Project Planning & Scheduling

Organizational Breakdown Structure ("OBS")

The Organizational Breakdown Structure (OBS): A Guide for Oil & Gas Project Management

In the complex world of oil and gas projects, clear and efficient organization is paramount. The Organizational Breakdown Structure (OBS) emerges as a crucial tool for achieving this. It provides a structured framework that links project tasks to specific organizational units, ensuring a clear division of responsibilities and streamlined communication.

Understanding the OBS

The OBS depicts the project organization as a hierarchy, much like an organizational chart. It breaks down the project into manageable work packages, each assigned to a particular department or team within the organization. This visual representation clearly defines who is responsible for each task, eliminating ambiguity and fostering accountability.

Benefits of Using the OBS in Oil & Gas Projects:

  • Enhanced Communication: The OBS provides a shared understanding of roles and responsibilities, facilitating clear communication across departments and levels.
  • Improved Accountability: By assigning work packages to specific units, the OBS establishes a direct line of accountability, making it easier to track progress and identify any potential bottlenecks.
  • Optimized Resource Allocation: The OBS helps in effectively allocating resources to each work package based on the required expertise and workload. This ensures that the right people are working on the right tasks, maximizing efficiency.
  • Streamlined Coordination: The OBS facilitates smoother coordination between different departments and teams, ensuring that all project activities are synchronized and aligned with overall project goals.
  • Risk Mitigation: By clearly defining roles and responsibilities, the OBS helps identify potential risks early on, enabling proactive risk management strategies.

Example of an OBS in Oil & Gas:

Imagine an offshore drilling project. The OBS could break down the project into various work packages, such as:

  • Drilling Operations: Assigned to the drilling team.
  • Production Engineering: Assigned to the production engineering team.
  • Logistics and Supply Chain: Assigned to the logistics and supply chain team.
  • Safety and Environment: Assigned to the safety and environment team.

Each of these work packages would further be broken down into smaller tasks, with specific responsibilities assigned to individuals or groups within the respective teams.

Challenges and Considerations:

While the OBS offers significant benefits, its implementation requires careful consideration.

  • Complexity: Large-scale oil and gas projects can necessitate a complex OBS, requiring thorough planning and clear communication.
  • Flexibility: The OBS should be flexible enough to accommodate changes in project scope or requirements.
  • Integration with Other Structures: The OBS needs to be integrated with other project management tools, such as the Work Breakdown Structure (WBS) and the Responsibility Assignment Matrix (RAM), for a comprehensive approach.

Conclusion:

The OBS is an essential tool for oil and gas project management, providing a clear framework for organizing project tasks, assigning responsibilities, and optimizing resources. By adopting a well-defined OBS, companies can significantly enhance communication, accountability, and overall project efficiency, leading to successful and profitable outcomes.


Test Your Knowledge

OBS Quiz:

Instructions: Choose the best answer for each question.

1. What is the primary purpose of the Organizational Breakdown Structure (OBS)?

a) To define project timelines and milestones. b) To assign tasks to specific organizational units. c) To track project expenses and budgets. d) To assess project risks and potential problems.

Answer

b) To assign tasks to specific organizational units.

2. Which of the following is NOT a benefit of using an OBS in oil & gas projects?

a) Enhanced communication. b) Improved accountability. c) Simplified project reporting. d) Optimized resource allocation.

Answer

c) Simplified project reporting.

3. What is the relationship between the OBS and the Work Breakdown Structure (WBS)?

a) The OBS is a more detailed breakdown of the WBS. b) The WBS is a more detailed breakdown of the OBS. c) The OBS and WBS are separate but complementary structures. d) The OBS and WBS are identical.

Answer

c) The OBS and WBS are separate but complementary structures.

4. Which of the following elements would typically be included in an OBS for an offshore drilling project?

a) Marketing and Sales b) Human Resources c) Drilling Operations d) Customer Service

Answer

c) Drilling Operations

5. What is a key challenge associated with implementing an OBS in large-scale oil & gas projects?

a) Lack of available software tools. b) Resistance from project team members. c) Difficulty in integrating with other project management tools. d) Complexity of the project and the need for clear communication.

