Budgeting & Financial Control

Feasibility

Striking Gold or Digging a Dry Hole: Feasibility in Oil & Gas Projects

The oil and gas industry is notorious for its high-stakes ventures. A single exploration project can cost millions, and the success hinges on a crucial question: is it feasible? This simple word holds immense weight, encompassing both the technical and commercial viability of a project.

Beyond the Technical: The Two Pillars of Feasibility

In the oil and gas world, feasibility isn't just about whether a well will produce oil. It's a two-pronged assessment:

1. Technical Feasibility: This focuses on the practical aspects of extraction. Can the oil be extracted safely and efficiently? Do the necessary technologies exist? Can we overcome geological challenges?

2. Business Feasibility: This delves into the financial and organizational aspects. Will the project be profitable? Does it align with our strategic goals? Do we have the necessary resources and expertise?

Drilling Down Deeper: Examples of Feasibility in Action

Here are a few real-world examples of how feasibility plays out in oil and gas projects:

  • Unconventional Resources: Extracting oil from shale formations requires specialized techniques and technologies. Technical feasibility assesses if the technology is mature enough and if the reservoir conditions allow for effective production. Business feasibility analyzes the cost of drilling, the potential volume of oil recoverable, and the overall profitability of the project.
  • Offshore Exploration: Venturing into deep-sea environments presents unique technical challenges. Technical feasibility considers the feasibility of building platforms, the risks of harsh weather conditions, and the capabilities of extraction equipment. Business feasibility evaluates the financial viability of expensive infrastructure, the potential yield of oil, and the regulatory landscape.
  • Carbon Capture and Storage: As the industry focuses on sustainability, projects aiming to capture and store carbon emissions require thorough feasibility studies. Technical feasibility assesses the efficiency of carbon capture technologies and the safety of storage options. Business feasibility considers the cost of implementation, the potential for carbon credits, and the long-term viability of the project.

A Crucial Step Towards Success:

Feasibility studies are not mere academic exercises. They are essential tools for navigating the complex world of oil and gas projects. By thoroughly evaluating both the technical and business aspects, companies can identify potential pitfalls and make informed decisions. Ultimately, a successful project hinges on a sound understanding of what is feasible and what is not.

In Conclusion:

Feasibility is the cornerstone of any successful oil and gas project. It's the bridge between ambition and reality, guiding decision-making and ensuring that companies are not merely chasing shadows but pursuing tangible opportunities. By taking a holistic approach that considers both technical and business dimensions, oil and gas companies can increase their chances of striking gold instead of digging a dry hole.


Test Your Knowledge

Quiz: Striking Gold or Digging a Dry Hole: Feasibility in Oil & Gas Projects

Instructions: Choose the best answer for each question.

1. What are the two primary aspects of feasibility in oil and gas projects?

a) Environmental impact and community relations b) Technical feasibility and business feasibility c) Regulatory compliance and safety d) Production volume and market demand

Answer

b) Technical feasibility and business feasibility

2. Which of the following scenarios would NOT be considered under the umbrella of technical feasibility?

a) Assessing the effectiveness of a new drilling technique for unconventional resources. b) Evaluating the financial viability of a proposed offshore platform construction. c) Determining the potential volume of oil recoverable from a discovered reservoir. d) Assessing the risks associated with drilling in a seismically active region.

Answer

b) Evaluating the financial viability of a proposed offshore platform construction.

3. Why are feasibility studies crucial for oil and gas companies?

a) To satisfy regulatory requirements before commencing a project. b) To identify potential risks and challenges before committing significant resources. c) To demonstrate the environmental friendliness of their operations. d) To gain public approval for their projects.

Answer

b) To identify potential risks and challenges before committing significant resources.

4. Which aspect of feasibility would primarily analyze the potential profitability of a project, considering factors like production costs, market price, and operational expenses?

a) Technical feasibility b) Business feasibility c) Environmental feasibility d) Social feasibility

Answer

b) Business feasibility

5. Which of the following is NOT an example of how feasibility plays out in real-world oil and gas projects?

a) Assessing the environmental impact of a pipeline project. b) Determining the technological capabilities required for drilling in deep-sea environments. c) Evaluating the costs and potential returns of a carbon capture and storage initiative. d) Analyzing the feasibility of extracting oil from a shale formation using hydraulic fracturing.

