Setting Back the Pipe: A Crucial Step in Drilling and Well Completion

In the world of oil and gas exploration, the phrase "setting back the pipe" refers to a specific and crucial maneuver in drilling and workover operations. It involves carefully placing stands of drill pipe and drill collars in a vertical position to one side of the rotary table, located in the derrick or mast of the drilling rig. This process is essential for various reasons, primarily to facilitate efficient and safe handling of the drilling string.

Understanding the Importance of Setting Back the Pipe:

  • Enhanced Safety: By positioning the pipe off-center, the drill crew can safely maneuver it while connecting or disconnecting stands, reducing the risk of accidents caused by the weight of the pipe and the potential for entanglement.
  • Efficient Handling: Setting back the pipe allows for easier access to the stands for inspection, cleaning, and maintenance. This streamlines the entire drilling process, minimizing downtime and increasing overall efficiency.
  • Optimizing Space: Keeping the pipe out of the center of the rotary table provides valuable space for other equipment and personnel to operate, making the work area more organized and productive.

The Process of Setting Back the Pipe:

  1. Disconnecting the Stand: The stand of drill pipe or drill collars is disconnected from the bottom of the drill string.
  2. Raising the Stand: The stand is lifted vertically using the rig's hoisting system.
  3. Moving the Stand: The stand is moved laterally to the desired position alongside the rotary table.
  4. Lowering the Stand: The stand is carefully lowered into the designated location, ensuring a stable and secure position.

Lay Down Pipe: A Complementary Maneuver

While setting back the pipe is primarily related to handling the drill string, "laying down pipe" is another important technique in drilling operations. Laying down pipe involves placing stands of pipe horizontally on the rig floor, typically in a designated area called the "pipe rack."

Here's how laying down pipe differs from setting back the pipe:

  • Orientation: Laying down pipe involves a horizontal orientation, while setting back the pipe is done in a vertical position.
  • Purpose: Laying down pipe primarily serves as a storage method for unused pipe, while setting back the pipe is a crucial part of handling and managing the drill string during active drilling operations.

Conclusion:

Both setting back the pipe and laying down pipe are vital techniques in drilling and well completion operations. Setting back the pipe ensures efficient and safe handling of the drill string, allowing for seamless and uninterrupted drilling operations. Laying down pipe, on the other hand, provides a structured and organized storage solution for unused pipe, optimizing space and promoting order on the rig floor.


Test Your Knowledge

Quiz: Setting Back the Pipe

Instructions: Choose the best answer for each question.

1. What is the primary reason for setting back the pipe?

a) To increase the drilling speed. b) To store unused pipe. c) To facilitate safe and efficient handling of the drill string. d) To reduce the risk of pipe corrosion.

Answer

c) To facilitate safe and efficient handling of the drill string.

2. What is the position of the pipe when it is set back?

a) Horizontal, on the rig floor. b) Vertical, in the center of the rotary table. c) Vertical, to one side of the rotary table. d) Diagonal, resting against the derrick.

Answer

c) Vertical, to one side of the rotary table.

3. Which of these actions is NOT involved in setting back the pipe?

a) Disconnecting the stand from the drill string. b) Lifting the stand vertically. c) Lowering the stand into the designated location. d) Replacing the drill bit.

Answer

d) Replacing the drill bit.

4. How does setting back the pipe improve safety?

a) By preventing the pipe from falling into the wellbore. b) By making the pipe lighter and easier to handle. c) By reducing the risk of entanglement or accidents caused by the weight of the pipe. d) By increasing the visibility of the pipe during operations.

Answer

c) By reducing the risk of entanglement or accidents caused by the weight of the pipe.

5. Which of these maneuvers is complementary to setting back the pipe?

a) Tripping out the drill string. b) Laying down pipe. c) Rotating the drill string. d) Injecting drilling mud.

Answer

b) Laying down pipe.

Exercise: Setting Back the Pipe Scenario

Scenario: You are the driller on a drilling rig. You have just pulled a stand of drill pipe from the wellbore and are ready to set it back for inspection. The drill floor is crowded with equipment and personnel.