Answer

d) Complexity of the project and the need for clear communication.

OBS Exercise:

Task:

You are a project manager overseeing the construction of a new oil pipeline. Develop a simplified OBS for this project, considering the following departments:

  • Engineering & Design
  • Construction & Installation
  • Environmental & Safety
  • Logistics & Procurement

Instructions:

  1. Create a simple diagram or table depicting the OBS structure.
  2. Assign at least 3 specific work packages under each department.
  3. Briefly describe the key responsibilities for each work package.

Example:

Department: Engineering & Design * Work Package 1: Pipeline Design and Route Planning * Responsible for: Defining pipeline specifications, selecting optimal route, creating detailed drawings. * Work Package 2: Material Specifications and Procurement * Responsible for: Defining material requirements, sourcing suppliers, managing material delivery. * Work Package 3: Construction Drawings and Documentation * Responsible for: Developing construction drawings, providing technical specifications, creating project documentation.

Exercice Correction

Here's a sample OBS structure for the oil pipeline project:


**Organizational Breakdown Structure (OBS): Oil Pipeline Project**


**Engineering & Design**
  • Work Package 1: Pipeline Design and Route Planning
    • Responsible for: Defining pipeline specifications, selecting optimal route, creating detailed drawings, and conducting feasibility studies.
  • Work Package 2: Material Specifications and Procurement
    • Responsible for: Defining material requirements, sourcing suppliers, managing material delivery schedules, and ensuring quality control.
  • Work Package 3: Construction Drawings and Documentation
    • Responsible for: Developing construction drawings, providing technical specifications, creating project documentation, and ensuring adherence to industry standards.

**Construction & Installation**
  • Work Package 1: Pipeline Construction
    • Responsible for: Managing excavation, pipe laying, welding, and coating activities, ensuring adherence to safety protocols.
  • Work Package 2: Pipeline Testing and Commissioning
    • Responsible for: Conducting hydrostatic testing, pressure testing, and commissioning the pipeline, ensuring it meets operational standards.
  • Work Package 3: Construction Site Management
    • Responsible for: Managing site logistics, safety procedures, environmental compliance, and communication with local authorities.

**Environmental & Safety**
  • Work Package 1: Environmental Impact Assessment and Mitigation
    • Responsible for: Conducting environmental impact assessments, developing mitigation plans, and ensuring compliance with environmental regulations.
  • Work Package 2: Safety Management and Risk Assessment
    • Responsible for: Implementing safety procedures, conducting risk assessments, managing safety training, and ensuring adherence to safety standards.
  • Work Package 3: Emergency Response Planning and Training
    • Responsible for: Developing emergency response plans, conducting drills, and ensuring preparedness for potential incidents.

**Logistics & Procurement**
  • Work Package 1: Material Procurement and Logistics
    • Responsible for: Sourcing materials, managing suppliers, overseeing material transportation and storage, and ensuring timely delivery.
  • Work Package 2: Equipment and Machinery Management
    • Responsible for: Procurement, maintenance, and deployment of construction equipment, ensuring operational efficiency and safety.
  • Work Package 3: Project Budget and Cost Control
    • Responsible for: Managing project budget, tracking expenses, negotiating contracts, and ensuring financial viability.

This is just a basic example, and the OBS for a real-world oil pipeline project would be much more detailed. Each work package could be further broken down into smaller tasks, and the specific responsibilities within each work package would be assigned to individuals or teams.


Books

  • Project Management Institute (PMI). (2017). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) (7th ed.). Project Management Institute.
    • Chapter 10: Project Communications Management discusses how OBS contributes to effective communication in projects.
  • Kerzner, H. (2017). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. John Wiley & Sons.
    • This book provides a comprehensive overview of project management methodologies, including a detailed section on organizational structures and their role in projects.
  • Meredith, J. R., & Mantel, S. J. (2018). Project Management: A Managerial Approach. John Wiley & Sons.
    • This text covers various aspects of project management, including a section on the importance of organizational structures in project success.

