What is Curvature (seismic) used in Project Planning & Scheduling?
Asked 3 months, 2 weeks ago | Viewed 56times
0

How does the concept of "curvature" in seismic data impact the project planning and scheduling of a seismic survey, particularly in terms of:

  • Data Acquisition: How does curvature affect the design of seismic lines, the positioning of sources and receivers, and the overall efficiency of data acquisition?
  • Data Processing: How does curvature influence the choice of processing algorithms, the effectiveness of noise attenuation, and the accuracy of structural interpretation?
  • Project Timeline & Budget: What are the potential implications of curvature on the duration and cost of a seismic project, including the need for additional surveys, processing time, and expertise?

This detailed question explores the multifaceted impact of curvature on various stages of a seismic project, prompting an in-depth understanding of how this geological feature influences project planning and scheduling.

comment question
1 Answer(s)
0

Curvature in seismic data is not directly used in project planning and scheduling. Curvature is a seismic attribute that helps geophysicists and geologists understand the shape and geometry of geological structures beneath the earth's surface. It's useful for:

  • Identifying faults and fractures: Curvature anomalies can pinpoint areas where faults and fractures are present, which can be important for understanding reservoir properties and potential risks during drilling.
  • Mapping geological structures: Curvature helps delineate folds, domes, and other structures that can influence the distribution of hydrocarbons or other resources.
  • Understanding reservoir continuity: Curvature can be used to map the extent and continuity of reservoir layers.

However, this information is then used indirectly in project planning and scheduling:

  • Drilling planning: By understanding the location and orientation of faults and fractures, drilling engineers can plan well trajectories to avoid or minimize risks.
  • Reservoir modeling: Curvature data is used to create more accurate geological models, which are crucial for estimating reservoir size and productivity.
  • Production planning: Understanding the shape and continuity of reservoirs helps in optimizing production strategies.

Therefore, while curvature itself is not directly used in project planning and scheduling, the geological insights it provides are essential for making informed decisions during those processes.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
What is the scientific classification of an atom?
How to use Monte Carlo similation using python to similate Project Risks?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back