Project Planning & Scheduling

Standard Time

Standard Time: A Cornerstone of Efficient Project Planning and Scheduling

In the intricate world of project planning and scheduling, accuracy is paramount. One key element in achieving this accuracy is Standard Time. This concept, often overlooked, plays a crucial role in ensuring efficient project execution and meeting deadlines.

What is Standard Time?

Standard time is a quantifiable measure of the time it should take a qualified worker, operating at a normal pace, to perform a specific task, under standard working conditions. It's not about rushing or delaying, but rather establishing a realistic benchmark for task completion.

The Significance of Standard Time

Understanding standard time offers numerous benefits for project managers:

  • Accurate Project Estimates: Standard time allows for more realistic project estimates, minimizing the risk of underestimation and subsequent delays.
  • Resource Allocation Optimization: By knowing the time required for each task, project managers can allocate resources effectively, preventing overstaffing or understaffing.
  • Efficient Scheduling: With standardized task durations, project schedules can be created and adjusted with greater accuracy, leading to smoother workflow and on-time delivery.
  • Cost Control: Standard time helps in establishing realistic budgets by providing a clear picture of the total workforce hours required for the project.
  • Performance Benchmarking: Comparing actual task completion times to standard time provides valuable insights into individual and team performance, highlighting areas for improvement.

Determining Standard Time

Calculating standard time involves a few key steps:

  1. Task Analysis: Thoroughly understand the specific steps involved in the task.
  2. Work Measurement: Utilize methods like time studies, work sampling, or historical data to measure the time taken by qualified workers for each task step.
  3. Allowance for Breaks: Factor in standard break times and rest periods.
  4. Efficiency Factor: Account for factors like fatigue, interruptions, and learning curves, adjusting the time accordingly.

Beyond Time:

Standard time is not just about time itself, but also about the quality and effectiveness of the work performed. It encourages a focus on improving efficiency and minimizing waste, ultimately contributing to project success.

Conclusion

Standard time is an essential tool in the project manager's arsenal. By using this approach, projects can be planned and scheduled with greater accuracy, resources can be optimized, and overall project efficiency can be significantly improved. Embracing standard time as a core element of project management practice lays the foundation for successful project outcomes.


Test Your Knowledge

Quiz: Standard Time in Project Management

Instructions: Choose the best answer for each question.

1. What is standard time? a) The time it takes the fastest worker to complete a task. b) A subjective estimate of task completion time. c) A quantifiable measure of the time a qualified worker takes to complete a task under standard conditions. d) The average time taken by all workers to complete a task.

Answer

c) A quantifiable measure of the time a qualified worker takes to complete a task under standard conditions.

2. Which of these is NOT a benefit of using standard time in project management? a) Accurate project estimates b) Improved resource allocation c) Reduced team communication d) Efficient scheduling

Answer

c) Reduced team communication

3. What is the first step in determining standard time for a task? a) Performing a time study b) Collecting historical data c) Task analysis d) Applying an efficiency factor

Answer

c) Task analysis

4. When calculating standard time, what should be considered besides the time taken to perform the task itself? a) The worker's mood b) The weather conditions c) Allowances for breaks and rest periods d) The project manager's experience

Answer

c) Allowances for breaks and rest periods

5. How does standard time contribute to cost control in a project? a) By increasing the budget to accommodate unexpected delays. b) By providing a basis for realistic budget estimations based on workforce hours. c) By eliminating the need for project planning. d) By allowing project managers to overstaff projects.

Answer

b) By providing a basis for realistic budget estimations based on workforce hours.

Exercise: Calculating Standard Time

Scenario:

You are managing a project to build a website. One of the tasks is to design the website layout. Based on historical data, you know that a qualified web designer can complete this task in 10 hours. However, this data does not include breaks or an efficiency factor.

Task:

  1. Assume a standard break time of 1 hour per 8 hours of work.
  2. Apply an efficiency factor of 80% to account for interruptions and learning curves.
  3. Calculate the standard time for the website layout design task.

Exercice Correction

1. **Break time:** 10 hours of work / 8 hours = 1.25 break hours 2. **Efficiency factor:** 10 hours * 0.80 = 8 hours 3. **Total Standard Time:** 8 hours + 1.25 hours = 9.25 hours


Books

  • Project Management Institute (PMI). (2021). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Seventh Edition. PMI. Relevant sections: Chapters 6 (Project Schedule Management), 9 (Resource Management), and 10 (Communications Management) cover topics related to time estimation, resource allocation, and communication of standard time information.
  • Kerzner, H. (2020). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. John Wiley & Sons. Relevant sections: Chapters on work breakdown structure (WBS), scheduling methods (e.g., CPM, PERT), and resource allocation discuss the role of time estimation and standard time in project management.
  • Meredith, J. R., & Mantel, S. J. (2019). Project Management: A Managerial Approach. John Wiley & Sons. Relevant sections: Chapters on project planning and scheduling, resource management, and project control explore the use of standard time for accurate estimates and efficient resource allocation.
  • Wysocki, R. K., & Amy, D. (2019). Effective Project Management: Traditional, Agile, and Extreme. Wiley. Relevant sections: Chapters dealing with project scheduling, resource planning, and risk management delve into the importance of standard time in achieving realistic project goals.

Articles

  • Project Management Institute (PMI). (2020). Standard Time: A Key to Effective Project Management. PM Network, 34(9), 22-27. This article specifically focuses on the importance and application of standard time in project management.
  • Mousavi, S. M., & Mohammadi, M. (2015). A Comparative Study of Standard Time Calculation Methods in Project Management. International Journal of Engineering and Technology, 4(4), 197-202. This research paper compares different methods for calculating standard time, offering insights into various approaches.
  • Miller, R. W. (2008). The Importance of Standard Time in Project Management. Project Management Journal, 39(5), 5-12. This article emphasizes the value of using standard time for accurate project estimations and resource allocation.