Articles

  • "The Organizational Breakdown Structure (OBS) in Project Management" by Construction & Engineering Journal.
    • This article provides a detailed explanation of the OBS, its benefits, and implementation in construction projects. It offers valuable insights applicable to oil & gas projects.
  • "Organizational Breakdown Structure (OBS) and Its Importance in Project Management" by Project Management Institute (PMI).
    • This article from PMI highlights the key elements of OBS and its role in improving project efficiency.
  • "How to Create an Effective Organizational Breakdown Structure (OBS)" by ProjectManagement.com.
    • This article provides practical guidance on creating a functional OBS, outlining its key components and considerations.

Online Resources

  • Project Management Institute (PMI): PMI offers extensive resources on project management, including articles, white papers, and online courses on OBS and its application in various industries.
  • ProjectManagement.com: This website provides a wealth of information on project management topics, including several articles and tutorials on OBS creation and implementation.
  • Construction & Engineering Journal: This journal features articles and research papers relevant to construction and engineering projects, with a focus on project management techniques like OBS.

Search Tips

  • "Organizational Breakdown Structure + oil and gas"
  • "OBS + project management + offshore drilling"
  • "OBS example + oil & gas industry"
  • "Benefits of using OBS in oil and gas projects"

Techniques

Chapter 1: Techniques for Developing an Effective OBS

This chapter delves into the techniques used in constructing an efficient and effective OBS for oil and gas projects.

1.1. Defining Project Scope and Objectives:

  • Clearly defining the project scope and objectives is crucial for establishing the foundation of the OBS. This involves identifying the specific deliverables, timelines, and key performance indicators (KPIs) for the project.
  • A thorough understanding of the project's goals and requirements ensures that the OBS accurately reflects the organizational structure needed to achieve them.

1.2. Identifying Key Work Packages:

  • The next step involves breaking down the project into manageable work packages. These work packages should be clearly defined and encompass specific tasks, deliverables, and responsibilities.
  • The level of detail in the work package breakdown should be appropriate for the complexity and size of the project.

1.3. Identifying Organizational Units:

  • This step focuses on identifying the relevant departments, teams, and individuals within the organization responsible for executing the project work packages.
  • This involves analyzing the organizational structure, expertise, and resources available within the company.

1.4. Mapping Work Packages to Organizational Units:

  • This crucial step involves mapping each work package to the appropriate organizational unit responsible for its execution.
  • This mapping should consider factors like expertise, resources, and previous experience of the respective unit.

1.5. Using a Hierarchical Structure:

  • The OBS should be represented using a hierarchical structure, similar to an organizational chart. This provides a visual representation of the reporting lines and responsibilities within the project organization.
  • The hierarchical structure allows for a clear understanding of how different work packages and organizational units interact and contribute to the overall project.

1.6. Utilizing Tools and Templates:

  • Several tools and templates can facilitate the development and management of the OBS. These tools may include project management software, spreadsheets, and specialized OBS creation software.
  • Utilizing these tools can streamline the process, ensure consistency, and facilitate communication within the project team.

1.7. Continuous Review and Adjustment:

  • The OBS is not static. It should be continuously reviewed and adjusted as project requirements evolve or unforeseen circumstances arise.
  • This ensures that the OBS remains relevant and effective throughout the project lifecycle.

1.8. Communicating the OBS to all Stakeholders:

  • Clear and concise communication of the OBS to all project stakeholders, including team members, management, and external contractors, is critical.
  • This ensures everyone involved understands their roles, responsibilities, and reporting structures within the project.

1.9. Utilizing Visual Representations:

  • Using visual representations like diagrams or charts to depict the OBS can significantly enhance understanding and facilitate communication.
  • These visual aids can help stakeholders quickly grasp the project structure and identify key relationships between work packages and organizational units.

