Glossary of Technical Terms Used in Handover to Operations: Project Close-Out and Start- Up Costs

Project Close-Out and Start- Up Costs

Project Close-Out and Start-Up Costs: Bridging the Gap Between Completion and Revenue in Oil & Gas

In the complex world of oil and gas projects, the journey from concept to commercial production is far from straightforward. While project implementation focuses on building and installing assets, the transition to revenue generation involves a crucial phase often overlooked: Project Close-Out and Start-Up.

This phase encompasses the activities required to transition a completed project from construction to operational status, paving the way for revenue generation. It involves not only completing final construction work but also ensuring the project is safely and efficiently handed over to the operations team.

Project Close-Out:

  • Project Completion: This includes finishing all construction work, commissioning equipment, and conducting final testing to ensure the project meets design specifications.
  • Documentation and Hand-Over: This involves compiling all project documentation, including technical manuals, operating procedures, and safety protocols, for the operational team.
  • Training: Training the operational team on how to safely and effectively operate the new equipment and facilities is vital.
  • Regulatory Compliance: Ensuring the project meets all relevant environmental, safety, and regulatory requirements is crucial.

Start-Up Costs:

While the focus of Project Close-Out is on transitioning the project from construction to operations, Start-Up Costs encompass the expenses incurred during the initial operational phase, leading to revenue generation. These costs can be broadly classified into:

  • Capital Costs: These include expenses incurred on final commissioning, initial inventory stocking, and any additional equipment or infrastructure required for the operational phase.
  • Operating Costs: These cover expenses related to initial production ramp-up, operational testing, and initial personnel costs.

The Costly Bridge:

Project Close-Out and Start-Up costs are often underestimated or overlooked during the initial planning stages. This can lead to significant cost overruns and delays in reaching profitability.

Estimated Extra Costs:

The estimated extra costs during this phase encompass both capital and operating costs incurred during the period from the completion of project implementation to the beginning of normal revenue earnings on operations. These costs can include:

  • Commissioning and Testing: Commissioning the completed facilities and conducting final performance tests require resources and manpower.
  • Initial Production Ramp-Up: Production often starts at a slower rate than the ultimate capacity, leading to lower revenues in the initial months.
  • Troubleshooting and Optimization: The early operational phase often requires troubleshooting and optimization of equipment and processes.
  • Operational Workforce Training: Training new operational personnel and establishing the operational team takes time and resources.

Strategies for Managing Costs:

  • Early Planning: Identifying and budgeting for potential close-out and start-up costs early in the project lifecycle can prevent financial surprises.
  • Detailed Cost Estimation: Thorough cost estimations should consider all aspects of the transition phase, including both capital and operating expenses.
  • Efficient Project Management: Efficient project management can minimize delays and optimize resource utilization, leading to reduced costs.
  • Lean Operations: Implementing lean operational practices can optimize resource allocation and minimize waste, reducing unnecessary start-up expenses.

Conclusion:

Project Close-Out and Start-Up costs are often hidden in plain sight. Failing to address these costs can significantly impact the project's overall profitability. By recognizing their importance and implementing sound planning and management strategies, oil and gas companies can navigate this critical transition phase smoothly and efficiently, achieving their revenue generation targets.


Test Your Knowledge

Quiz: Project Close-Out and Start-Up Costs in Oil & Gas

Instructions: Choose the best answer for each question.

1. What is the primary purpose of the Project Close-Out phase?

a) To begin generating revenue from the project. b) To transition the project from construction to operational status. c) To identify and address any potential cost overruns. d) To finalize the project budget and secure funding.

Answer

The correct answer is **b) To transition the project from construction to operational status.**

2. Which of the following is NOT a typical activity during Project Close-Out?

a) Commissioning equipment and conducting final testing. b) Developing operational procedures and safety protocols. c) Negotiating contracts with suppliers for operational materials. d) Training the operational team on equipment and procedures.

Answer

The correct answer is **c) Negotiating contracts with suppliers for operational materials.** This is typically done during the procurement phase of the project.

3. Start-Up Costs are associated with:

a) The construction and installation of project assets. b) The initial operational phase of a project. c) The final budget reconciliation for the project. d) The project feasibility study and planning stage.

Answer

The correct answer is **b) The initial operational phase of a project.**

4. Which of the following is a common reason why Project Close-Out and Start-Up costs are often underestimated?

a) Lack of experienced personnel involved in the transition phase. b) Inadequate planning and budget allocation during the project lifecycle. c) Unexpected delays and disruptions during construction. d) The focus on completing the project within the initial budget.

Answer

The correct answer is **b) Inadequate planning and budget allocation during the project lifecycle.**

5. Which of the following strategies can help manage Project Close-Out and Start-Up costs effectively?

a) Delaying the start-up phase to optimize resource allocation. b) Implementing lean operations and minimizing waste. c) Focusing solely on capital costs and ignoring operating expenses. d) Reducing the training and development of the operational team.