Online Resources

  • Project Management Institute (PMI): https://www.pmi.org/ - The PMI website provides extensive resources on project management, including articles, webinars, and training materials related to time management and standard time.
  • Project Management Institute (PMI) Knowledge Center: https://www.pmi.org/learning/knowledge-center - The knowledge center offers a plethora of articles, guides, and resources on various project management topics, including time management and standard time.
  • Work Measurement Society (WMS): https://www.workmeasurementsoc.org/ - The WMS provides information on various methods and best practices for work measurement, including standard time calculation and analysis.

Search Tips

  • "Standard Time Project Management" - This general search will bring up a variety of articles, websites, and resources related to standard time in the context of project management.
  • "Standard Time Calculation Methods" - This search will provide you with information on various techniques for determining standard time, such as time studies and work sampling.
  • "Standard Time vs. Actual Time" - This search will help you understand the difference between standard time and actual time, and how they are used in project management.

Techniques

Standard Time: A Deep Dive

This document expands on the concept of Standard Time, breaking it down into specific chapters for a more comprehensive understanding.

Chapter 1: Techniques for Determining Standard Time

Determining standard time involves a meticulous process of observation, measurement, and calculation. Several techniques exist, each with its strengths and weaknesses:

1.1 Time Study: This classic method involves systematically observing and recording the time taken by a skilled worker to perform each element of a task. Multiple observations are necessary to account for variations. This technique requires careful planning, trained observers, and a standardized procedure to ensure accuracy. The resulting data is analyzed to determine the normal time, which is then adjusted for allowances.

1.2 Work Sampling: Unlike continuous time study, work sampling involves random observations of a worker's activities over a period. The proportion of time spent on each task element is used to estimate the time required. This is less disruptive than continuous time study but requires a larger number of observations to achieve the same level of accuracy.

1.3 Predetermined Motion Time Systems (PMTS): These systems, such as MTM (Methods-Time Measurement) and MOST (Maynard Operation Sequence Technique), utilize standardized data tables to estimate the time required for basic human movements. By breaking down a task into these basic movements, the total time can be calculated without direct observation. This is efficient for repetitive tasks but requires expertise in applying the chosen PMTS.

1.4 Historical Data Analysis: If sufficient reliable data exists from past projects, it can be analyzed to estimate standard times for similar tasks. This method is quicker and less disruptive than direct observation but requires careful validation to ensure the data's accuracy and relevance. It is most useful when tasks are highly repetitive and little variation is expected.

1.5 Expert Estimation: While less precise, expert estimation can be used for tasks that are difficult or impractical to observe directly. Experienced workers or engineers can provide estimates based on their knowledge and experience. This method is best used in conjunction with other techniques or for preliminary estimates.

Chapter 2: Models for Standard Time Calculation

Once the basic time for a task is determined using one of the techniques mentioned above, several models can be applied to arrive at the standard time. These models account for factors that affect worker performance:

2.1 Normal Time: This represents the average time a qualified worker takes to complete a task working at a normal pace. It is derived from the observed time, adjusted for any observed variations from normal performance.

2.2 Allowance Factor: This factor accounts for delays, breaks, fatigue, personal needs, and other factors that affect the worker's efficiency. Allowance factors can be based on industry standards, collective bargaining agreements, or company policies. Common methods include percentage allowances or time-based allowances.

2.3 Standard Time Calculation: The standard time is then calculated by adding the allowance factor to the normal time:

Standard Time = Normal Time * (1 + Allowance Factor)

Chapter 3: Software for Standard Time Management

Several software packages facilitate standard time management and project scheduling:

  • Project Management Software: Many popular project management tools (e.g., Microsoft Project, Primavera P6, Asana, Jira) allow for the input of task durations, resource allocation, and scheduling based on standard times.

  • Specialized Time Study Software: Some software packages are specifically designed for time study and work measurement, providing tools for data collection, analysis, and reporting.

  • ERP Systems: Enterprise Resource Planning (ERP) systems often incorporate modules for project management and resource allocation, enabling integration of standard time data with other business processes.

The choice of software depends on project complexity, organizational needs, and budget. The software should integrate well with existing systems and provide the necessary features for data management, analysis, and reporting.

Chapter 4: Best Practices for Implementing Standard Time

Effective implementation of standard time requires careful planning and execution:

  • Clear Definition of Tasks: Tasks must be clearly defined and broken down into smaller, measurable elements.

  • Trained Personnel: Workers involved in time studies should be properly trained to ensure accuracy and consistency.

  • Appropriate Techniques: The most appropriate technique for determining standard time should be chosen based on the nature of the task and available resources.

  • Regular Review and Updates: Standard times should be reviewed and updated periodically to account for changes in technology, processes, and worker skills.

  • Employee Involvement: Involving employees in the process can improve buy-in and accuracy. Open communication and feedback are crucial.

  • Focus on Continuous Improvement: Standard time should not be seen as a fixed target, but rather as a benchmark for continuous improvement. Analyzing deviations from standard time can reveal areas for process optimization.

Chapter 5: Case Studies of Standard Time Implementation

(This chapter would contain specific examples of how standard time has been successfully implemented in various industries and projects. Each case study would detail the challenges faced, the techniques employed, the results achieved, and the lessons learned. Examples could include manufacturing, construction, software development, or service industries.) For brevity, this section is left unpopulated, but examples could include a manufacturing plant improving production efficiency by 15% through optimized task times, or a construction company reducing project delays by accurately estimating task durations.