Chapter 2: Models of OBS for Oil & Gas Projects

This chapter explores different models of OBS commonly employed in oil & gas project management.

2.1. Functional OBS:

  • This model structures the OBS based on functional areas or departments within the organization, such as drilling, production, engineering, logistics, and safety.
  • It emphasizes specialization and expertise within each functional area and promotes efficient resource allocation.

2.2. Project-Based OBS:

  • This model structures the OBS around the project itself, with teams dedicated to specific project phases or deliverables.
  • It provides a focused approach, allowing for rapid decision-making and clear accountability within the project team.

2.3. Matrix OBS:

  • This model combines elements of functional and project-based OBS, creating a matrix structure where individuals report to both a functional manager and a project manager.
  • It facilitates resource sharing, collaboration, and expertise transfer across projects.

2.4. Hybrid OBS:

  • This model combines different OBS models to suit the unique requirements of the project. For example, a project could utilize a functional OBS for certain phases and a project-based OBS for others.
  • It allows for flexibility and adaptability to meet evolving project needs.

2.5. Considerations for Choosing an OBS Model:

  • The choice of OBS model depends on various factors like project complexity, organizational structure, resource availability, and project objectives.
  • Evaluating the project's specific needs and requirements is crucial for selecting the most appropriate OBS model.

2.6. Examples of OBS Models in Oil & Gas:

  • Exploration & Production Project: A project-based OBS may be suitable for this type of project, with teams dedicated to specific phases like exploration, appraisal, and development.
  • Refining Project: A functional OBS could be more effective, with teams specializing in areas like process engineering, construction, and environmental safety.
  • Offshore Installation Project: A matrix OBS might be suitable for coordinating activities across different disciplines, such as engineering, construction, and marine operations.

Chapter 3: Software for Managing OBS

This chapter highlights software solutions that support the creation, management, and analysis of OBS for oil & gas projects.

3.1. Project Management Software:

  • Popular project management software solutions like Microsoft Project, Primavera P6, and Oracle Primavera Cloud provide features for creating, managing, and reporting on the OBS.
  • They offer tools for defining work packages, assigning responsibilities, and tracking progress against the OBS.

3.2. Specialized OBS Software:

  • Specific software solutions tailored for OBS management offer advanced features like visualization, reporting, and integration with other project management tools.
  • Examples include Project Management Institute's (PMI) OBS Designer and specialized modules in enterprise resource planning (ERP) systems.

3.3. Key Features of OBS Management Software:

  • Work Package Definition and Management: Ability to define and manage work packages, including their scope, deliverables, and responsibilities.
  • Organizational Unit Mapping: Ability to map work packages to specific organizational units and define reporting relationships.
  • Hierarchical Structure Visualization: Ability to create and visualize the OBS using hierarchical diagrams or charts.
  • Resource Allocation and Tracking: Ability to track resource allocation against work packages and analyze resource utilization.
  • Progress Reporting and Monitoring: Ability to monitor project progress and track deviations from the planned OBS.
  • Collaboration and Communication: Ability to facilitate collaboration and communication within the project team through features like task assignments, discussions, and notifications.

3.4. Benefits of Using OBS Management Software:

  • Enhanced organization and efficiency in managing project work.
  • Improved communication and collaboration among project stakeholders.
  • Enhanced accountability and tracking of responsibilities.
  • Real-time visibility into project progress and resource allocation.
  • Streamlined reporting and analysis for project performance monitoring.

Chapter 4: Best Practices for Implementing OBS in Oil & Gas Projects

This chapter outlines key best practices to ensure successful implementation and utilization of the OBS in oil & gas projects.

4.1. Start Early and Involve Key Stakeholders:

  • The OBS should be developed early in the project lifecycle, involving key stakeholders from all relevant departments and teams.
  • This ensures that the OBS reflects the project's needs and aligns with the organization's capabilities.

