Drilling & Well Completion

Drill Out

Drilling Out: A Vital Step in Well Completion

In the oil and gas industry, drilling out is a crucial step in the well completion process. It involves drilling through the previously placed cement after a primary cement job, as the wellbore is deepened. This process is essential for several reasons, including:

1. Accessing Deeper Reservoir Zones: Drilling out allows access to deeper reservoir zones that may contain valuable hydrocarbons. After the primary cement job, the wellbore is typically sealed with cement to prevent fluid migration and ensure the integrity of the well. However, to access deeper zones, this cement must be removed.

2. Setting Production Casing: Drilling out is also necessary to set production casing, which is used to line the wellbore and provide structural support for the production of hydrocarbons. The production casing is typically set below the primary cement job, and drilling out allows for its proper installation.

3. Installing Production Tubing: Similar to casing, drilling out is essential for installing production tubing, which is used to transport hydrocarbons from the reservoir to the surface.

4. Completing Specific Well Designs: Certain well designs require the removal of cement to install specific completion equipment or to achieve specific wellbore configurations.

The Process:

Drilling out is typically performed using specialized drilling tools designed to cut through the cement. This process can be challenging due to the strength and hardness of cement. Several methods are employed, including:

  • Rotary Drilling: Traditional rotary drilling methods with diamond-tipped drill bits are often used.
  • Jetting: High-pressure jets of water or a mixture of water and abrasive material can be used to break down the cement.
  • Mechanical Milling: Special milling tools are used to cut through the cement.
  • Chemical Methods: In some cases, chemical solutions are used to soften or dissolve the cement.

Factors Affecting Drilling Out:

The success of drilling out depends on several factors, including:

  • Cement Quality: The strength and hardness of the cement significantly impact the drilling process.
  • Cement Thickness: A thicker cement layer requires more time and effort to drill through.
  • Wellbore Diameter: A narrower wellbore can make drilling out more challenging.
  • Drilling Tools: The type and quality of drilling tools used play a vital role in the efficiency and effectiveness of the process.

Risks and Challenges:

Drilling out presents certain risks and challenges:

  • Stuck Drill Pipe: Drill pipe can become stuck in the cement, requiring special techniques to free it.
  • Damage to Wellbore: Improper drilling techniques can damage the wellbore, leading to leaks and other problems.
  • Lost Circulation: Fluid used during drilling can be lost into the surrounding formations, potentially compromising the integrity of the well.
  • Well Control Issues: Drilling out can lead to well control issues if not managed properly.

Conclusion:

Drilling out is an essential part of well completion, allowing access to deeper reservoir zones and enabling the installation of production equipment. The process requires specialized tools and techniques to ensure efficiency and safety. Understanding the factors that influence drilling out and the potential risks involved is crucial for successful well completion operations.


Test Your Knowledge

Drilling Out Quiz

Instructions: Choose the best answer for each question.

1. What is the primary purpose of drilling out in well completion?

a) To remove the drilling mud from the wellbore. b) To access deeper reservoir zones. c) To prevent fluid migration. d) To solidify the wellbore.

Answer

b) To access deeper reservoir zones.

2. Which of the following is NOT a common method used for drilling out cement?

a) Rotary Drilling b) Jetting c) Hydraulic Fracturing d) Mechanical Milling

Answer

c) Hydraulic Fracturing

3. Which of the following factors significantly impacts the drilling out process?

a) The size of the drilling rig. b) The weather conditions. c) The type of drilling fluid used. d) The thickness of the cement layer.

Answer

d) The thickness of the cement layer.

4. What is a potential risk associated with drilling out?

a) Increased oil production. b) Stuck drill pipe. c) Decreased wellbore pressure. d) Improved cement quality.

Answer

b) Stuck drill pipe.

5. Why is drilling out considered a crucial step in well completion?

a) It allows for the installation of production equipment. b) It helps to prevent wellbore collapse. c) It reduces the risk of fluid contamination. d) It improves the efficiency of drilling operations.

Answer

a) It allows for the installation of production equipment.

Drilling Out Exercise

Scenario:

You are working on a well completion project where you need to drill out 10 meters of cement to access a deeper reservoir zone. The cement was placed during the primary cement job and has a thickness of 5 meters. The wellbore diameter is 12 inches. You are using a rotary drilling method with diamond-tipped drill bits.

Task:

Based on the provided information, outline a plan for drilling out the cement. Consider the following aspects:

  • Drilling tools and techniques: What type of drill bit would you use? What drilling speed and weight would you recommend?
  • Safety precautions: What safety measures would you implement during the drilling out process?
  • Potential challenges: What potential challenges might you face during this operation?
  • Monitoring and evaluation: What parameters would you monitor during the process? How would you evaluate the success of the drilling out operation?

