Drilling & Well Completion

reeve (the line)

The Reeve (The Line): The Backbone of Drilling Operations

In the world of drilling and well completion, the "reeve" (pronounced "reev") refers to the specific arrangement of the wire rope drilling line as it passes through the sheaves of the traveling block, crown block, and ultimately, the hoisting drum. This seemingly simple concept is crucial to the safe and efficient operation of a drilling rig, dictating the direction of force and the load distribution throughout the system.

Understanding the "Reeve":

The reeve refers to the path the wire rope takes, guiding it through the various sheaves and ensuring it runs smoothly and efficiently. It's more than just a random string of wire – the reeve determines the following:

  • Direction of force: The reeve dictates whether the force exerted on the wire rope is pulling upwards, downwards, or sideways. This is vital for tasks like raising and lowering the drill string, deploying tools, and controlling well pressure.
  • Load distribution: The reeve ensures the load is distributed evenly across the multiple sheaves, preventing excessive stress on any single point. This safeguards the wire rope, sheaves, and the entire hoisting system from potential damage.
  • Safety: The reeve is paramount for the safe operation of the drilling rig. A properly reeveed system minimizes the risk of wire rope snags, slippage, and other potentially catastrophic events.

Stringing the Line:

Stringing the wire rope drilling line, known as "reeving the line", is a critical step in preparing a drilling rig for operation. This process involves the following steps:

  1. Starting point: The wire rope is usually fed from a storage drum or spool onto the hoisting drum.
  2. Traveling block: The wire rope is then threaded through the sheaves of the traveling block, which is attached to the drill string. This block is hoisted up and down the derrick, allowing for efficient movement of the drill string.
  3. Crown block: The wire rope then passes through the sheaves of the crown block, positioned at the top of the derrick. This block acts as a stationary support point, guiding the line to the hoisting drum.
  4. Hoisting drum: Finally, the wire rope is wound onto the hoisting drum, powered by the drilling rig's engine. The drum's rotation controls the speed and direction of the wire rope, dictating the movement of the drill string.

Different Reevings for Different Jobs:

The specific reeve used for a drilling operation can vary depending on the type of drilling rig, the depth of the well, and the specific task being performed. Common reeving configurations include:

  • Single-line reeve: This is the simplest reeve, with the wire rope passing through the sheaves of the traveling block and crown block only once.
  • Double-line reeve: In this configuration, the wire rope passes through the sheaves twice, doubling the pulling force and increasing the lifting capacity.
  • Three-line reeve: This reeve is used in high-capacity rigs, further increasing the pulling force by passing the wire rope through the sheaves three times.

Conclusion:

The reeve, seemingly a simple concept, is a critical component of drilling operations. Understanding the reeve and its importance in load distribution, force direction, and safety ensures efficient and successful drilling activities. Properly stringing the wire rope drilling line is a crucial step in ensuring the safety and productivity of the entire drilling process.


Test Your Knowledge

Quiz: The Reeve - Backbone of Drilling Operations

Instructions: Choose the best answer for each question.

1. What does the term "reeve" refer to in drilling operations?

a) The type of wire rope used. b) The specific arrangement of the wire rope through the sheaves. c) The weight of the drill string. d) The speed of the hoisting drum.

Answer

b) The specific arrangement of the wire rope through the sheaves.

2. What is one of the primary functions of the reeve in drilling operations?

a) Controlling the speed of the drill bit. b) Distributing the load evenly across the sheaves. c) Monitoring the pressure in the well. d) Drilling the wellbore.

Answer

b) Distributing the load evenly across the sheaves.

3. Which of the following is NOT a step involved in stringing the wire rope drilling line (reeving the line)?

a) Starting from the hoisting drum. b) Threading the wire rope through the sheaves of the traveling block. c) Attaching the wire rope directly to the drill bit. d) Passing the wire rope through the sheaves of the crown block.

Answer

c) Attaching the wire rope directly to the drill bit.

4. What is the main difference between a single-line reeve and a double-line reeve?

a) The number of times the wire rope passes through the sheaves. b) The type of wire rope used. c) The size of the hoisting drum. d) The speed of the drilling operation.

Answer

a) The number of times the wire rope passes through the sheaves.

5. Why is the reeve considered crucial for safe drilling operations?

a) It helps to prevent the drill string from becoming stuck in the wellbore. b) It ensures the load is distributed evenly, reducing the risk of equipment failure. c) It helps to maintain the correct drilling fluid pressure. d) It allows for faster drilling speeds.

Answer

b) It ensures the load is distributed evenly, reducing the risk of equipment failure.

Exercise: Re-reeving the Line

Scenario: During a drilling operation, the wire rope on a single-line reeve drilling rig has become damaged and needs to be replaced. The new wire rope is on a spool, ready to be reeveed.

Task: Describe the step-by-step process of re-reeving the new wire rope onto the drilling rig, starting from the spool and ending with the wire rope wound on the hoisting drum. You should include the path of the wire rope through the sheaves of the traveling block, crown block, and hoisting drum, ensuring it follows a single-line reeve configuration.

