What is Threshold Velocity used in Drilling & Well Completion?
Asked 3 months, 1 week ago | Viewed 60times
0

How does the concept of "threshold velocity" in drilling and well completion affect the design and implementation of drilling fluids and completion fluids, considering factors such as:

  • Formation type and properties: How does the threshold velocity for different formation types (e.g., sandstone, shale, carbonates) influence the choice of drilling fluid rheology, density, and additives?
  • Wellbore geometry and inclination: Does the threshold velocity change with wellbore diameter, depth, and inclination? How do these factors influence the need for specific drilling fluid properties and the risk of formation damage?
  • Drilling and completion operations: How does the threshold velocity impact drilling fluid selection, flow rate optimization, and the choice of completion fluids and techniques?
  • Economic considerations: What are the trade-offs between optimizing drilling and completion operations with high-velocity fluids and potential formation damage associated with exceeding the threshold velocity?
  • Environmental concerns: How does the use of drilling and completion fluids with high velocities affect the potential for formation damage and the release of hydrocarbons and other contaminants into the environment?

In your answer, please discuss the interplay between these factors and how they contribute to a comprehensive understanding of threshold velocity in drilling and well completion.

comment question
1 Answer(s)
0

Threshold Velocity in Drilling & Well Completion

Threshold velocity is a critical concept in drilling and well completion, particularly in fluid flow management and particle transport. It refers to the minimum fluid velocity required to suspend or transport particles within a drilling fluid or completion fluid.

Here's a breakdown:

  • Fluid Velocity: The speed at which the fluid is moving through the wellbore or completion system.
  • Particle Transport: This refers to the movement of solid particles (like cuttings, sand, or proppant) within the fluid.
  • Threshold Velocity: The specific fluid velocity at which the upward force exerted by the fluid on a particle equals the downward force due to gravity. Below this velocity, the particles will settle out of the fluid.

Importance in Drilling & Well Completion:

  • Drilling:
    • Cuttings Removal: Maintaining sufficient fluid velocity above the threshold velocity ensures effective removal of drill cuttings from the wellbore, preventing wellbore blockage and drilling complications.
    • Hole Cleaning: This velocity helps maintain clean wellbores and ensures accurate formation evaluation.
  • Well Completion:
    • Proppant Transport: In hydraulic fracturing, exceeding the threshold velocity for proppant particles is essential for successful fracture stimulation. This ensures the proppant is carried to the fracture face and effectively props open the fracture.
    • Sand Control: Maintaining fluid velocities below the threshold velocity for sand grains is crucial for preventing sand production and well damage.
    • Completion Fluid Design: Understanding the threshold velocity for different particles in the completion fluid helps in designing a fluid that effectively transports proppant while minimizing the risk of sand production.

Factors Affecting Threshold Velocity:

  • Particle Size & Density: Larger and denser particles require higher threshold velocities to be transported.
  • Fluid Density & Viscosity: Higher density and viscosity fluids require higher threshold velocities.
  • Flow Regime: Turbulent flow generally requires lower threshold velocities compared to laminar flow.
  • Wellbore Diameter & Inclination: These factors affect the flow pattern and can influence the threshold velocity.

Key takeaway: Threshold velocity is a crucial parameter in drilling and well completion that determines the fluid velocity required to effectively transport particles, ensuring efficient operations and well integrity. By understanding this concept, engineers can optimize fluid flow and prevent operational challenges.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
How to use Monte Carlo similation using python to similate Project Risks?
What is the scientific classification of an atom?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back