What is OWC used in Reservoir Engineering?
Asked 3 months ago | Viewed 53times
0

How does the concept of "Original Water Contact" (OWC) in Reservoir Engineering evolve from static to dynamic conditions, and how do these changes impact fluid flow and production strategies?

This question delves into the following aspects:

  • Static vs. Dynamic OWC:
    • Defining the OWC in a static scenario, considering the initial pressure and fluid distribution in the reservoir.
    • Understanding how the OWC shifts dynamically under production, considering pressure depletion, water influx, and other factors.
  • Impact on Fluid Flow:
    • How does the change in OWC affect the flow of oil, gas, and water in the reservoir?
    • How does the dynamic OWC influence the water cut, oil production rate, and ultimate recovery?
  • Production Strategies:
    • What are the implications of a changing OWC for production planning and well management?
    • How do production engineers account for dynamic OWC behavior when optimizing production strategies?
    • What are the potential challenges and opportunities presented by a dynamically changing OWC?

This multi-faceted question requires a deep understanding of reservoir characterization, fluid flow behavior, and production optimization techniques. It encourages discussion about the complex interplay between reservoir geology, production practices, and the dynamic evolution of the OWC.

comment question
1 Answer(s)
0

OWC stands for Oil Water Contact.

In reservoir engineering, the OWC is a critical geological feature that marks the boundary between the oil zone and the water zone within a reservoir. It is the lowest point where oil can be found within the reservoir.

Here's how OWC is used in reservoir engineering:

  • Reservoir Characterization: Identifying the OWC helps determine the size and shape of the oil reservoir. It plays a crucial role in estimating the original oil in place (OOIP), which is essential for economic evaluation.
  • Production Optimization: The OWC defines the vertical extent of the oil zone, guiding the placement of production wells and maximizing oil recovery.
  • Waterflood Planning: Waterflooding is a common technique to enhance oil recovery, and understanding the OWC is vital for planning and monitoring the waterflood.
  • Reservoir Simulation: The OWC is a crucial input parameter for reservoir simulation models, which are used to predict reservoir performance and optimize production strategies.
  • Reservoir Management: By monitoring the movement of the OWC over time, engineers can assess the effectiveness of production strategies and identify areas where additional interventions might be required.

In summary, the OWC is a vital piece of information in reservoir engineering. It helps characterize the reservoir, optimize production, plan waterflooding, and monitor the performance of the reservoir over time.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
How to use Monte Carlo similation using python to similate Project Risks?
What is the scientific classification of an atom?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back