Project Planning & Scheduling

Fast Tracking

Fast Tracking: A Vital Tool in Accelerating Oil & Gas Projects

In the fast-paced world of oil and gas, time is money. Delays can translate to millions of dollars in lost revenue, not to mention the potential for missed opportunities. To overcome these challenges, project managers rely on various strategies, one of which is "fast tracking."

What is Fast Tracking?

Fast tracking is a project management technique that aims to reduce project duration by overlapping project phases that would traditionally be executed sequentially. This is achieved by converting "Finish-to-Start" (FS) dependencies into "Start-to-Start" (SS) dependencies, essentially allowing activities to begin before the preceding ones are fully complete.

How Fast Tracking Works in Oil & Gas:

Imagine building an oil platform. Traditionally, engineering would be completed before construction begins. However, with fast tracking, these phases can partially overlap. While detailed engineering is in progress, the foundation and initial structural elements could be ordered and fabricated, significantly reducing the overall project timeline.

Benefits of Fast Tracking:

  • Reduced project duration: This is the primary advantage, allowing projects to be delivered faster and generate revenue sooner.
  • Increased efficiency: Overlapping phases can optimize resource allocation, leading to better utilization of personnel and equipment.
  • Improved responsiveness: In a dynamic industry like oil and gas, fast tracking can help react to changing market conditions and capitalize on new opportunities.

Challenges of Fast Tracking:

  • Increased risk: Overlapping phases can introduce complexities and potential for increased risks if not carefully managed. For example, changes in engineering might necessitate rework during construction, leading to delays and cost overruns.
  • Coordination challenges: Managing multiple overlapping phases requires meticulous planning and coordination to ensure seamless transitions and minimize disruptions.
  • Communication breakdown: Clear communication channels are crucial to prevent miscommunications and ensure all stakeholders are aware of project progress and any potential changes.

Considerations for Implementing Fast Tracking:

  • Thorough risk assessment: Identify and evaluate potential risks associated with overlapping phases and develop mitigation strategies.
  • Detailed planning and scheduling: Develop a robust schedule that accounts for dependencies, potential delays, and resource availability.
  • Effective communication: Establish clear communication channels and procedures to ensure information flow between all stakeholders.
  • Experienced team: Fast tracking requires a skilled and experienced team capable of handling complex tasks and managing potential challenges.

Conclusion:

Fast tracking is a valuable tool in the oil and gas industry, allowing for faster project delivery and increased efficiency. However, it requires careful planning, risk mitigation, and strong communication to achieve its full potential and avoid potential pitfalls. With proper implementation, fast tracking can be a powerful weapon in the arsenal of project managers, allowing them to navigate the challenges of this demanding industry and achieve their goals.


Test Your Knowledge

Fast Tracking Quiz

Instructions: Choose the best answer for each question.

1. What is the primary goal of fast tracking in project management?

a) To increase the budget allocated to a project. b) To reduce the overall project duration. c) To improve the quality of project deliverables. d) To minimize the number of project stakeholders.

Answer

b) To reduce the overall project duration.

2. How does fast tracking achieve its goal of reducing project duration?

a) By using more advanced technology and equipment. b) By hiring more experienced project managers. c) By overlapping project phases that would typically be executed sequentially. d) By eliminating unnecessary project tasks.

Answer

c) By overlapping project phases that would typically be executed sequentially.

3. What is a major benefit of implementing fast tracking in an oil and gas project?

a) Reduced risk of project failure. b) Increased project complexity. c) Improved communication between stakeholders. d) Accelerated revenue generation.

Answer

d) Accelerated revenue generation.

4. What is a potential challenge associated with fast tracking?

a) Reduced need for skilled labor. b) Increased project costs. c) Decreased project scope. d) Enhanced stakeholder satisfaction.

Answer

b) Increased project costs.

5. What is crucial for successful implementation of fast tracking in a project?

a) Minimizing communication between stakeholders. b) Prioritizing project deadlines over quality. c) Thorough risk assessment and mitigation strategies. d) Relying solely on experienced project managers.

Answer

c) Thorough risk assessment and mitigation strategies.

Fast Tracking Exercise

Scenario: You are the project manager for the construction of a new offshore oil platform. The traditional project schedule allocates 12 months for engineering and 18 months for construction, totaling 30 months. Management wants to expedite the project and is considering fast tracking.

Task:

  1. Identify at least three project phases that could be partially overlapped to implement fast tracking.
  2. Explain the potential benefits and risks associated with overlapping these phases.
  3. Outline the steps you would take to mitigate the identified risks.

Exercice Correction

1. Overlappable Phases:

  • Engineering and Procurement: Early stages of engineering can be completed while procurement of long-lead items (e.g., large structural components) is initiated. This reduces the overall construction time.
  • Detailed Engineering and Construction Planning: Detailed engineering can be conducted concurrently with the initial stages of construction planning, allowing for a faster transition into the construction phase.
  • Construction and Subsea Installation: While some construction activities are underway, pre-installation work for subsea infrastructure (e.g., pipelines) can be started simultaneously, saving time during the final installation phase.

2. Benefits and Risks:

  • Benefits: Reduced project duration, early revenue generation, improved resource utilization.
  • Risks: Changes in engineering designs leading to rework during construction, delays in procurement, communication breakdowns, potential cost overruns.

