What is make a connection used in Drilling & Well Completion?
Asked 3 months, 2 weeks ago | Viewed 67times
0

Explain the various ways the term "make a connection" is used in the context of Drilling and Well Completion, focusing on the differences in meaning and specific scenarios where each meaning is applied.

Specifically, address the following:

  • Connection types: Identify and define the different types of connections (e.g., drill pipe to drill collar, casing to casing, wellhead to surface equipment) encountered in drilling and completion operations.
  • Connection procedures: Describe the common procedures involved in making each connection type, including any specific tools or techniques used.
  • Safety considerations: Highlight the potential hazards associated with making connections and the safety precautions taken to mitigate these risks.
  • Connection integrity: Explain how connection integrity is assessed and maintained throughout the drilling and completion process.
  • Impact on well performance: Discuss how connection quality can affect well performance, including potential issues like leaks, stress concentration, and premature failure.

This question encourages a comprehensive understanding of the term "make a connection" as used in the drilling and completion industry, acknowledging its diverse applications and implications.

comment question
1 Answer(s)
0

The term "make a connection" in drilling and well completion has two main meanings:

1. Connecting Tubing or Casing Strings:

  • This refers to physically joining two sections of tubing or casing together. The process involves:
    • Alignment: Ensuring the ends of the two sections are perfectly aligned.
    • Connection: Using specialized threads and couplings to secure the two sections together.
    • Torqueing: Tightening the connection to a specific torque value for a secure seal.

2. Making a Connection with the Wellbore:

  • This refers to successfully establishing a connection between the wellbore (the hole drilled in the earth) and the tubing or casing string being lowered inside.
  • This process typically involves:
    • Running the string: Lowering the tubing or casing into the wellbore.
    • Setting depth: Reaching the desired depth for the connection.
    • Running the packer: Lowering a packer (a device that seals off the wellbore) to the desired location.
    • Making a seal: Ensuring the packer or other sealing mechanism creates a tight, leak-free connection.

Importance of "Make a Connection" in Drilling and Completion

  • Safety: A strong connection is crucial to prevent leaks, blowouts, and other safety hazards.
  • Efficiency: A secure connection ensures smooth operation of the well and minimizes downtime.
  • Wellbore Integrity: A tight connection is essential for maintaining the structural integrity of the wellbore and preventing fluid migration.
  • Production: A successful connection allows for the flow of oil, gas, or other fluids to the surface.

To clarify the meaning of "make a connection," you need to understand the context in which it's being used. For example, are they talking about connecting tubing sections or establishing a connection with the wellbore?

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
What is the scientific classification of an atom?
How to use Monte Carlo similation using python to similate Project Risks?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back