Answer

a) Assessing the environmental impact of a pipeline project.

Exercise: Feasibility Analysis for a New Oil Field

Scenario: You are a project manager for an oil and gas company evaluating the feasibility of developing a new oil field in a remote location. The field is estimated to hold a significant volume of oil, but it's located in a challenging environment with potential geological and environmental challenges.

Task: Based on the information provided in the text, create a preliminary feasibility analysis for this project. Address both technical and business feasibility aspects, highlighting potential risks and opportunities.

Instructions: * Technical Feasibility: * What are the potential technical challenges you might encounter in this remote location? * What technologies and expertise would be needed to overcome these challenges? * What are the potential risks associated with drilling in this specific environment? * Business Feasibility: * What are the potential costs involved in developing the oil field, including drilling, infrastructure, and transportation? * How would you assess the profitability of the project, considering the estimated oil reserves and market prices? * What are the potential regulatory and environmental hurdles you might face? * How would you address the challenges of a remote location, including logistics and workforce?

Note: This exercise is intended to stimulate critical thinking and provide a framework for applying the concept of feasibility to a real-world project. There is no single "correct" answer, and your analysis should reflect your understanding of the principles discussed in the text.

Exercice Correction

This is a sample correction, and your own analysis might differ depending on your approach and assumptions.

Technical Feasibility:

  • Challenges:
    • Remote location: Difficulty accessing the site, potentially requiring specialized transportation and infrastructure.
    • Challenging geology: Unpredictable formations, potential for instability, requiring advanced drilling techniques and risk mitigation strategies.
    • Environmental considerations: Potential for ecological impact, requiring careful planning and environmental impact assessments.
  • Technologies & Expertise:
    • Advanced drilling techniques: Horizontal drilling, directional drilling, hydraulic fracturing, depending on the geology.
    • Environmental monitoring and mitigation technologies: To minimize impact on local ecosystems and comply with regulations.
    • Remote operations expertise: For managing logistics, communication, and workforce in a remote setting.
  • Risks:
    • Technical failure: Potential for equipment malfunctions, drilling complications, and unexpected geological conditions.
    • Environmental damage: Accidental spills, habitat destruction, and potential for long-term environmental consequences.
    • Safety risks: Working in a remote and challenging environment poses unique safety risks for personnel.

Business Feasibility:

  • Costs:
    • High capital investment: Significant costs for drilling, constructing infrastructure (roads, pipelines, processing facilities), and transportation.
    • Operational costs: Maintaining equipment, managing logistics, and ensuring workforce safety in a remote environment.
  • Profitability:
    • Analyze the estimated oil reserves and market prices to assess potential revenue.
    • Consider the cost of production, transportation, and processing to determine profitability.
    • Factor in potential tax incentives and government regulations.
  • Regulatory & Environmental Hurdles:
    • Environmental impact assessments: Meeting regulatory requirements for minimizing environmental impact.
    • Obtaining permits and licenses: Navigating the regulatory landscape for oil exploration and extraction.
    • Potential for environmental fines and penalties: Adhering to environmental regulations and mitigating risks.
  • Remote Location Challenges:
    • Logistics: Organizing transportation of equipment and personnel, managing supplies, and ensuring efficient communication.
    • Workforce: Attracting and retaining skilled workers, providing appropriate housing and facilities, and addressing potential safety concerns.

Opportunities:

  • Potential for significant oil reserves: The possibility of striking a large and profitable oil field.
  • Advancement in drilling technologies: Utilizing new techniques for efficient extraction in challenging environments.
  • Government incentives: Potential for tax breaks and other incentives for developing oil fields in remote locations.
  • Creating jobs and economic activity: Contributing to the local economy by creating jobs and fostering development.

Conclusion:

A thorough feasibility analysis will help determine the viability of this project by considering both technical and business aspects. While there are inherent risks and challenges, the potential for significant oil reserves and technological advancements offer opportunities for success. By carefully assessing the risks and opportunities, the company can make an informed decision regarding whether to pursue this project.


