1 | How does a Pre-Tender Estimate differ in its scope, methodology, and level of detail compared to a Detailed Estimate, and how does this difference influence its role in the overall cost estimation and control process for a project, particularly in relation to winning bids and managing project risk?سئل يوليو 28, 2024, 9:34 ص jilan22 0 0 0 شارات ذهبية 0 0 شارات فضية 0 0 شارات برونزية |
إنشاء تعليق على سؤال | |
1 إجابة (اجابات) | |
1 | Pre-Tender Estimate in Cost Estimation & ControlA Pre-Tender Estimate is a preliminary cost assessment used during the early stages of a project, specifically before submitting a tender bid. It's a crucial tool for evaluating the feasibility and profitability of a project before committing resources and time. Here's a breakdown of its role in cost estimation and control: Purpose:
Characteristics:
How It's Used:
Advantages:
Disadvantages:
In Conclusion: A Pre-Tender Estimate is a critical component of cost estimation and control. It allows for informed decision-making in the early stages of a project, ensuring feasibility, competitiveness, and effective resource allocation. While it provides a rough estimate, it lays the groundwork for more detailed cost analysis and effective project management. اجب يوليو 28, 2024, 9:34 ص moca83 0 0 0 شارات ذهبية 0 0 شارات فضية 0 0 {% trans "bronze badges" } |
إنشاء تعليق على إجابة | |