Task:

  1. Describe the steps involved in setting back the stand of pipe, considering the safety and efficiency of the operation.
  2. Explain how you would ensure the safe and efficient handling of the stand, taking into account the crowded conditions on the drill floor.

Exercise Correction

**Steps Involved in Setting Back the Pipe:** 1. **Communication:** Inform the crew about the intention to set back the pipe, ensuring everyone is aware of the operation and their roles. 2. **Clear the Area:** Direct personnel and equipment to a safe distance from the area where the stand will be set back. 3. **Disconnect the Stand:** Carefully disconnect the stand from the bottom of the drill string, using the proper tools and safety procedures. 4. **Hoisting:** Use the rig's hoisting system to lift the stand vertically, ensuring it is clear of the rig floor and any obstacles. 5. **Lateral Movement:** Maneuver the stand laterally to the desired position, ensuring it is clear of other equipment and personnel. 6. **Lowering:** Carefully lower the stand to the designated location, ensuring a stable and secure position. **Ensuring Safe and Efficient Handling:** * **Clear Communication:** Constant communication between the driller and the crew is essential to coordinate movements, avoiding accidents and ensuring efficiency. * **Proper Tool Usage:** Ensure all tools and equipment are in good working order and used according to safety guidelines. * **Rig Safety Rules:** Enforce all rig safety rules, including appropriate personal protective equipment (PPE) and designated work zones. * **Obstacle Awareness:** Maintain constant awareness of the surrounding environment, including equipment, personnel, and potential hazards. * **Double-Check:** After each step, double-check that the pipe is secured and positioned correctly.


Books

  • "Drilling Engineering" by John C. Wilson: A comprehensive textbook covering all aspects of drilling engineering, including detailed explanations of various rig operations, including setting back the pipe.
  • "Petroleum Engineering Handbook" edited by Gerhart H. F. Rieke: This comprehensive handbook offers a deep dive into various aspects of petroleum engineering, with sections on drilling and well completion that cover setting back the pipe and related procedures.

Articles

  • "Drilling Rig Operations: A Practical Guide" by [Author Name]: This practical guide, available in industry journals or online, provides step-by-step instructions on setting back the pipe, highlighting safety precautions and best practices.
  • "Drilling and Completion: A Technical Overview" by [Author Name]: This technical article, possibly published in a professional society journal or an oil and gas publication, can provide a comprehensive understanding of the process and its significance in drilling operations.

Online Resources

  • Society of Petroleum Engineers (SPE) website: The SPE website provides access to various technical papers, articles, and presentations related to drilling operations. Search for "setting back the pipe" or related keywords on their website.
  • Oil & Gas IQ: This platform offers news, technical articles, and industry insights related to oil and gas exploration and production, which may cover topics like setting back the pipe.
  • Drillinginfo: This comprehensive resource provides data and analytics for the oil and gas industry, including drilling operations. You might find relevant information about setting back the pipe in their research reports or data dashboards.

Search Tips

  • Use specific keywords: When searching on Google, use specific keywords like "setting back the pipe," "drilling rig operations," "pipe handling procedures," or "drilling equipment."
  • Combine keywords: Use combinations like "setting back the pipe AND safety" or "setting back the pipe AND best practices" to narrow your search.
  • Include relevant website names: For example, search for "setting back the pipe SPE website" or "setting back the pipe Oil & Gas IQ."

Techniques

Similar Terms
Asset Integrity Management
  • Assets Assets in Oil & Gas: The Back…
General Technical TermsDrilling & Well CompletionHSE Management Systems
  • Backbite Backbite: A Silent Threat in …
Contract & Scope ManagementOil & Gas ProcessingReservoir EngineeringSafety Training & AwarenessPiping & Pipeline EngineeringOil & Gas Specific TermsInstrumentation & Control Engineering
Most Viewed
Categories

Comments


No Comments
POST COMMENT
captcha
Back