Books

  • "Petroleum Engineering: Principles and Practices" by Tarek Ahmed and John R. Bedrikovetsky: Provides comprehensive coverage of the technical aspects of oil and gas exploration and production, including detailed information on feasibility studies.
  • "The Economics of Oil and Gas: A Primer for the Non-specialist" by Robert Mabro: This book offers an accessible introduction to the economic principles and market dynamics influencing the oil and gas industry, crucial for understanding the business feasibility of projects.
  • "Project Management for Oil & Gas: A Practical Guide" by Simon Chadwick: This book covers the entire project management lifecycle, including the critical role of feasibility studies in the initial stages of oil and gas ventures.

Articles

  • "Feasibility Studies: A Guide to Oil and Gas Projects" by [Insert Author Name if applicable] - This article provides a detailed overview of the process of conducting feasibility studies in the oil and gas industry, including the key elements to consider and the importance of technical and economic assessments.
  • "Unconventional Oil & Gas: Feasibility Studies and Challenges" by [Insert Author Name if applicable] - This article delves into the specific challenges and considerations of feasibility studies for unconventional oil and gas projects, particularly those involving shale formations and other complex reservoirs.
  • "The Role of Technology in Enhancing Feasibility in Oil & Gas Projects" by [Insert Author Name if applicable] - This article examines the impact of technological advancements on the feasibility of oil and gas projects, highlighting the importance of utilizing innovative tools and techniques to overcome technical and economic hurdles.

Online Resources

  • SPE (Society of Petroleum Engineers): Their website offers a vast repository of articles, publications, and technical resources related to all aspects of the oil and gas industry, including feasibility studies and project management.
  • Oil & Gas Journal: This industry publication provides regular updates on news, research, and analysis related to oil and gas exploration, production, and technology, including insights on feasibility studies and current trends.
  • Energy Information Administration (EIA): This U.S. government agency offers extensive data and reports on energy production, consumption, and market trends, providing valuable insights into the economic viability of oil and gas projects.

Search Tips

  • Combine keywords: Use terms like "oil and gas feasibility study," "project feasibility assessment," "unconventional oil feasibility," or "offshore oil feasibility" to narrow down your search.
  • Specify year range: Adding a year range to your search (e.g., "oil and gas feasibility study 2015-2023") can help you find more relevant and up-to-date information.
  • Use filters: Utilize Google's search filters (e.g., "news," "scholar") to refine your results and focus on specific types of content.
  • Explore related websites: Once you find a few relevant resources, explore the websites of those organizations (e.g., SPE, Oil & Gas Journal) to discover additional content and related publications.

Techniques

Striking Gold or Digging a Dry Hole: Feasibility in Oil & Gas Projects

Chapter 1: Techniques

Feasibility studies in the oil and gas industry employ a range of techniques to assess both technical and business viability. These techniques often overlap and are used iteratively, refining the understanding of project feasibility as more data becomes available.

Technical Feasibility Techniques:

  • Geological and Geophysical Surveys: Seismic surveys, well logging, core analysis, and geological modeling are crucial for understanding subsurface formations, reservoir characteristics (porosity, permeability, hydrocarbon saturation), and potential risks (faults, pressure gradients). These techniques help determine if hydrocarbons are present and if they can be extracted economically.
  • Reservoir Simulation: Sophisticated software models simulate reservoir behavior under various extraction scenarios. This helps predict production rates, ultimate recovery, and the impact of different drilling and completion strategies.
  • Engineering Assessments: This involves evaluating the feasibility of drilling, completion, and production operations. Factors considered include well design, equipment selection (drilling rigs, pumps, pipelines), and environmental impact. Specific analyses might include wellbore stability assessments, flow assurance studies (to predict and mitigate issues like wax deposition or hydrate formation), and production optimization studies.
  • Environmental Impact Assessment (EIA): This is a critical step, evaluating the potential environmental consequences of the project and identifying mitigation strategies. It assesses impacts on air and water quality, flora and fauna, and potential risks of spills or accidents.
  • Risk Assessment: A thorough risk assessment identifies and quantifies potential technical challenges and uncertainties, such as equipment failure, geological surprises, and regulatory hurdles. This often employs probabilistic methods to estimate the likelihood and potential impact of these risks.

