What is Discontinuous Activity used in Oil & Gas Specific Terms?
سئل 3 أشهر، 3 أسابيع منذ | شوهد 91مرة
0

In the context of Oil & Gas operations, how does the term "Discontinuous Activity" differ from "Continuous Activity" in relation to:

a) Environmental impact assessment and mitigation: * What specific activities are considered discontinuous, and how are their environmental impacts assessed and mitigated compared to continuous activities? * Are there specific regulatory requirements or guidelines for discontinuous activities that differ from continuous activities?

b) Resource management and optimization: * How does the discontinuous nature of specific activities affect resource allocation, scheduling, and overall project management? * What are the challenges associated with managing discontinuous activities, and how are they addressed in an oil and gas context?

c) Safety and operational risks: * How does the discontinuous nature of certain activities contribute to safety risks and how are these risks mitigated? * Are there specific safety protocols or procedures developed for discontinuous activities, and how do these differ from protocols for continuous activities?

d) Cost and profitability: * What are the economic implications of discontinuous activities compared to continuous activities? * How do factors like downtime, equipment utilization, and logistical complexities affect the cost and profitability of discontinuous activities?

This question aims to delve into the nuances of "Discontinuous Activity" as a term within the Oil & Gas industry, focusing on its impact on various aspects of the operation, from environmental considerations to safety and economic performance.

إنشاء تعليق على سؤال
1 إجابة (اجابات)
0

In the oil and gas industry, discontinuous activity refers to any work that is not continuous in nature, meaning it is performed in intermittent or sporadic bursts rather than constantly. It's the opposite of continuous activity, which refers to ongoing operations like production or pipeline transportation.

Here are some examples of discontinuous activities in oil and gas:

  • Drilling operations: Drilling a well is a discontinuous activity, as it involves alternating periods of drilling, tripping (raising and lowering the drill string), and other tasks.
  • Workover operations: These are repairs or modifications to existing wells, often involving intervals of work followed by periods of downtime.
  • Well stimulation: Procedures like hydraulic fracturing or acidizing are performed intermittently to enhance well productivity.
  • Maintenance and repairs: Activities like inspecting equipment, replacing parts, or performing routine maintenance are often done in bursts as needed.
  • Construction: Building new infrastructure like pipelines, platforms, or processing facilities involves periods of construction followed by intervals of testing and commissioning.

Understanding the concept of discontinuous activity is crucial for:

  • Project planning and scheduling: Discontinuous activities need to be factored into project timelines, as they can lead to delays and affect overall project efficiency.
  • Resource allocation: Planning for intermittent work requires adjusting manpower and equipment availability accordingly.
  • Cost analysis: Discontinuous activities can contribute to higher overall costs due to the need for mobilization and demobilization, and potential downtime between work periods.
  • Environmental management: Discontinuous activities may have specific environmental implications, requiring proper mitigation measures.

By understanding the different types of discontinuous activities and their implications, oil and gas companies can improve their operations, enhance efficiency, and manage costs effectively.

إنشاء تعليق على إجابة

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is Conductivity (fracture flow) used in Reservoir Engineering?
What is the scientific classification of an atom?
How to use Monte Carlo similation using python to similate Project Risks?
What is a neutron?

سحابة الكلمات الدلالية

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
إلى