What is PDP used in Oil & Gas Specific Terms?
Asked 3 months, 1 week ago | Viewed 164times
0

What are the specific challenges and best practices in developing a Production Development Plan (PDP) for a complex offshore oil and gas field with significant environmental constraints, multiple reservoir layers, and a high degree of uncertainty regarding reserves and production rates?

This question delves into the intricacies of developing a PDP in a challenging context:

  • Complex offshore field: This introduces challenges related to infrastructure development, transportation, and environmental impact assessment.
  • Multiple reservoir layers: This requires careful characterization and planning for production optimization across different reservoir types.
  • High degree of uncertainty: This necessitates robust risk assessment, contingency planning, and adaptation strategies for a successful project.
  • Environmental constraints: These require careful consideration of potential impacts, mitigation measures, and compliance with regulatory frameworks.

The question encourages a detailed answer that covers:

  • Specific challenges encountered in each area, e.g., complex well design, environmental impact assessment, and economic viability analysis.
  • Best practices for mitigating these challenges, e.g., utilizing advanced reservoir simulation, employing adaptive development strategies, and involving stakeholders for environmental impact mitigation.
  • Potential solutions for overcoming uncertainties, e.g., applying probabilistic methods for reserve estimations, implementing flexible production schemes, and incorporating adaptive management strategies.

By addressing these aspects, the answer will provide a comprehensive understanding of the complexities involved in developing a PDP for a challenging oil and gas project.

comment question
1 Answer(s)
0

In Oil & Gas specific terms, PDP stands for Proven Developed Producing. It refers to reserves that are:

  • Proven: This means the reserves have been evaluated and there is a high degree of certainty that they exist.
  • Developed: The necessary infrastructure (wells, pipelines, processing facilities) is in place to extract the oil or gas.
  • Producing: Oil or gas is currently being extracted from the reserves.

In essence, PDP reserves are those that are already being commercially produced. This makes them highly valuable and reliable for investors and companies.

Here's how it differs from other reserve classifications:

  • P1 (Proven): Includes reserves that are proven but not yet developed or producing.
  • P2 (Probable): Reserves that are likely to exist but require further evaluation.
  • P3 (Possible): Reserves with a lower degree of certainty, requiring significant exploration and development.

Why PDP is important:

  • Investment decisions: PDP reserves provide a strong basis for investment decisions as they represent a guaranteed stream of revenue.
  • Financial reporting: Companies report their PDP reserves to investors and analysts, providing a clear picture of their current production capabilities.
  • Production planning: PDP reserves are essential for long-term production planning and scheduling.

Example:

A company has identified an oil field with a total estimated reserve of 100 million barrels. After developing and drilling wells, they start producing 5 million barrels per year. These 5 million barrels would be classified as PDP reserves.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
How to use Monte Carlo similation using python to similate Project Risks?
What is the scientific classification of an atom?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back