What is Known-Unknown used in Drilling & Well Completion?
Asked 3 months, 2 weeks ago | Viewed 49times
0

How does the concept of "Known-Unknown" in drilling and well completion differ from the traditional "Known-Unknown" in risk assessment, and how does this distinction impact decision-making during the various phases of drilling and well completion operations?

Elaboration:

This question explores the specific application of the "Known-Unknown" concept in the drilling and well completion context, contrasting it with the more general risk assessment concept. It prompts discussion on:

  • Specific Examples: What are some examples of "Known-Unknowns" encountered during drilling and well completion operations (e.g., potential reservoir characteristics, formation pressure, etc.)?
  • Impact on Decision-Making: How do these "Known-Unknowns" influence the design of drilling programs, completion strategies, and operational decisions?
  • Mitigation Strategies: What methods are used to address and potentially mitigate these "Known-Unknowns" during the drilling and completion process (e.g., geological surveys, well testing, etc.)?
  • Risk Management: How does the understanding of "Known-Unknowns" impact risk assessment and mitigation in this industry?

By comparing the traditional and specific applications of the "Known-Unknown" concept, the answer can provide a deeper understanding of the challenges and opportunities presented by uncertainty in this field.

comment question
1 Answer(s)
0

In drilling and well completion, "Known-Unknown" refers to a method for managing uncertainty and risk during the drilling and completion process. It's a way of identifying and analyzing potential unknowns that could impact the project's success.

Here's a breakdown:

Known: This refers to factors that are well-understood and predictable. These could include things like:

  • Geological data: Existing well logs, seismic surveys, and other geological information.
  • Well design parameters: Target depth, casing sizes, and drilling mud properties.
  • Equipment specifications: Drilling rig capabilities, drill pipe dimensions, and tool types.

Unknown: This refers to factors that are uncertain or potentially unpredictable. These could include things like:

  • Formation properties: Reservoir pressure, permeability, and fluid type.
  • Geomechanical risks: Fault zones, potential wellbore instability, and abnormal pressures.
  • Operational risks: Equipment failures, weather delays, and unforeseen logistical challenges.

The Known-Unknown framework helps to:

  1. Identify potential risks: By systematically categorizing information as known or unknown, engineers and operators can better understand potential threats to the project.
  2. Develop mitigation strategies: For each identified unknown, a plan can be developed to address the potential risk. This might involve acquiring more data, implementing contingency plans, or employing specialized techniques.
  3. Improve decision-making: By having a clear understanding of the known and unknown factors, stakeholders can make more informed decisions about drilling and completion activities.

Example:

Imagine a drilling operation targeting a shale formation. The known factors might include the well design, geological data from nearby wells, and equipment specifications. However, the unknown factors could include:

  • Reservoir pressure: Is the formation over-pressured or under-pressured?
  • Fracture network: How extensive and interconnected are the fractures within the shale?
  • Fluid type: Is it oil, gas, or a mixture?

By addressing these unknowns through data acquisition, modeling, and contingency planning, the operator can improve the chances of a successful drilling and completion operation.

In summary, the Known-Unknown approach is a valuable tool for managing risk and uncertainty in drilling and well completion. It encourages a proactive approach to identifying potential problems and developing strategies to mitigate them.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
What is the scientific classification of an atom?
How to use Monte Carlo similation using python to similate Project Risks?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back