4.2. Establish Clear Definitions and Responsibilities:

  • Clearly define work packages, deliverables, and responsibilities for each organizational unit.
  • This eliminates ambiguity and promotes accountability within the project team.

4.3. Maintain Flexibility and Adaptability:

  • The OBS should be flexible enough to accommodate changes in project scope, requirements, or organizational structures.
  • Regularly review and adjust the OBS to ensure it remains relevant and effective throughout the project lifecycle.

4.4. Integrate with Other Project Management Tools:

  • Integrate the OBS with other project management tools like the Work Breakdown Structure (WBS), Responsibility Assignment Matrix (RAM), and project scheduling tools.
  • This creates a comprehensive framework for managing the project and facilitates seamless communication and collaboration.

4.5. Provide Training and Support:

  • Ensure all project stakeholders are adequately trained on the OBS and its utilization.
  • Provide ongoing support and guidance to ensure the OBS is effectively used within the project team.

4.6. Monitor and Evaluate Performance:

  • Regularly monitor the OBS's effectiveness in facilitating project execution.
  • Evaluate project performance metrics to identify areas for improvement and refine the OBS as needed.

4.7. Communicate and Document:

  • Effectively communicate the OBS to all project stakeholders.
  • Document the OBS and its updates for reference and future projects.

4.8. Use a Visual Representation:

  • Utilize visual representations like diagrams or charts to facilitate understanding and communication of the OBS.
  • This helps stakeholders quickly grasp the project structure and identify key relationships between work packages and organizational units.

4.9. Seek Expert Guidance:

  • For complex projects or challenging organizational structures, seeking expert guidance from project management professionals or consultants specializing in OBS development can be beneficial.

Chapter 5: Case Studies of OBS Implementation in Oil & Gas Projects

This chapter presents real-world examples of how OBS has been successfully implemented in oil & gas projects, highlighting the benefits and lessons learned.

5.1. Case Study 1: Offshore Platform Construction:

  • Project: Construction of a new offshore oil platform in the North Sea.
  • Challenge: Managing complex and geographically distributed activities across various disciplines, including engineering, construction, and marine operations.
  • OBS Solution: A matrix OBS was implemented, with dedicated teams for each discipline, reporting to both functional managers and the project manager.
  • Benefits: Enhanced coordination and collaboration across disciplines, improved resource allocation, and successful completion of the project within budget and schedule.

5.2. Case Study 2: Oil Field Development:

  • Project: Development of a new oil field in the Middle East.
  • Challenge: Managing a large-scale project with complex engineering, drilling, and production activities.
  • OBS Solution: A hybrid OBS was adopted, combining a functional structure for core engineering and technical activities with a project-based structure for specific development phases.
  • Benefits: Improved resource allocation, enhanced accountability, and successful development and production of the oil field.

5.3. Case Study 3: Pipeline Installation:

  • Project: Installation of a new pipeline across challenging terrain in a remote region.
  • Challenge: Managing complex logistics, environmental considerations, and regulatory approvals.
  • OBS Solution: A functional OBS was implemented, with dedicated teams for engineering, construction, logistics, and environmental compliance.
  • Benefits: Clear responsibilities, streamlined logistics, and successful installation of the pipeline, meeting all environmental and regulatory requirements.

5.4. Lessons Learned:

  • Early Planning: The importance of developing the OBS early in the project lifecycle, involving key stakeholders from all relevant departments.
  • Flexibility and Adaptability: The need for flexibility to adjust the OBS as project requirements evolve or unforeseen circumstances arise.
  • Integration: The benefits of integrating the OBS with other project management tools for a comprehensive approach.
  • Communication: The critical role of effective communication in disseminating the OBS to all project stakeholders and ensuring understanding of roles and responsibilities.

5.5. Conclusion:

These case studies demonstrate the effectiveness of the OBS in facilitating successful project execution in oil & gas projects. By carefully planning, implementing, and managing the OBS, organizations can enhance communication, accountability, and efficiency, leading to improved project outcomes.