • "Risk Management in Oil and Gas Projects: A Holistic Approach" by Energy Global: Discusses the importance of incorporating resource management into overall risk management strategies in the oil and gas sector.

Online Resources

  • Project Management Institute (PMI): The global authority on project management, offering resources, certifications, and training on resource management. (www.pmi.org)
  • Project Management Hub: A comprehensive resource for project management professionals, with articles, tutorials, and templates related to resource planning and management. (www.projectmanagement.com)
  • Energy Industry Review: A publication focusing on news, analysis, and insights related to the oil and gas industry, including articles on resource management and project execution. (www.energyindustryreview.com)
  • Oil and Gas Journal: A leading source of news and information on the oil and gas industry, including articles on project management and resource optimization. (www.ogj.com)

Search Tips

  • Use specific keywords: Combine terms like "resourcing plan," "oil and gas," "project management," and "resource management" to find relevant results.
  • Use quotation marks: Enclose specific phrases, like "resource loading" or "third-party services," to narrow your search and find articles with precise information.
  • Filter by publication date: Use Google's advanced search options to limit your search to recent articles for the most up-to-date information.
  • Include industry-specific keywords: Include terms like "upstream," "downstream," or "midstream" to find articles relevant to specific areas of the oil and gas industry.

Techniques

Similar Terms
Procurement & Supply Chain ManagementOil & Gas ProcessingGeology & ExplorationProject Planning & SchedulingDrilling & Well CompletionData Management & AnalyticsHuman Resources ManagementSafety Training & AwarenessTraining & Competency DevelopmentCommunication & Reporting
Most Viewed
Categories

Comments


No Comments
POST COMMENT
captcha
Back