Drilling & Well Completion

drilling out

Drilling Out: Removing Cement for Well Completion

Drilling out is a critical step in the oil and gas well completion process. It involves removing the cement that was previously placed around the casing to ensure a strong and stable wellbore. This procedure allows for the installation of downhole equipment and the initiation of production.

The Process:

  1. Cement Placement: During the initial well construction, cement is pumped into the annulus (space between the casing and the wellbore) to isolate various zones and provide structural integrity. This cement sheath protects the casing and prevents unwanted fluid flow.
  2. Drilling Out Initiation: Once the cement has set and cured, the drilling out process begins. A specialized drilling assembly, often incorporating a "cement mill" or other cutting tools, is lowered downhole.
  3. Cement Removal: The drilling assembly, with its rotating cutting action, grinds and removes the cement, creating a pathway for subsequent operations. The process continues until the desired depth is reached and the cement is completely removed from the casing.
  4. Verification and Inspection: After drilling out, the wellbore is inspected to confirm complete removal of the cement and ensure the integrity of the casing. This may involve logging tools or visual inspection using cameras.

Types of Drilling Out:

  • Primary Cementing: This refers to the initial removal of cement after the casing has been set in place. It is essential for connecting the production tubing to the wellbore.
  • Secondary Cementing: Sometimes, additional cement is placed in the wellbore after the initial cementing. This may be done for various reasons, like isolating zones or repairing damaged sections. Drilling out the secondary cement allows for further well interventions.

Importance of Drilling Out:

  • Enables Completion Operations: Drilling out removes the cement barrier, allowing for the installation of production tubing, packers, and other downhole equipment.
  • Ensures Production: By creating a clear pathway, drilling out enables the flow of hydrocarbons to the surface for production.
  • Prevents Wellbore Damage: Effective cement removal ensures the integrity of the casing, preventing potential leaks or wellbore damage.

Challenges and Risks:

  • Cement Removal Efficiency: Uneven cement removal can lead to obstructions or damage to downhole equipment.
  • Casing Integrity: The drilling out process can potentially damage the casing if not performed carefully.
  • Formation Damage: The drilling operation can cause formation damage, reducing the well's productivity.

Conclusion:

Drilling out is a crucial and complex stage in oil and gas well completion. It requires meticulous planning and execution to ensure successful removal of cement, enabling subsequent operations and optimizing well production. Understanding the process and associated challenges helps ensure efficient and safe well completion activities.


Test Your Knowledge

Drilling Out Quiz

Instructions: Choose the best answer for each question.

1. What is the primary purpose of drilling out in well completion? a) To install the casing. b) To remove cement surrounding the casing. c) To stimulate the reservoir. d) To isolate different zones in the wellbore.

Answer

b) To remove cement surrounding the casing.

2. Which of the following is NOT a type of drilling out? a) Primary cementing b) Secondary cementing c) Tertiary cementing d) None of the above

Answer

c) Tertiary cementing

3. What is the main reason for drilling out primary cement? a) To isolate different zones in the wellbore. b) To connect the production tubing to the wellbore. c) To repair damaged sections of the casing. d) To increase the well's production rate.

Answer

b) To connect the production tubing to the wellbore.

4. What is a potential challenge associated with drilling out? a) Uneven cement removal b) Damage to the casing c) Formation damage d) All of the above

Answer

d) All of the above

5. Why is it important to ensure complete removal of cement during drilling out? a) To prevent leaks and wellbore damage b) To optimize well production c) To allow for the installation of downhole equipment d) All of the above

Answer

d) All of the above

Drilling Out Exercise

Scenario: You are the well completion engineer responsible for drilling out the cement after a primary cementing operation. You have encountered difficulty removing the cement in a specific section of the wellbore.

Task:

  1. Identify at least three potential reasons why you might be having difficulty removing the cement in this specific section.
  2. Suggest three possible solutions to address the issue.

Exercice Correction

**Possible Reasons for Difficulty Removing Cement:** 1. **Uneven Cement Placement:** The cement may have been unevenly placed during the initial cementing operation, creating a thicker layer in the problematic section. 2. **Cement Hardening:** The cement may have hardened more quickly in this specific section due to factors like higher temperature or different cement mix composition. 3. **Casing Obstruction:** There might be an obstruction within the casing, such as debris or a collapsed section, hindering the drilling out process. **Possible Solutions:** 1. **Adjust Drilling Parameters:** Modify the drilling assembly (e.g., change the type of milling tool or increase drilling weight) to improve cement removal efficiency. 2. **Chemical Treatment:** Consider using a chemical treatment to soften or break down the hardened cement, making it easier to remove. 3. **Mechanical Removal:** Use a specialized tool, such as a wireline cutter, to remove any obstructions within the casing, allowing the drilling out process to continue.


Books

  • Petroleum Engineering Handbook: This comprehensive handbook covers various aspects of oil and gas engineering, including well completion and drilling out procedures.
  • Well Completion Design and Operations: This book provides detailed information on well completion techniques, including drilling out methods and challenges.
  • Modern Well Completion Techniques: This resource delves into various well completion strategies, with dedicated sections on cementing and drilling out operations.

Articles

  • Drilling Out: A Critical Step in Well Completion (SPE Journal): This article discusses the importance of drilling out, its challenges, and best practices.
  • Cement Removal Techniques in Well Completion Operations (Journal of Petroleum Technology): This article explores different methods for cement removal and their effectiveness.
  • Drilling Out Cement for Well Completion: A Review of the Process and Associated Challenges (Published in a relevant industry journal or conference proceedings): Search for relevant research papers on cement removal in well completion through online databases.

Online Resources

  • Society of Petroleum Engineers (SPE): SPE offers a vast collection of technical papers and articles on oil and gas engineering, including those related to well completion and drilling out. Their website includes a searchable database.
  • International Association of Drilling Contractors (IADC): The IADC website contains resources and publications on drilling and completion practices, including information on cement removal.
  • Schlumberger Oilfield Glossary: This online glossary provides definitions and explanations of oilfield terminology, including drilling out and related processes.

Search Tips

  • Specific keywords: Use terms like "drilling out cement," "cement removal well completion," "cement milling," "well completion techniques," and "drilling out challenges."
  • Combine keywords with industry terms: Include terms like "oil and gas," "petroleum engineering," "wellbore," "casing," and "production."
  • Specify sources: Include terms like "SPE journal," "Journal of Petroleum Technology," or "Schlumberger" to target specific publications or organizations.
  • Use quotation marks: Enclose specific phrases in quotation marks to find exact matches. For example, "drilling out cement techniques."
  • Use advanced search operators: Use "site:" to search within a specific website. For example, "site:spe.org drilling out cement."

Techniques

Similar Terms
Drilling & Well Completion
Quality Control & Inspection
Safety Training & Awareness
  • Ball-Out Balling Out: A Critical Techn…
Incident Investigation & Reporting
  • Blowout Blowout: When Wells Run Amok …
Most Viewed

Comments

No Comments
POST COMMENT
captcha
Back