3. Risk Mitigation Steps:

  • Thorough Risk Assessment: Identify potential risks in detail and assess their likelihood and impact.
  • Detailed Planning and Scheduling: Develop a robust schedule considering dependencies, potential delays, and resource availability.
  • Effective Communication: Establish clear communication channels and procedures between all stakeholders involved in overlapping phases.
  • Contingency Planning: Develop backup plans for potential delays in procurement or engineering changes.
  • Experienced Team: Ensure a skilled team with experience in managing fast-tracked projects and handling complexities.


Books

  • Project Management: A Systems Approach to Planning, Scheduling, and Controlling by Harold Kerzner: This book provides a comprehensive overview of project management principles, including fast tracking, with specific examples in various industries.
  • Fast Tracking Construction Projects: A Guide to Reducing Project Duration by John R. Graham: This book focuses on the practical application of fast tracking specifically in the construction industry, providing valuable insights for oil & gas projects.
  • The Lean Startup: How Today's Entrepreneurs Use Continuous Innovation to Create Radically Successful Businesses by Eric Ries: Although not directly related to oil & gas, this book discusses agile methodologies and the importance of continuous innovation, which can be applied to fast tracking and project management.

Articles

  • "Fast Tracking in Project Management" by Project Management Institute: This article provides a detailed explanation of fast tracking, its benefits, and potential challenges, along with best practices for implementation.
  • "Fast Tracking Oil & Gas Projects: A Practical Guide" by Oil & Gas Journal: This article discusses the specific challenges and opportunities of fast tracking in the oil and gas industry, focusing on practical strategies and case studies.
  • "Fast Tracking Project Management Techniques" by Harvard Business Review: This article explores the concept of fast tracking in a broader context, examining its advantages and drawbacks while offering insights for effective implementation.

Online Resources

  • Project Management Institute (PMI): This website offers various resources on project management, including articles, training materials, and certifications related to fast tracking.
  • Oil & Gas Journal (OGJ): This website provides industry-specific news, insights, and articles on various aspects of the oil and gas industry, including project management and fast tracking.
  • LinkedIn: This professional networking platform offers a wealth of information on fast tracking, including discussions, articles, and insights from experts in the field.

Search Tips

  • Use specific keywords: Combine keywords like "fast tracking," "oil & gas," "project management," and "case studies" to find relevant information.
  • Utilize advanced search operators: Use quotation marks for exact phrases ("fast tracking techniques"), minus (-) to exclude irrelevant results, and asterisks (*) for wildcard searches (e.g., "fast tracking * oil * gas").
  • Explore different file types: Use the "filetype" operator to narrow your search to specific file types like PDFs (.pdf) or presentations (.pptx) for more detailed information.

Techniques

Chapter 1: Techniques of Fast Tracking

Fast tracking is a project management technique that involves overlapping project phases to reduce the overall project duration. While it can be a powerful tool to accelerate oil and gas projects, it's essential to understand the various techniques involved:

1. Start-to-Start (SS) Dependencies:

  • This technique allows activities to start simultaneously, even if they have a dependency. For example, in an oil platform construction project, detailed engineering and foundation fabrication can start concurrently, even though the latter depends on the former for specifications.
  • This technique allows for parallel work and saves time but necessitates strong communication and coordination between teams working on dependent activities.

2. Finish-to-Start (FS) Dependencies:

  • This is the traditional approach where an activity must finish before the next activity can start.
  • This approach provides a sequential workflow and is often used in the early stages of a project, especially for critical activities like design and safety reviews.

3. Fast Tracking with Milestone-Based Planning:

  • This involves breaking down a project into smaller, more manageable phases with defined milestones. Each phase can be fast-tracked by overlapping with the following phase after meeting a specific milestone, allowing for continuous progress.
  • This technique requires strong communication and monitoring to ensure each milestone is met and the next phase can commence without delays.

4. Critical Path Method (CPM):

  • This technique identifies the critical activities that directly affect the project's completion date.
  • By focusing on the critical path and fast-tracking these activities, the overall project duration can be significantly reduced.

5. Parallel Processing:

  • This involves dividing large activities into smaller, independent tasks that can be performed simultaneously.
  • For instance, in an oil drilling project, parallel processing can be applied to different phases like well preparation, rig setup, and initial drilling operations, reducing the overall time required.

6. Resource Allocation and Optimization:

  • Fast tracking often requires adjustments in resource allocation to ensure sufficient manpower and equipment for overlapping activities. This might involve hiring additional personnel or adjusting resource allocation strategies.

7. Technology Integration:

  • Utilizing advanced technologies like cloud-based platforms, BIM software, and digital twins can streamline communication, data sharing, and collaboration, facilitating faster decision-making and reducing project delays.

8. Risk Management:

  • Implementing a robust risk management plan is critical in fast-tracking projects. This involves identifying potential risks, developing mitigation strategies, and closely monitoring the project throughout its execution.

In essence, successful fast-tracking requires a blend of these techniques, tailored to the specific project context. It's crucial to carefully select the appropriate techniques to optimize project acceleration while minimizing risks and ensuring quality.

Similar Terms
Instrumentation & Control EngineeringDrilling & Well CompletionReservoir EngineeringProject Planning & SchedulingData Management & Analytics
  • Tracking Tracking in Oil & Gas: Keepin…
Most Viewed
Categories

Comments


No Comments
POST COMMENT
captcha
Back