What is Medium Term used in Oil & Gas Specific Terms?
Asked 3 months, 3 weeks ago | Viewed 55times
0

What are the specific contexts and nuances in the Oil & Gas industry where the term "Medium Term" is used, and how do these differ from its usage in other industries?

This question specifically asks for:

  • Specific contexts: What are the common situations in Oil & Gas where "Medium Term" is used? (e.g., planning, budgeting, forecasting, etc.)
  • Nuances: How does the meaning of "Medium Term" in Oil & Gas differ from its broader definition? Are there specific timeframes associated with the term in this industry?
  • Comparison with other industries: How does the usage of "Medium Term" in Oil & Gas compare with its usage in other industries? Are there any industry-specific factors that influence its meaning and application in Oil & Gas?

By exploring these nuances, the question aims to gain a deeper understanding of the specific meaning and application of the term "Medium Term" in the complex and unique context of the Oil & Gas industry.

comment question
1 Answer(s)
0

In Oil & Gas, "Medium Term" doesn't have a single, universally accepted definition. Its meaning can vary depending on the context and the specific situation. Here are some common interpretations:

1. Timeframe:

  • Typically refers to a period between 1 to 5 years. This timeframe is considered medium-term in comparison to short-term (less than a year) and long-term (more than 5 years).

2. Planning and Forecasting:

  • Medium-term plans often focus on developing and executing operational plans. This may involve things like:
    • Capital expenditure budgeting: Allocating funds for new projects or equipment.
    • Production optimization: Aiming to maximize output from existing wells or facilities.
    • Reserve management: Forecasting future production and updating reserves estimates.
    • Risk assessment: Identifying potential challenges and developing mitigation strategies.

3. Contractual Agreements:

  • Some contracts in the Oil & Gas industry might have clauses specifically related to medium-term. For example:
    • Medium-term supply agreements: These involve the purchase of oil or gas for a period of several years.
    • Medium-term lease agreements: Securing access to land or infrastructure for exploration or production activities.

Examples:

  • "The company is developing a medium-term plan for increasing production from its existing oil fields."
  • "The new well is expected to contribute significantly to the company's medium-term production targets."
  • "The consortium signed a medium-term gas supply agreement with a local utility company."

In summary, "medium-term" in Oil & Gas typically refers to a timeframe between 1 and 5 years, and it is often used in the context of planning, forecasting, and contractual agreements. To fully understand its meaning in a specific instance, it's crucial to consider the context and the broader discussion.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
What is the scientific classification of an atom?
How to use Monte Carlo similation using python to similate Project Risks?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back