In the world of oil and gas exploration, reaching the target reservoir isn't always a straight shot. Navigating through complex geological formations often requires maneuvering the wellbore, a process known as directional drilling. A key component of this process is the Buid Section, a crucial segment of the wellbore where the trajectory gradually changes, often to reach a specific target or navigate challenging geological formations.
What is a Buid Section?
The Buid Section is simply the part of the wellbore where the deviation angle, or the angle between the wellbore and the vertical, increases. This "building" process is carefully controlled by experienced drilling engineers using various technologies and techniques. The buid section is crucial for several reasons:
Key Considerations:
Understanding the Buid Section is crucial for understanding the intricacies of directional drilling and its role in successful oil and gas exploration. It is a testament to the ingenuity and precision of drilling engineers who navigate complex geological formations with meticulous planning and sophisticated technology.
Instructions: Choose the best answer for each question.
1. What is the primary purpose of the Buid Section in directional drilling?
a) To maintain a straight wellbore path. b) To gradually increase the deviation angle of the wellbore. c) To decrease the deviation angle of the wellbore. d) To stabilize the wellbore pressure.
b) To gradually increase the deviation angle of the wellbore.
2. Which of the following is NOT a reason why a Buid Section is used in directional drilling?
a) Reaching targets located at a distance and angle from the surface. b) Avoiding geological obstacles like faults and fractures. c) Maximizing production by strategically directing the wellbore. d) Minimizing the cost of drilling operations.
d) Minimizing the cost of drilling operations.
3. What factor is crucial in determining the rate of deviation in the Buid Section?
a) The weight of the drilling mud. b) The type of drilling fluid used. c) The angle of the target reservoir. d) The diameter of the wellbore.
c) The angle of the target reservoir.
4. Which of the following tools is commonly used to control the direction of the wellbore during the Buid Section?
a) Drill bit. b) Mud motor. c) Drilling rig. d) Blowout preventer.
b) Mud motor.
5. The Buid Section is a part of a larger plan known as the:
a) Wellbore design. b) Drilling schedule. c) Production plan. d) Wellbore trajectory.
d) Wellbore trajectory.
Scenario: An oil company is planning to drill a well to reach a reservoir located 2,000 meters below the surface and at an angle of 45 degrees from the vertical. The initial wellbore is vertical.
Task:
Note: This is a simplified exercise. In real-world scenarios, various factors like geological formations and drilling equipment capabilities would be considered.
1. **Calculation:** - The deviation angle to be achieved is 45 degrees. - The build rate is 2 degrees per 100 meters. - Therefore, the length of the Buid Section would be 45 degrees / (2 degrees/100 meters) = 2250 meters. 2. **Diagram:** - Draw a vertical line representing the initial wellbore. - From the bottom of the vertical line, draw a slanted line at 45 degrees, representing the final wellbore path to the target reservoir. - The space between the vertical line and the slanted line represents the Buid Section.