What is Plateau used in Oil & Gas Specific Terms?
Asked 3 months, 3 weeks ago | Viewed 343times
0

How does the concept of "Plateau" in Oil & Gas differ from its general definition, and what are the key factors influencing the plateau duration and production rate in a specific oil or gas reservoir?

This question explores the following aspects:

  • Specific vs. General Definition: Understanding how "Plateau" in Oil & Gas differs from its common meaning in everyday language, highlighting its specific technical applications and implications.
  • Reservoir Characteristics: Analyzing how reservoir properties like size, permeability, pressure, and fluid composition influence the plateau duration and production rate.
  • Production Techniques: Investigating how extraction methods (e.g., primary, secondary, tertiary recovery) impact the plateau phase and its associated production levels.
  • Economic Factors: Considering the economic considerations that define a desired plateau duration and production rate, including factors like capital investment, operating costs, and market demand.

By delving into these aspects, the answer can provide a comprehensive understanding of the "Plateau" concept within the Oil & Gas industry and its significance for both technical and economic decisions.

comment question
1 Answer(s)
0

In the Oil & Gas industry, "plateau" has a specific meaning related to production. It refers to the period of time when oil or gas production from a well or reservoir reaches a stable, relatively constant rate. This happens after the initial peak production phase (also known as "decline") and before the production begins to decline again.

Here's a breakdown:

  • Early Production: This is characterized by high initial flow rates as the reservoir is initially tapped.
  • Peak Production: The highest production rate is reached.
  • Plateau Production: The production rate levels off and remains relatively constant. This can be attributed to factors like reservoir pressure and fluid properties stabilizing.
  • Decline: Production rates begin to decline again, due to factors like decreasing reservoir pressure or fluid depletion.

Plateau production is important because it represents a period of steady and predictable revenue generation. It allows for easier planning and budgeting for oil and gas companies.

Here are some specific examples of how "plateau" is used in the Oil & Gas industry:

  • "The well reached its plateau production rate after 6 months."
  • "The plateau production phase is expected to last for 5 years."
  • "The plateau production rate is crucial for determining the overall economic viability of the reservoir."

Understanding the concept of plateau production is essential for anyone working in the Oil & Gas industry, as it plays a significant role in production planning, economic analysis, and reservoir management.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
What is the scientific classification of an atom?
How to use Monte Carlo similation using python to similate Project Risks?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back