What is Resource Identification used in Project Planning & Scheduling?
Asked 3 months, 3 weeks ago | Viewed 139times
0

How does the process of Resource Identification in Project Planning & Scheduling evolve over the course of a project, considering the interplay of resource availability, project scope changes, and the evolving understanding of resource requirements?

This question explores:

  • The dynamic nature of Resource Identification: It acknowledges that the process of identifying resources isn't a one-time event, but rather an ongoing activity throughout the project lifecycle.
  • The impact of external factors: It highlights the influence of resource availability, project scope changes, and the increasing understanding of resource needs on the resource identification process.
  • The importance of flexibility and adaptation: It prompts a discussion about how project managers can adapt their approach to resource identification to handle these dynamic factors.

Possible discussion points:

  • How do initial resource estimates change as the project progresses and a deeper understanding of the requirements is developed?
  • What strategies can be employed to manage resource availability fluctuations during the project?
  • How can scope changes be effectively integrated into the resource identification process to ensure timely adjustments?
  • What are the key factors that contribute to an evolving understanding of resource requirements throughout the project lifecycle?
  • What tools and techniques can be used to facilitate effective resource identification and management in a dynamic project environment?

By addressing these points, this question encourages a nuanced understanding of Resource Identification as a critical, continuous process in Project Planning & Scheduling.

comment question
1 Answer(s)
0

Resource Identification in Project Planning & Scheduling

Resource identification is a critical step in project planning and scheduling. It involves identifying and documenting all the resources needed to complete a project successfully. These resources can include:

1. Human Resources: * Individuals: Project manager, team members, subject matter experts, contractors, etc. * Skills & Expertise: Programming, design, marketing, finance, etc.

2. Material Resources: * Raw materials: Wood, steel, concrete, etc. * Equipment: Tools, machinery, vehicles, etc. * Supplies: Paper, ink, software licenses, etc.

3. Financial Resources: * Budget: The total amount allocated for the project. * Funding sources: Loans, grants, investments, etc.

4. Other Resources: * Time: The project duration, deadlines, and milestones. * Space: Office space, storage facilities, etc. * Information: Data, reports, research, etc.

Why is Resource Identification Important?

  • Accurate Planning: Knowing your resources allows for realistic project planning and scheduling.
  • Effective Allocation: Identifying resources helps you allocate them efficiently to the right tasks and teams.
  • Cost Management: Knowing your resource needs helps you estimate and manage project costs accurately.
  • Risk Mitigation: Resource identification helps identify potential risks and develop mitigation plans.
  • Project Success: Having the right resources in place is crucial for project completion on time and within budget.

Methods for Resource Identification:

  • Brainstorming: Gather project stakeholders to brainstorm all potential resources needed.
  • Work Breakdown Structure (WBS): Break down the project into smaller tasks and identify the resources required for each.
  • Past Project Records: Analyze past projects to identify common resources and their requirements.
  • Vendor Research: Identify potential vendors for materials, equipment, or services.

By accurately identifying and documenting your project resources, you lay the foundation for successful project planning and execution.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
What is the scientific classification of an atom?
How to use Monte Carlo similation using python to similate Project Risks?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back