In the oil and gas industry, well workovers are essential for maintaining production and extending the lifespan of wells. One crucial aspect of these workovers involves the manipulation of sucker rod pumping systems, and a key term in this process is "tailing rods."
What are Tailing Rods?
Tailing rods are essentially the bottom portion of the sucker rod string, which is left in the well during a workover. While the majority of the rod string is pulled up to the surface for inspection and repair, these "tailed" rods remain in the wellbore, acting as a critical anchor for the newly installed rods.
The Act of Tailing: A Precise Process
The act of tailing rods involves a series of carefully coordinated steps during the workover:
Benefits of Tailing Rods:
Understanding Tailing Rods: A Key to Efficient Well Workovers
The process of tailing rods is a complex but critical part of well workovers. This technique allows oil and gas operators to optimize production while minimizing downtime and associated costs. By understanding the purpose and procedures related to tailing rods, professionals can ensure efficient and effective well maintenance, contributing to the sustainable development of oil and gas resources.
Instructions: Choose the best answer for each question.
1. What is the primary purpose of tailing rods during a well workover? (a) To provide a stable anchor for the newly installed sucker rod string. (b) To prevent the sucker rod string from corroding. (c) To lubricate the sucker rod string during operation. (d) To increase the pumping capacity of the well.
(a) To provide a stable anchor for the newly installed sucker rod string.
2. Which of the following is NOT a step involved in the process of tailing rods? (a) Rod string retrieval from the well. (b) Inspection and repair of the pulled rods. (c) Installation of a new pump at the bottom of the well. (d) Connecting the new rods to the remaining tailing rods.
(c) Installation of a new pump at the bottom of the well.
3. What is a major benefit of using tailing rods during workovers? (a) Reduced cost and time associated with the workover. (b) Increased risk of damage to the wellbore. (c) Reduced pumping capacity of the well. (d) Increased environmental impact of the workover.
(a) Reduced cost and time associated with the workover.
4. Why is the "tailing point" carefully chosen during a workover? (a) To ensure the new rod string is securely connected. (b) To prevent corrosion of the tailing rods. (c) To maximize the production rate of the well. (d) To minimize the environmental impact of the workover.
(a) To ensure the new rod string is securely connected.
5. What is the primary function of the tailing rods in a well after the workover is completed? (a) To act as a weight to increase pumping efficiency. (b) To act as a guide for the newly installed rods. (c) To prevent the sucker rod string from being pulled out of the well. (d) To reduce the risk of corrosion in the wellbore.
(c) To prevent the sucker rod string from being pulled out of the well.
Scenario:
A well has been producing oil for several years and requires a workover. The current sucker rod string is 4,000 feet long. Inspection has revealed that the top 2,000 feet of the rod string needs to be replaced.
Task:
**1. Determining the Tailing Point:** The logical choice would be to leave the bottom 2,000 feet of the rod string in place as the tailing rods. This ensures: * **Minimal rod string replacement**: Only the top half requires replacement. * **Optimal anchor**: The existing rods provide a strong base for the new installation. **2. Potential Challenges:** * **Rod string condition:** The bottom section of the rod string needs to be assessed to ensure it's in good condition to support the new installation. * **Wellbore conditions:** Potential issues like corrosion, scaling, or obstructions in the lower portion of the wellbore could hinder the process. * **Connecting the new rods:** Ensuring a secure and proper connection between the new and old rod strings is crucial for preventing failures. **3. Steps Involved:** 1. **Rod string retrieval:** The top 2,000 feet of the existing rod string would be pulled from the well. 2. **Inspection and repair:** The retrieved rods would be thoroughly inspected for wear and tear. Damaged sections would be replaced. 3. **Connection:** The newly installed rods would be connected to the remaining tailing rods at the 2,000-foot depth. 4. **Lowering the string:** The connected rod string would be carefully lowered back into the well, ensuring proper tension and alignment. 5. **Pumping system check:** Once the new rod string is installed, the pumping system would be thoroughly checked and tested for proper operation.
Comments