What is Cased and Perforated used in Drilling & Well Completion?
Asked 3 mois, 2 semaines ago | Viewed 57times
0

How do the characteristics of cased and perforated sections in a wellbore impact the flow dynamics of produced fluids, considering factors like:

  • Wellbore diameter: How does the change in diameter between the open hole section and the cased and perforated section affect fluid velocity and pressure gradient?
  • Perforation density and size: How does the number and diameter of perforations influence the flow rate, pressure drop, and potential for formation damage?
  • Production fluid properties: How do the viscosity, density, and compressibility of the produced fluids affect the flow behavior through the perforated interval?
  • Formation characteristics: How do the permeability, porosity, and pressure gradient of the reservoir formation influence the fluid flow into the wellbore through the perforated section?
  • Wellbore pressure: How does the bottomhole pressure in the wellbore impact the flow rates and overall production from the perforated interval?

Additionally, how does the combination of these factors affect the overall efficiency and longevity of a well?

comment question
1 Answer(s)
0

Cased and Perforated in Drilling & Well Completion:

Cased and perforated is a crucial technique used in drilling and well completion to isolate different zones, control fluid flow, and enhance production from oil and gas wells.

1. Casing:

  • Steel pipe inserted into the wellbore after drilling, lining the hole and providing structural support.
  • Different sizes and grades of casing are used depending on the depth, pressure, and formation conditions.
  • Functions:
    • Prevent formation collapse: Casing stabilizes the wellbore, preventing caving in.
    • Isolate different zones: Multiple strings of casing are often used to separate formations with different pressures and fluids.
    • Provide a conduit for production: The production tubing is run inside the casing, allowing for efficient flow.
    • Protect freshwater aquifers: Casing helps prevent contamination of freshwater aquifers by isolating them from the wellbore.

2. Perforation:

  • Process of creating holes in the casing and cement sheath using specialized tools.
  • Allows communication between the wellbore and the reservoir.
  • Types of perforations:
    • Gun perforating: Uses explosives to create holes.
    • Jet perforating: Uses high-pressure jets to create holes.
    • Mechanical perforating: Uses a mechanical tool to cut holes.

3. Cased and Perforated Completion:

  • Combined technique where the well is cased and then perforated to maximize production.
  • Allows targeted production: Perforations are strategically placed to access specific zones with high hydrocarbon content.
  • Improved control: Perforation allows for selective production, minimizing water and gas production.
  • Enhanced recovery: By controlling fluid flow and accessing the reservoir effectively, cased and perforated completions optimize recovery.

In summary:

Cased and perforated techniques are essential for safe and efficient well completion. They provide stability, control, and optimized production, maximizing the recovery of hydrocarbons from oil and gas wells.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
What is the scientific classification of an atom?
How to use Monte Carlo similation using python to similate Project Risks?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back