Building the Path: Understanding the Buid Section in Oil & Gas

In the world of oil and gas exploration, reaching the target reservoir isn't always a straight shot. Navigating through complex geological formations often requires maneuvering the wellbore, a process known as directional drilling. A key component of this process is the Buid Section, a crucial segment of the wellbore where the trajectory gradually changes, often to reach a specific target or navigate challenging geological formations.

What is a Buid Section?

The Buid Section is simply the part of the wellbore where the deviation angle, or the angle between the wellbore and the vertical, increases. This "building" process is carefully controlled by experienced drilling engineers using various technologies and techniques. The buid section is crucial for several reasons:

  • Reaching Targets: In many cases, the target reservoir is located at a significant distance from the surface and at an angle to the vertical. The Buid Section helps the wellbore reach this target by gradually increasing the deviation angle.
  • Avoiding Obstacles: Geological formations can be complex, with faults, fractures, and other potential obstacles. The Buid Section allows for a controlled deviation to circumvent these obstacles and reach the target zone safely and efficiently.
  • Optimizing Production: By directing the wellbore towards the reservoir at a strategic angle, production can be maximized by accessing the most productive areas of the reservoir.

Key Considerations:

  • Angle of Buid: The rate at which the wellbore deviates is crucial. It is carefully determined based on factors such as the target depth, geological formations, and available drilling equipment.
  • Wellbore Trajectory: The Buid Section is part of a carefully planned wellbore trajectory, which outlines the entire path of the wellbore from the surface to the target reservoir.
  • Downhole Tools: Specialized tools like mud motors and steerable assemblies are used to control the direction of the wellbore and ensure accurate building of the deviation angle.

Understanding the Buid Section is crucial for understanding the intricacies of directional drilling and its role in successful oil and gas exploration. It is a testament to the ingenuity and precision of drilling engineers who navigate complex geological formations with meticulous planning and sophisticated technology.


Test Your Knowledge

Quiz: Building the Path - Understanding the Buid Section

Instructions: Choose the best answer for each question.

1. What is the primary purpose of the Buid Section in directional drilling?

a) To maintain a straight wellbore path. b) To gradually increase the deviation angle of the wellbore. c) To decrease the deviation angle of the wellbore. d) To stabilize the wellbore pressure.

Answer

b) To gradually increase the deviation angle of the wellbore.

2. Which of the following is NOT a reason why a Buid Section is used in directional drilling?

a) Reaching targets located at a distance and angle from the surface. b) Avoiding geological obstacles like faults and fractures. c) Maximizing production by strategically directing the wellbore. d) Minimizing the cost of drilling operations.

Answer

d) Minimizing the cost of drilling operations.

3. What factor is crucial in determining the rate of deviation in the Buid Section?

a) The weight of the drilling mud. b) The type of drilling fluid used. c) The angle of the target reservoir. d) The diameter of the wellbore.

Answer

c) The angle of the target reservoir.

4. Which of the following tools is commonly used to control the direction of the wellbore during the Buid Section?

a) Drill bit. b) Mud motor. c) Drilling rig. d) Blowout preventer.

Answer

b) Mud motor.

5. The Buid Section is a part of a larger plan known as the:

a) Wellbore design. b) Drilling schedule. c) Production plan. d) Wellbore trajectory.

Answer

d) Wellbore trajectory.

Exercise: Buid Section Design

Scenario: An oil company is planning to drill a well to reach a reservoir located 2,000 meters below the surface and at an angle of 45 degrees from the vertical. The initial wellbore is vertical.

Task:

  1. Calculate the total length of the Buid Section: Assuming a constant build rate of 2 degrees per 100 meters, calculate the length of the Buid Section needed to reach the target angle.
  2. Sketch a simple diagram: Draw a rough representation of the wellbore trajectory, showing the vertical section, the Buid Section, and the target reservoir.

Note: This is a simplified exercise. In real-world scenarios, various factors like geological formations and drilling equipment capabilities would be considered.

Exercice Correction

1. **Calculation:** - The deviation angle to be achieved is 45 degrees. - The build rate is 2 degrees per 100 meters. - Therefore, the length of the Buid Section would be 45 degrees / (2 degrees/100 meters) = 2250 meters. 2. **Diagram:** - Draw a vertical line representing the initial wellbore. - From the bottom of the vertical line, draw a slanted line at 45 degrees, representing the final wellbore path to the target reservoir. - The space between the vertical line and the slanted line represents the Buid Section.


Books

  • "Directional Drilling: Principles, Practices, and Applications" by Robert F. Mitchell and William E. Williams (This book provides a comprehensive overview of directional drilling and includes detailed sections on wellbore trajectory design, including buid sections).
  • "Petroleum Engineering Handbook" by Society of Petroleum Engineers (This handbook covers a wide range of topics in petroleum engineering, including directional drilling and wellbore design, providing valuable insights into the role of buid sections).
  • "Well Planning & Design" by John Lee and Donald R. Butler (This book focuses on the planning and design aspects of well construction, including detailed information on buid sections, wellbore trajectory, and associated tools).

Articles

  • "Directional Drilling: A Review" by A. K. Verma and A. K. Singh (This article provides a review of directional drilling technologies and their applications, touching on the importance of buid sections).
  • "Designing and Executing a Wellbore Trajectory: A Case Study" by (Search for specific case studies related to directional drilling and wellbore design in industry journals like SPE Journal or Journal of Petroleum Technology).
  • "Advanced Drilling Techniques for Challenging Reservoirs" (Search for articles discussing advanced drilling techniques such as underbalanced drilling, horizontal drilling, and multilateral wells, which often involve complex buid sections).

Online Resources

  • Society of Petroleum Engineers (SPE): https://www.spe.org/ (The SPE website offers access to a wealth of technical publications, conference proceedings, and online courses related to directional drilling and wellbore design).
  • Schlumberger: https://www.slb.com/ (Schlumberger's website provides technical information on various oilfield services, including directional drilling, wellbore trajectory, and downhole tools used for buid sections).
  • Halliburton: https://www.halliburton.com/ (Halliburton's website offers a similar range of information on directional drilling and related technologies, including buid sections).

Search Tips

  • Use specific keywords: Combine keywords like "build section," "buid section," "directional drilling," "wellbore trajectory," "wellbore design," and "oil and gas."
  • Include relevant terms: Add terms related to specific applications, drilling techniques, or downhole tools used in buid sections.
  • Search for case studies: Search for "buid section case study" to find examples of real-world applications and challenges related to this concept.
  • Use quotation marks: Place keywords in quotation marks to find exact matches and specific phrases related to buid sections.

Techniques

Similar Terms
Geology & Exploration
Most Viewed
Categories

Comments


No Comments
POST COMMENT
captcha
Back