In the world of oil and gas drilling, "set back" refers to a crucial operation that involves pulling tubing and carefully storing it on the rig's vertical racks. While seemingly straightforward, this maneuver demands meticulous planning and execution, impacting well completion and overall efficiency.
Understanding the Set Back Process:
Pulling Tubing: The process begins with the controlled extraction of tubing strings from the wellbore. This involves detaching the tubing from the downhole equipment, using specialized tools and techniques to safely raise the tubing string to the surface.
Stand Back: Once the tubing is on the rig floor, it is carefully inspected for any damage or wear. It's then carefully laid out in designated "stand back" areas. These are typically vertical racks on the rig, designed to securely store the tubing in a well-organized fashion.
Why Set Back Matters:
Safety: The meticulous handling and storage of tubing strings during set back is paramount for ensuring the safety of rig personnel and equipment.
Efficiency: A well-organized set back operation streamlines further operations like running new tubing strings or conducting downhole work.
Cost Reduction: Minimizing downtime during set back, preventing damage to tubing, and avoiding potential delays during subsequent operations contributes to cost-effectiveness.
Types of Set Backs:
Single String Set Back: Involves pulling and storing a single tubing string, typically used for smaller operations.
Multiple String Set Back: Handles multiple strings simultaneously, often employed for complex well completions involving multiple layers of tubing.
Challenges and Considerations:
Tubing Weight: The weight of tubing strings can pose a significant challenge during the pull-up and storage process, requiring proper lifting equipment and experienced personnel.
Space Constraints: Limited space on the rig floor necessitates careful planning and efficient organization of the tubing during set back.
Environmental Conditions: Weather conditions, particularly wind and rain, can affect the safety and efficiency of set back operations.
Conclusion:
Set back is an integral part of drilling and well completion, requiring precision and careful planning. It ensures safe handling of tubing, streamlines subsequent operations, and contributes to the overall efficiency of the well development process. By understanding the complexities and challenges of this critical operation, operators can minimize risks, optimize performance, and maximize the success of their projects.
Instructions: Choose the best answer for each question.
1. What is the primary purpose of the "set back" operation in drilling and well completion?
a) To connect tubing strings to the downhole equipment. b) To inspect and store tubing strings after they've been pulled from the wellbore. c) To run new tubing strings into the wellbore. d) To perform hydraulic fracturing operations.
b) To inspect and store tubing strings after they've been pulled from the wellbore.
2. Which of the following is NOT a benefit of a well-organized set back operation?
a) Improved safety for rig personnel and equipment. b) Increased efficiency of subsequent operations. c) Reduced cost due to minimized downtime. d) Increased production rates of the well.
d) Increased production rates of the well.
3. What is the key difference between a single string set back and a multiple string set back?
a) Single string set back is used for complex well completions. b) Multiple string set back is used for smaller operations. c) Single string set back involves pulling and storing only one tubing string. d) Multiple string set back involves pulling and storing tubing strings of different sizes.
c) Single string set back involves pulling and storing only one tubing string.
4. Which of the following is a significant challenge that can be encountered during the set back process?
a) The weight of the tubing strings. b) The size of the wellbore. c) The type of drilling fluid used. d) The distance between the rig and the wellhead.
a) The weight of the tubing strings.
5. What role do environmental conditions play in a set back operation?
a) Environmental conditions have no impact on the set back process. b) Environmental conditions can affect the safety and efficiency of the operation. c) Environmental conditions are only a concern for multiple string set backs. d) Environmental conditions only affect the type of tubing used.
b) Environmental conditions can affect the safety and efficiency of the operation.
Scenario: You are the drilling engineer responsible for planning a set back operation for a well that has just finished drilling. The well has two tubing strings (string A and string B) that need to be pulled and stored.
Task: Develop a simple plan for the set back operation, considering the following:
Include in your plan:
**Set Back Operation Plan:** **Steps:** 1. **Pre-set back preparation:** Ensure the rig floor is clear, and the tubing racks are ready for storage. 2. **Pull up tubing strings:** Begin with string B, as it is lighter. Carefully pull it up using the drilling rig's hoist, ensuring a controlled and slow ascent. Inspect the string for any damage or wear. 3. **Store string B:** Carefully lay the string B on the designated rack, ensuring it is properly secured and does not obstruct any walkways or equipment. 4. **Pull up string A:** Repeat the pull-up and inspection process for string A, ensuring the weight is handled safely and efficiently. 5. **Store string A:** Store string A on the tubing rack, being mindful of the space constraints and potential for the combined weight of both strings. 6. **Post-set back inspection:** Ensure all equipment used is in good working order and that the stored tubing is properly secured. **Equipment:** * Drilling rig's hoist with adequate lifting capacity for both strings. * Tubing racks with sufficient capacity to store both strings. * Safety harnesses and lines for personnel working around the tubing. **Safety Considerations:** * Ensure all personnel involved in the operation are properly trained and wear the necessary safety gear. * Use proper lifting techniques and ensure the hoist has the necessary load capacity. * Implement safe work practices, such as maintaining clear walkways and providing adequate lighting. * Have a dedicated safety observer monitoring the operation. **Contingency Plan:** * If the wind picks up and poses a safety hazard, stop the set back operation immediately. * Secure the partially pulled tubing string back down the wellbore, preventing it from swaying and potentially causing damage. * Wait for the wind to subside to a safe level before resuming operations. * Consider using additional wind barriers or reducing the size of the tubing being handled at a time. **Note:** This plan is a basic framework. You would need to adjust it based on the specific details of the well, rig, and weather conditions.