What is Well Managed Project used in Project Planning & Scheduling?
Asked 3 months ago | Viewed 49times
0

What specific criteria and factors contribute to a "Well Managed Project" in Project Planning & Scheduling, encompassing both technical and soft skills, and how do these criteria differ across project types (e.g., software development, construction, marketing campaigns) and project life cycles?

comment question
1 Answer(s)
0

The term "Well Managed Project" isn't a specific methodology or tool used in Project Planning & Scheduling. It's more of a general concept describing a project that is effectively planned, executed, and controlled.

However, we can understand what makes a project "well managed" by looking at the key components of successful project planning and scheduling:

Characteristics of a Well Managed Project:

  • Clear Goals and Objectives: The project has a well-defined scope, clear deliverables, and measurable objectives. Everyone involved understands what success looks like.
  • Detailed Planning and Scheduling: A robust plan outlines tasks, timelines, dependencies, resources, and potential risks. This plan is regularly reviewed and adjusted as needed.
  • Effective Communication: All stakeholders are kept informed about progress, changes, and potential issues. Communication is clear, frequent, and open.
  • Resource Management: Resources, including people, materials, and budget, are allocated efficiently and effectively.
  • Risk Management: Potential risks are identified, assessed, and mitigated. Contingency plans are in place to address unexpected challenges.
  • Quality Control: Processes are in place to ensure that the project deliverables meet the required standards and quality.
  • Continuous Monitoring and Evaluation: The project's progress is tracked and monitored against the plan. Issues are identified and addressed promptly.
  • Successful Completion: The project is delivered on time, within budget, and to the required standards.

Tools and Techniques that Contribute to Well-Managed Projects:

  • Project Management Methodologies: Agile, Waterfall, Prince2, Scrum, etc.
  • Project Planning Tools: Microsoft Project, Jira, Asana, Trello
  • Communication Tools: Slack, Microsoft Teams, Zoom
  • Risk Management Tools: Risk Register, Risk Assessment Matrix
  • Quality Management Tools: Quality Control Plans, Quality Audits

Key Takeaway:

While there's no official "Well Managed Project" tool, the concept highlights the importance of planning, communication, resource management, risk management, and continuous monitoring in ensuring a successful project. By implementing these principles, you can significantly improve your chances of delivering a well-managed project that achieves its objectives.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
How to use Monte Carlo similation using python to similate Project Risks?
What is the scientific classification of an atom?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back