Business Feasibility Techniques:

  • Financial Modeling: This involves creating detailed financial models that project revenues, costs, and profitability over the project's lifespan. These models consider various scenarios, including variations in oil and gas prices, production rates, and operating costs. Key metrics include Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period.
  • Market Analysis: This involves assessing the demand for the extracted hydrocarbons, identifying potential buyers, and analyzing market prices and price volatility. This informs the revenue projections in the financial model.
  • Regulatory and Legal Analysis: This examines permits, licenses, and regulations relevant to the project. It ensures compliance and identifies potential delays or costs associated with regulatory approvals.
  • Sensitivity Analysis: This involves testing the sensitivity of the financial model to changes in key assumptions, such as oil prices, production rates, and capital expenditures. This helps identify critical uncertainties and their impact on the project's feasibility.

Chapter 2: Models

Several types of models are used in oil and gas feasibility studies. These models are interconnected and often feed data into one another:

  • Geological Models: 3D representations of subsurface geology, including rock properties, fluid distribution, and structural features. These are built using data from geophysical surveys and well logs.
  • Reservoir Simulation Models: Complex mathematical models that simulate the flow of fluids in the reservoir under various operating conditions. These are used to predict production rates, ultimate recovery, and the impact of different development strategies. Examples include compositional reservoir simulators and black oil simulators.
  • Financial Models: Spreadsheet-based or dedicated software models used to project revenues, costs, and profitability over the project's life cycle. These models often incorporate probabilistic elements to account for uncertainties in oil prices, production rates, and capital costs. Discounted cash flow (DCF) analysis is a common technique.
  • Economic Models: These models analyze the overall economic viability of the project, considering factors such as inflation, exchange rates, and government policies.
  • Environmental Models: These models predict the potential environmental impacts of the project, assisting in the EIA process.

Chapter 3: Software

A variety of specialized software is employed for oil and gas feasibility studies. Examples include:

  • Geophysical and Geological Modeling Software: Petrel (Schlumberger), Kingdom (IHS Markit), and SeisSpace (CGG) are widely used for processing and interpreting seismic data, building geological models, and creating 3D visualizations.
  • Reservoir Simulation Software: CMG (Computer Modelling Group), Eclipse (Schlumberger), and INTERSECT (Roxar) are industry-standard reservoir simulators used for predicting reservoir behavior and optimizing production strategies.
  • Financial Modeling Software: Spreadsheet software like Microsoft Excel is commonly used, often with specialized add-ins for financial analysis. Dedicated financial modeling software packages also exist.
  • Risk Assessment Software: Specialized software packages enable quantitative risk assessment, allowing for the simulation of various scenarios and the quantification of uncertainties.
  • Environmental Modeling Software: Specialized software is used to model the potential environmental impact of various aspects of the project.

Chapter 4: Best Practices

Effective feasibility studies follow best practices to ensure accuracy, reliability, and transparency:

  • Clearly Defined Scope and Objectives: A well-defined scope outlines the project's boundaries and objectives, specifying the aspects to be evaluated.
  • Comprehensive Data Collection: Thorough data gathering from various sources is essential, encompassing geological, geophysical, engineering, and economic data.
  • Robust Data Analysis: Rigorous statistical and analytical techniques are used to interpret data and account for uncertainty.
  • Independent Verification: Independent review by experts helps ensure the accuracy and reliability of the study's findings.
  • Transparent Reporting: Clear and concise reporting communicates the study's methodology, assumptions, and conclusions effectively.
  • Iterative Process: Feasibility studies are often iterative, with findings from early stages informing subsequent analysis and refining the understanding of project viability.
  • Scenario Planning: Exploring multiple scenarios (optimistic, pessimistic, and most likely) helps assess the project’s sensitivity to various factors.
  • Collaboration: Effective communication and collaboration between geologists, engineers, economists, and other stakeholders are crucial for a successful feasibility study.

Chapter 5: Case Studies

(This chapter would include several case studies illustrating successful and unsuccessful feasibility assessments in different oil and gas contexts. For example, one case study could focus on a successful unconventional shale gas project, another on a failed deepwater exploration venture, and a third on the feasibility assessment of a carbon capture and storage project. Each case study would highlight the key techniques, models, and considerations that led to the outcome.) Specific examples would require detailed research into publicly available case studies.

Comments


No Comments
POST COMMENT
captcha
Back