Exercice Correction

Here's a sample plan for drilling out the cement:

1. Drilling Tools and Techniques:

  • Drill Bit: Choose a diamond-tipped drill bit specifically designed for cement drilling. The bit size should be appropriate for the wellbore diameter (12 inches).
  • Drilling Speed and Weight: Start with a relatively low drilling speed and weight, gradually increasing them as the drill bit penetrates the cement. Constant monitoring is crucial to avoid excessive wear on the bit and potential stuck pipe issues.

2. Safety Precautions:

  • Proper PPE: Ensure all personnel involved are wearing appropriate personal protective equipment (PPE), including hard hats, safety glasses, gloves, and steel-toe boots.
  • Well Control: Maintain strict well control procedures throughout the operation. Ensure proper pressure management and have backup equipment ready in case of emergencies.
  • Communication: Establish clear communication channels between the drilling crew and the wellsite supervisor.
  • Emergency Response: Ensure emergency response teams are on standby and are fully equipped to handle any unexpected situations.

3. Potential Challenges:

  • Stuck Drill Pipe: The cement can be very hard, increasing the risk of the drill pipe getting stuck. Use a combination of appropriate drilling techniques, torque management, and specialized tools to mitigate this risk.
  • Damage to Wellbore: Improper drilling techniques can damage the wellbore, causing leaks and other problems. Ensure the drilling speed and weight are carefully controlled to minimize the risk of damage.
  • Lost Circulation: Fluid used during drilling can be lost into the surrounding formations. Implement measures to control fluid loss and monitor the wellbore pressure closely.

4. Monitoring and Evaluation:

  • Drilling Rate: Monitor the drilling rate to assess the effectiveness of the drilling process.
  • Torque and Weight: Track the torque and weight applied to the drill string to identify any potential issues with the drill bit or wellbore.
  • Fluid Loss: Carefully monitor the drilling fluid volume and pressure to detect any signs of fluid loss.
  • Visual Inspection: After drilling out a section, visually inspect the wellbore to ensure the cement has been successfully removed.

Success Evaluation:

The drilling out operation is successful when the entire 10 meters of cement is successfully removed, the wellbore is free of debris and damage, and all safety protocols have been adhered to.


Books

  • "Petroleum Engineering: Drilling and Well Completion" by T.P. Caudle, J.C. Bowman, and G.E. King (This comprehensive text covers drilling operations and well completion, including drilling out sections).
  • "Well Completion Design and Operations" by John L. Thompson (This book provides detailed information on various well completion techniques, including drilling out).
  • "Drilling Engineering: A Complete Well Construction Manual" by Robert E. Krueger (This manual offers a detailed understanding of drilling operations, including techniques for drilling out cement).

Articles

  • "Drilling Out Operations in the Oil and Gas Industry" by Society of Petroleum Engineers (SPE) (Search for this article on SPE's website or through online databases. It provides a technical overview of drilling out procedures).
  • "Drilling Out Cement: A Practical Guide" by Oil and Gas Journal (This article provides practical insights into drilling out cement, including techniques and best practices).
  • "Cement Removal in Well Completion: A Review" by International Journal of Oil, Gas and Coal Technology (This journal article discusses various cement removal methods employed in well completion, including drilling out).

Online Resources

  • Society of Petroleum Engineers (SPE): (https://www.spe.org/) SPE's website provides a wealth of information, resources, and articles related to drilling and well completion.
  • Oil and Gas Journal (OGJ): (https://www.ogj.com/) OGJ offers industry news, articles, and technical information related to oil and gas operations, including drilling out techniques.
  • Schlumberger: (https://www.slb.com/) Schlumberger, a major oilfield service company, provides technical information and resources on well completion and cement removal techniques.

Search Tips

  • Use specific keywords: "drilling out cement," "well completion drilling out," "cement removal well completion."
  • Combine keywords with "PDF" to find downloadable documents.
  • Use advanced search operators like "+" to include specific words in the search, "-" to exclude words, and "site:" to restrict results to specific websites.

Techniques

Similar Terms
Drilling & Well Completion
Quality Control & Inspection
Safety Training & Awareness
  • Ball-Out Balling Out: A Critical Techn…
Incident Investigation & Reporting
  • Blowout Blowout: When Wells Run Amok …
Most Viewed

Comments

No Comments
POST COMMENT
captcha
Back