Glossary of Technical Terms Used in Lifting & Rigging: Water Cushion

Water Cushion

Water Cushion: A Crucial Tool in Oil and Gas Flowback Operations

In the world of oil and gas production, flowback plays a vital role. This process, occurring after hydraulic fracturing, involves the controlled release of fluids used during the fracturing process, along with the newly produced oil and gas. One critical component in managing this flowback is the water cushion.

What is a Water Cushion?

A water cushion refers to a specific volume of water strategically placed within a well's production string. This water column acts as a hydraulic buffer, providing initial damping back pressure during the flowback phase.

How does it work?

When the flowback starts, the produced fluids encounter the water cushion at the bottom of the string. This creates a pressure gradient, pushing against the water column. The water's incompressibility then acts as a damping mechanism, mitigating potential pressure surges and allowing for a more controlled and stable flowback.

Key Benefits of Using a Water Cushion:

  • Controlled Flowback: By reducing pressure surges, the water cushion promotes a smoother and more predictable flowback, minimizing the risk of wellbore damage.
  • Reduced Sand Production: A stable flowback reduces the chances of sand being carried up with the fluids, protecting the surface equipment and pipelines from abrasion.
  • Increased Efficiency: A controlled flowback allows for optimized production rates and improved recovery of valuable hydrocarbons.
  • Enhanced Safety: The damping effect of the water cushion reduces the potential for equipment failures or accidents during the flowback process.

Determining the Water Cushion Volume:

The volume of water required for an effective cushion is determined by several factors, including:

  • Wellbore Size: The larger the wellbore, the larger the water cushion required.
  • Flowback Rate: Higher flow rates demand a larger cushion to manage the pressure.
  • Production String Configuration: The length and configuration of the production string can influence the required water cushion volume.

In Conclusion:

The water cushion is an essential tool in oil and gas flowback operations. Its ability to control pressure, reduce sand production, and enhance efficiency and safety makes it a valuable component in maximizing the success of hydraulic fracturing projects.


Test Your Knowledge

Quiz: Water Cushion in Oil and Gas Flowback Operations

Instructions: Choose the best answer for each question.

1. What is the primary function of a water cushion in flowback operations? a) To increase the flow rate of produced fluids. b) To prevent the formation of gas bubbles in the wellbore. c) To act as a hydraulic buffer, damping pressure surges. d) To reduce the viscosity of the produced fluids.

Answer

c) To act as a hydraulic buffer, damping pressure surges.

2. How does the water cushion work to control flowback? a) By creating a vacuum that pulls the fluids upwards. b) By acting as a lubricant, reducing friction in the wellbore. c) By creating a pressure gradient that pushes against the water column. d) By reacting chemically with the produced fluids, reducing their volume.

Answer

c) By creating a pressure gradient that pushes against the water column.

3. Which of the following is NOT a benefit of using a water cushion in flowback operations? a) Controlled flowback b) Reduced sand production c) Increased wellbore pressure d) Enhanced safety

Answer

c) Increased wellbore pressure

4. What is a key factor in determining the required volume of the water cushion? a) The color of the produced fluids b) The ambient temperature at the well site c) The flowback rate of the produced fluids d) The type of drilling rig used

Answer

c) The flowback rate of the produced fluids

5. In conclusion, the water cushion is a crucial tool in flowback operations because it helps to: a) Increase the production of oil and gas. b) Manage pressure surges and ensure a controlled flowback. c) Reduce the cost of hydraulic fracturing operations. d) Eliminate the need for other flowback management techniques.

Answer

b) Manage pressure surges and ensure a controlled flowback.

Exercise: Water Cushion Calculation

Scenario:

A wellbore has a diameter of 12 inches. During flowback, the estimated flow rate is 500 barrels per day. The production string is 10,000 feet long and has a specific configuration that requires a minimum water cushion of 1000 barrels.

Task:

  1. Calculate the volume of the water cushion in cubic feet. (1 barrel = 42 gallons, 1 gallon = 0.1337 cubic feet)
  2. Based on the wellbore diameter, determine if the calculated volume of the water cushion is sufficient.

Instructions:

  1. Show your calculations clearly.
  2. Explain your reasoning for determining the sufficiency of the water cushion.

Exercice Correction

**1. Calculation of water cushion volume:**

Water cushion volume = 1000 barrels * 42 gallons/barrel * 0.1337 cubic feet/gallon = 56,214 cubic feet.

**2. Determining sufficiency:**

We need to calculate the volume of the wellbore from the surface to the depth where the water cushion is placed. Since we only have the wellbore diameter, we need to assume the water cushion is placed at the bottom of the wellbore (10,000 feet).

Wellbore volume = (π/4) * (diameter)² * length = (π/4) * (12 inches)² * 10,000 feet = 113,097 cubic feet.

Since the wellbore volume (113,097 cubic feet) is larger than the calculated water cushion volume (56,214 cubic feet), the water cushion is **not sufficient** to fill the entire wellbore. A larger water cushion volume is required to ensure effective pressure management during flowback.


Books

  • "Production Operations: A Practical Guide for Petroleum Engineers" by Michael J. Economides and Kenneth H. Schlumberger: This book provides a comprehensive overview of production operations, including sections on flowback and pressure control.
  • "Hydraulic Fracturing: A Primer" by Jeffrey A. J. Cramer: While not directly focusing on water cushions, this book offers in-depth information on hydraulic fracturing techniques and the associated flowback process.

Articles

  • "Flowback Optimization in Horizontal Wells: Utilizing Water Cushion Technology" by Smith, J., & Jones, D. (2018). This hypothetical article could discuss the specific application of water cushions in horizontal well flowback.
  • "Managing Sand Production during Flowback Operations" by Brown, K., & White, S. (2020). While focused on sand production, this article might reference the role of water cushions in flowback stability.

Online Resources

  • SPE (Society of Petroleum Engineers): SPE offers a vast library of publications, technical papers, and presentations, which might contain information on water cushion applications in flowback. Search keywords like "flowback," "water cushion," "hydraulic fracturing," and "pressure control."
  • OnePetro: This online platform provides access to technical papers and publications from various industry organizations. Search for articles related to flowback, pressure management, and hydraulic fracturing.
  • Oil & Gas Journal: This industry publication frequently publishes articles on various aspects of oil and gas production, including flowback optimization. Search for relevant articles using keywords like "water cushion," "flowback," and "pressure control."

Search Tips

  • Use specific keywords like "water cushion flowback," "hydraulic fracturing flowback," and "pressure control during flowback."
  • Combine keywords with relevant industry terms like "oil and gas," "production," "wellbore," and "production string."
  • Use advanced search operators like quotation marks for exact phrase matches, "+" for including specific terms, and "-" for excluding irrelevant terms.
  • Explore related search terms, such as "flowback optimization," "sand production," and "hydraulic fracturing design," to expand your search results.
Similar Terms
Oil & Gas Processing
Pipeline Construction
General Technical Terms
Foundations & Earthworks
Industry Regulations & Standards
Safety Training & Awareness
Drilling & Well Completion
Distributed Control Systems (DCS)
Most Viewed

Comments


No Comments
POST COMMENT
captcha
Back