Answer

The correct answer is **b) Implementing lean operations and minimizing waste.**

Exercise: Cost Estimation

Scenario: An oil and gas company is about to complete a new offshore platform project. The project budget includes $1 billion for construction and installation. However, the company needs to estimate the potential Project Close-Out and Start-Up costs.

Task: Based on the information provided in the article, identify and categorize the potential Project Close-Out and Start-Up costs that the company should consider. Estimate a reasonable percentage of the initial project budget that should be allocated to cover these costs.

Exercice Correction

Here's a potential breakdown of Project Close-Out and Start-Up costs:

Project Close-Out Costs:

  • Commissioning and Testing: 5-10% of the initial project budget (e.g., $50-$100 million)
  • Documentation and Hand-Over: 1-2% of the initial project budget (e.g., $10-$20 million)
  • Training: 2-3% of the initial project budget (e.g., $20-$30 million)
  • Regulatory Compliance: 1-2% of the initial project budget (e.g., $10-$20 million)

Start-Up Costs:

  • Capital Costs: 5-10% of the initial project budget (e.g., $50-$100 million) - This includes initial inventory, spare parts, and any additional equipment.
  • Operating Costs: 3-5% of the initial project budget (e.g., $30-$50 million) - This includes initial production ramp-up, operational testing, and personnel costs.

Total Estimated Costs: 17-30% of the initial project budget (e.g., $170-$300 million)

Important Notes:

  • These percentages are estimations and can vary depending on the specific project complexity, location, and regulatory requirements.
  • The company should conduct a detailed cost analysis and consider all potential risks and uncertainties.
  • Early planning and budgeting for these costs can prevent significant financial surprises and delays.


Books

  • Project Management Institute (PMI). (2021). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Seventh Edition. PMI Publishing.
    • This comprehensive guide covers project management principles, including project closure and handover processes.
  • Meredith, J. R., & Mantel, S. J. (2018). Project Management: A Managerial Approach (10th ed.). John Wiley & Sons.
    • This textbook provides a detailed overview of project management, including cost management, start-up considerations, and post-project review.
  • Kerzner, H. (2017). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (12th ed.). John Wiley & Sons.
    • This classic textbook covers various aspects of project management, including project closure and transition to operations.
  • Cleland, D. I., & Ireland, L. R. (2016). Project Management: Strategic Design and Implementation (6th ed.). McGraw-Hill Education.
    • This book provides insights into project management strategies, including project closure and handover processes.

Articles

  • "The Importance of Project Close-Out in Oil and Gas Projects" by John Smith (Fictional) in Oil & Gas Journal, [Year]
    • This (fictional) article provides a specific example of project close-out practices within the oil and gas industry.
  • "Project Start-Up Costs: A Critical Look" by Jane Doe (Fictional) in Energy Engineering, [Year]
    • This (fictional) article focuses on the analysis and management of start-up costs in the context of oil and gas projects.
  • "Transitioning from Construction to Operations: A Guide for Oil & Gas Projects" by XYZ Consulting, [Year]
    • This (fictional) article from a consulting firm could offer valuable insights and practical strategies for project handover.
  • "Managing Cost Overruns in Oil & Gas Projects: A Case Study" by The Institute for International Energy Studies, [Year]
    • This (fictional) case study from a reputable research institute could provide examples of cost overruns during project close-out and start-up phases.

Online Resources

  • Project Management Institute (PMI): https://www.pmi.org/
    • This website provides a wealth of resources, including standards, research, and training materials related to project management, including project closure.
  • American Petroleum Institute (API): https://www.api.org/
    • This industry association provides standards and guidance related to oil and gas operations, including safety and environmental regulations.
  • Society of Petroleum Engineers (SPE): https://www.spe.org/
    • This professional organization offers resources, publications, and conferences related to various aspects of the oil and gas industry.
  • Oil & Gas Journal: https://www.ogj.com/
    • This trade publication provides industry news, technical articles, and market analysis related to oil and gas.

Search Tips

  • Use specific keywords: Combine keywords like "project close-out," "start-up costs," "oil & gas," "energy projects," "cost management," "transition to operations," and "project handover."
  • Include relevant industry terms: Use industry-specific terms like "commissioning," "production ramp-up," "operational testing," and "regulatory compliance."
  • Refine your search by date: Add a date range to your search to find more recent articles and resources.
  • Search for specific author names: If you know a particular author who has written on this topic, include their name in your search.
  • Explore different file types: Use Google's advanced search options to filter your results by file type (e.g., PDF, DOC, PPT).
Similar Terms
Drilling & Well Completion
Human Resources Management
Cost Estimation & Control
Budgeting & Financial Control
Communication & Reporting
Oil & Gas Specific Terms
Pipeline Construction
Safety Training & Awareness
Oil & Gas Processing
Lifting & Rigging
Instrumentation & Control Engineering
Most Viewed

Comments


No Comments
POST COMMENT
captcha
Back