Exercice Correction

  1. **Starting from the spool:** Unwind the wire rope from the spool, feeding it onto the hoisting drum.
  2. **Traveling Block:** Guide the wire rope through the first sheave of the traveling block, positioned on the drill string. It then exits the traveling block through the opposite sheave, ensuring the line exits the block in the opposite direction to how it entered.
  3. **Crown Block:** The wire rope then passes through the first sheave of the crown block, located at the top of the derrick. It then exits the crown block through the opposite sheave, exiting the block in the opposite direction to how it entered.
  4. **Hoisting Drum:** The wire rope now continues to wind onto the hoisting drum, with the drum's rotation pulling the wire rope and moving the drill string.


Books

  • Drilling Engineering: This is a broad topic, so you'll need to find a specific drilling engineering book that covers wire rope and hoisting systems in detail. Look for books that mention "drilling rig equipment," "hoisting systems," or "wire rope technology."
  • Petroleum Engineering Handbook: Chapters related to drilling operations or well completion will likely contain information about wire rope and reeving.

Articles

  • Journals of the Society of Petroleum Engineers (SPE): Look for articles focusing on drilling rigs, hoisting systems, or wire rope technology.
  • Industry Publications: Trade journals like Oil & Gas Journal, World Oil, Petroleum Engineering International often have articles related to drilling equipment and operations.
  • Online Resources: Websites of companies specializing in drilling equipment, wire rope manufacturers, and drilling engineering services often have technical information about reeving and hoisting systems.

Online Resources

  • API Standards: The American Petroleum Institute (API) has standards related to drilling equipment and wire rope.
  • Drilling Equipment Manufacturer Websites: Companies like National Oilwell Varco (NOV), Baker Hughes, and Schlumberger have websites with technical information about their drilling equipment and systems.

Search Tips

  • Use specific keywords: "drilling line reeve," "wire rope reeve," "drilling rig hoisting systems," "traveling block reeve," "crown block reeve," "drilling rig safety," "hoisting drum reeve."
  • Use quotation marks: Enclose phrases in quotation marks to search for the exact phrase, e.g., "reeve the line."
  • Combine keywords with "site:" To restrict your search to a specific website, use "site:" followed by the website address, e.g., "reeve the line site:nov.com."

Techniques

Chapter 1: Techniques for Reevving the Line

This chapter delves into the practical techniques used to reeve the drilling line, emphasizing safety and efficiency.

1.1 Understanding the Components:

Before reevving, it's crucial to be familiar with the key components involved:

  • Wire Rope: The core of the drilling line, responsible for transmitting force and lifting the drill string.
  • Sheaves: Grooved wheels that guide the wire rope, minimizing friction and wear.
  • Traveling Block: A movable assembly of sheaves, attached to the drill string, facilitating vertical movement.
  • Crown Block: A stationary assembly of sheaves, positioned at the top of the derrick, anchoring the drilling line.
  • Hoisting Drum: The rotating drum that winds and unwinds the drilling line, providing the power for lifting and lowering.

1.2 The Steps of Reevving:

The following steps outline the process of reevving the drilling line:

  1. Preparing the Line:

    • Ensure the wire rope is properly inspected for wear and damage.
    • Lubricate the wire rope and sheaves to minimize friction.
    • Remove any obstacles that might interfere with the line's path.
  2. Starting from the Hoisting Drum:

    • Feed the wire rope from its storage drum or spool onto the hoisting drum.
    • Ensure the line is evenly wound and secured.
  3. Traveling Block:

    • Guide the wire rope through the sheaves of the traveling block.
    • The number of passes through the block (single, double, or triple) depends on the reeve configuration.
    • Always ensure the line is correctly routed through the sheaves, avoiding any twists or kinks.
  4. Crown Block:

    • Continue guiding the wire rope through the sheaves of the crown block.
    • The number of passes through the block matches the configuration of the traveling block.
    • Ensure the line is securely routed and secured.
  5. Returning to the Hoisting Drum:

    • Direct the wire rope back to the hoisting drum.
    • Ensure the line is smoothly wound onto the drum, avoiding any overlaps or uneven winding.
  6. Final Inspection:

    • Inspect the entire reevving process to ensure the line is correctly routed and secured.
    • Check for any potential snags, kinks, or wear on the wire rope or sheaves.

1.3 Safety Considerations:

  • Never attempt reevving under load. Always ensure the load is fully lowered before any adjustments are made.
  • Always use proper safety equipment. This includes gloves, eye protection, and safety harnesses when working at height.
  • Communicate clearly with crew members. Ensure everyone is aware of the reevving process and potential hazards.
  • Regularly inspect the line and equipment. Identify potential wear or damage before it becomes a hazard.

1.4 Reevving Variations:

  • Single-line reeve: The simplest configuration, with the wire rope passing through each block once.
  • Double-line reeve: The line passes through each block twice, doubling the pulling force.
  • Three-line reeve: The line passes through each block three times, further increasing lifting capacity.

Conclusion:

Mastering the art of reevving the drilling line is essential for any drilling operation. By following these techniques and prioritizing safety, crews can ensure efficient and reliable drilling operations.